Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ULNRC-05902, Callaway, Unit 1, Enclosure 5: Telecon Record Re Pallid Sturgeon in Missouri River + (09:49:46, 26 July 2018)
- ULNRC-05902, Callaway, Unit 1, Enclosure 7: Preliminary Jurisdictional Wetland & Stream Determination Report for the Callaway Nuclear Plant + (09:52:46, 26 July 2018)
- ENS 53508 + (11:30:04, 26 July 2018)
- ENS 53509 + (11:30:06, 26 July 2018)
- ENS 53510 + (11:30:08, 26 July 2018)
- ENS 53512 + (11:30:11, 26 July 2018)
- ENS 53513 + (11:30:14, 26 July 2018)
- McGinniss P + (11:36:16, 26 July 2018)
- DCL-12-069, Diablo Canyon, Units 1 and 2 - Invensys Operations Management Document 993754-1-813, Validation Test Plan, Revision 1, Attachment 6 + (15:23:56, 26 July 2018)
- DCL-12-069, Diablo Canyon, Units 1 and 2 - Invensys Operations Management Document 993754-1-802, Software Verification and Validation Plan, Revision 2, Attachment 5 + (15:27:44, 26 July 2018)
- DCL-12-069, Diablo Canyon, Units 1 and 2 - Invensys Operations Management Document 993754-1-916, V10 Tricon Reference Design Change Analysis, Revision 0, Attachment 4 + (15:27:54, 26 July 2018)
- DCL-12-069, Diablo Canyon, Units 1 and 2 - Process Protection System Replacement Interface Requirements Specification (Irs), Revision 6, Attachment 3 + (15:28:17, 26 July 2018)
- DCL-12-069, Diablo Canyon, Units 1 and 2 - 08-0015-SP-001, Functional Requirements Specification, Revision 5, Attachment 2 + (15:29:34, 26 July 2018)
- TAC:ME7142 + (19:31:43, 26 July 2018)
- TAC:ME7125 + (19:55:51, 26 July 2018)
- TAC:ME8517 + (22:51:21, 26 July 2018)
- TAC:MF4381 + (01:59:20, 27 July 2018)
- TAC:MF5722 + (04:56:00, 27 July 2018)
- TAC:MF4293 + (08:49:39, 27 July 2018)
- TAC:MF3538 + (10:29:48, 27 July 2018)
- TAC:ME9564 + (15:21:29, 27 July 2018)
- TAC:MF1209 + (16:58:46, 27 July 2018)
- TAC:ME9156 + (19:00:30, 27 July 2018)
- TAC:ME8300 + (19:08:19, 27 July 2018)
- TAC:ME9429 + (19:11:21, 27 July 2018)
- RS-12-221, Braidwood, Units 1 and 2 and Byron, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Chapter 5.0 - Reactor Coolant System and Connected Systems + (19:17:09, 27 July 2018)
- RS-12-221, Braidwood, Units 1 and 2 and Byron, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Appendix C - Turbine Missile Study + (19:18:09, 27 July 2018)
- RS-12-221, Braidwood, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Chapter 2.0 - Site Characteristics, Table of Contents Through Table 2.5.53 + (19:18:59, 27 July 2018)
- BVY 12-080, Engineering Report VY-RPT-12-00019, Vermont Yankee Seismic Walkdown Submitted Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Page 205 of 505 Through Page 464 of 505 + (20:13:51, 27 July 2018)
- TAC:ME8492 + (22:23:27, 27 July 2018)
- TAC:ME9582 + (02:14:30, 28 July 2018)
- TAC:ME9219 + (02:27:05, 28 July 2018)
- ULNRC-05893, Callaway, Unit 1, Enclosure 34 to ULNRC-05893 - Callaway NPDES MO-0098001 + (04:15:49, 28 July 2018)
- ULNRC-05893, Callaway, Unit 1, Enclosure 39 to ULNRC-05893 - Burns & Mcdonnell (Burns and Mcdonnell Engineering Company) 2008. Phase Ii Hydrogeologic Investigation Report Collector Well Siting Study, Callaway Unit 2. June (Part 2 of 3) + (04:19:25, 28 July 2018)
- ULNRC-05893, Callaway, Unit 1, Enclosure 29 to ULNRC-05893 - 2011 Facility Summary Reports + (04:19:45, 28 July 2018)
- ULNRC-05893, Callaway, Unit 1, Enclosure 4 to ULNRC-05893, Figure 1, Callaway NPDES Flow Diagram. + (04:20:41, 28 July 2018)
- ULNRC-05893, Callaway, Unit 1, Enclosure 13 to ULNRC-0589 - Drawing 8600-X-88133, Building Fill & Backfill Cross Sections, Power Block + (04:22:23, 28 July 2018)
- ML12191A398 + (07:21:53, 28 July 2018)
- ML12191A397 + (07:21:58, 28 July 2018)
- TAC:ME7126 + (11:07:35, 28 July 2018)
- TAC:ME7802 + (11:10:59, 28 July 2018)
- DCL-12-050, Diablo Canyon, Units 1 and 2, Attachment 16 to DCL-12-050, PGE-12-52 Np, Westinghouse Input to Diablo Canyon Digital Process Protection System Replacement Uncertainty Calculations Summary Lar. + (14:14:16, 28 July 2018)
- DCL-12-050, Diablo Canyon, Units 1 and 2, Attachment 4 to DCL-12-050, Scm 36-01, Rev. 0, Process Protection System (PPS) Replacement Software Configuration Management Plan (SCMP) Nuclear Safety Related. + (14:14:33, 28 July 2018)
- TAC:ME7583 + (14:59:22, 28 July 2018)
- TAC:ME7124 + (14:59:27, 28 July 2018)
- TAC:ME7123 + (15:08:21, 28 July 2018)
- TAC:ME8308 + (18:25:23, 28 July 2018)
- TAC:ME4969 + (18:59:11, 28 July 2018)
- TAC:ME7703 + (19:30:25, 28 July 2018)
- TAC:ME6974 + (20:23:40, 28 July 2018)
- TAC:MR6538 + (22:09:25, 28 July 2018)