Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20090A228 + (06:10:24, 26 May 2025)
- EPID:L-2018-TOP-0017 + (06:10:52, 26 May 2025)
- TAC:48297 + (06:11:08, 26 May 2025)
- ML20088A852 + (06:11:29, 26 May 2025)
- 05000346/LER-1984-001-01, Revised LER 84-001-01:on 840108,core Imbalanced Positively & Axial Power Shaping Rods Automatically Inserted.Caused by Large Difference in Amount of Xenon in Top of Core & Failed Integrated Circuit Gate,Respectively + (06:12:01, 26 May 2025)
- 05000416/LER-1984-005-01, Updated LER 84-005-01:on 840119,drywell Purge Compressor Logic a Relay Compressor Inadvertently Started.Caused by Defective Procedure.Memo Written to All Technical Section Engineers Re Adequate Engineering Review + (06:12:06, 26 May 2025)
- 05000387/LER-1984-001-01, Updated LER 84-001-01:on 840103,H2/O2 Analyzers in Containment Atmosphere Monitoring Sys Declared Inoperable Based on Vendor Info.Caused by Catalyst Inability to Withstand Iodine Concentrations + (06:12:09, 26 May 2025)
- TAC:51000 + (06:13:30, 26 May 2025)
- 05000395/LER-1984-013, :on 840309,new Software Mod Deleted Monitoring of Smoke Detectors in Zones Fff & Mmm in Intermediate Bldg, Disabling Main Control Room Operators.Discrepancy Corrected & Detectors Tested & Verified + (06:14:42, 26 May 2025)
- 05000346/LER-1984-003, :on 840302,MSIV 2 Closed,Isolating Steam Side of Steam Generator 2.Caused by Failed Relay in Safety Instrumentation Channel.Msiv Replaced + (06:15:00, 26 May 2025)
- 0CAN038406, Responds to NRC Re Violation & Deviation Noted in IE Insp Repts 50-313/83-34 & 50-368/83-34.Corrective Actions:Instrument Removed from Controlled Access,Tagged Out of Svc & Recalibr W/O Adjustment + (06:15:58, 26 May 2025)
- DCL-84-078, Forwards Addl Info Supplementing 840217 Response to NRC Request for Info Re Use of Welded ASTM A-325 Bolting in Pipe Support Design + (06:16:30, 26 May 2025)
- 05000317/LER-1981-058-03, Emergency Diesel Generator 12 to 4 Kv Bus 21 out-of-svc.Caused by Stuck Auxiliary Contact in Emergency Diesel Generator 12 Output Breaker to 4 Kv Bus 14.Switch Replaced + (06:16:44, 26 May 2025)
- 05000325/LER-1981-053-03, During Reactor Startup, Reactor Recirculation Pump 1B Tripped.Caused by Spurious Trip Signal from ATWS Low Water Level Instrument B21-LTM- NO24B-2.Instrument Replaced + (06:17:05, 26 May 2025)
- 05000325/LER-1981-055-03, Drywell Equipment Drain Flow Integrator 1-G16-FQ-K603 Continuously Indicated Dwed Sump Flow W/No Pumps Running.Caused by Water Being Introduced Into Pneumatic Calibrator + (06:17:11, 26 May 2025)
- 05000293/LER-1980-041-03, Isolation Valves 5065-17 & 5065-22 Declared Inoperable.Caused by Valve Limits Being Out of Adjustment.Valve Items Adjusted & Exercised to Provide Correct Operation + (06:18:12, 26 May 2025)
- TAC:11946 + (06:18:16, 26 May 2025)
- BSEP-84-0637, Forwards Revs to Emergency Plan & Emergency Plan Implementing Procedures + (06:18:41, 26 May 2025)
- TAC:43647 + (06:18:57, 26 May 2025)
- 05000293/LER-1981-015-03, During Surveillance Testing,Nozzle on 23-ft Level Cardox Sys Hose Reel Failed to Deliver Adequate Stream.Caused by Operator Error.Fire Brigade Training Revised + (06:19:00, 26 May 2025)
- ML20087M944 + (06:20:02, 26 May 2025)
- TAC:54681 + (06:20:20, 26 May 2025)
- ST-HL-AE-1060, Responds to NRC Re Violations Noted in IE Insp Repts 50-498/83-22 & 50-499/83-22.Corrective Actions:Field Fabrication of All Anchor Bolts & Embed Rods Discontinued & Enhanced Matl Program Developed + (06:20:23, 26 May 2025)
- TAC:54377 + (06:20:48, 26 May 2025)
- TAC:54388 + (06:20:51, 26 May 2025)
- ML20087L332 + (06:23:30, 26 May 2025)
- ML20087L179 + (06:23:51, 26 May 2025)
- TAC:12237 + (06:24:18, 26 May 2025)
- TAC:52565 + (06:24:30, 26 May 2025)
- ML20087K624 + (06:25:00, 26 May 2025)
- TAC:52556 + (06:25:05, 26 May 2025)
- ML20087K363 + (06:25:31, 26 May 2025)
- 05000366/LER-1984-001-01, Revised LER 84-001-01:on 840203,plant Personnel Detected Fracture in 66-inch Vent Header in Bay 5.Caused by Brittle Fracture of Vent Header Matl.Vent Header Will Be Repaired Prior to Startup + (06:25:38, 26 May 2025)
- TXX-9520, Monthly Operating Repts for Jul 1995 for Cpses,Units 1 & 2 + (06:25:52, 26 May 2025)
- 05000498/LER-1995-007, :on 950719,seismic Monitor Was Inoperable for More than 30 Days & Subsequently Failed to Submit Special Rept in Accordance W/Ts.Caused by Excessive Vibration at Accelerograph.Replaced Accelerograph & Returned to Svc + (06:25:55, 26 May 2025)
- 05000327/LER-1995-011, :on 950718,power Range Neutron Flux Monitor Was Inoperable Longer than Allowed by Ts.Caused by Signal Cable from Lower Detector to Monitor Disconnected.Reconnected Cable + (06:26:53, 26 May 2025)
- ML20087J604 + (06:27:52, 26 May 2025)
- TXX-9513, Informs NRC That Current Order Timing & Surveillance Mods Have Been Implemented in Unit 1 & Complete as of 950420 + (06:28:39, 26 May 2025)
- ML20087J061 + (06:28:49, 26 May 2025)
- 05000335/LER-1981-039-03, During Power Operation, PORV Block Valve MV1403 Would Not Close.Caused by Loose Electrical Connection on Valve Limit Switch.Connection Tightened During Oct 1981 Refueling + (06:28:51, 26 May 2025)
- 05000259/LER-1984-014-01, Updated LER 84-014-01:on 840222,reactor Scrammed When Turbine High Pressure First Stage Pressure Exceeded 142 Psig W/Turbine Stop Valves Closed.Caused by Procedural Error. Operating Instruction Revised + (06:29:01, 26 May 2025)
- 05000263/LER-1984-011, :on 840218 & 23,crack Indications Detected on Loop Jet Pump B Instrument Seal & on Loops a & B of RHR LPCI Lines.Caused by Intergranular Stress Corrosion Cracking.Affected Matls Replaced + (06:29:30, 26 May 2025)
- L-95-015, Comment Supporting Proposed Rule 10CFR52 Re ABWR Design & Sys 80+ Design + (06:30:02, 26 May 2025)
- TXX-9512, 1994 Annual Environ Operating Rept (Nonradiological). W/ + (06:30:15, 26 May 2025)
- 05000266/LER-1995-006, :on 950714,reactor Tripped Due to Loss of Generator Excitation as Result of Accumulation of Condensation.Unit 1 Generator Exciter Inspected & Repaired & Flow of CW to Unit 1 Exciter Cooler Reduced + (06:30:24, 26 May 2025)
- L-95-014, TER on First 10-Yr Interval ISI Program Plan:Tuec,Cpses, Unit 2 + (06:30:33, 26 May 2025)
- 05000498/LER-1995-004, :on 950328,failed to Meet Requirements of TS Due to Not Testing Contact of Load Sequencer Relay.Assembled Surveillance Credit Package for All Trains of Engineered Safety Features Diesel loss-of-offsite-power Surveillances + (06:30:43, 26 May 2025)
- 05000458/LER-1993-002, :on 930212,TS SR Not Properly Implemented in Logic Sys Functional Tests.Caused by Less than Adequate Reviews During Procedure Development Stage.Established Procedural Requirements + (06:30:45, 26 May 2025)
- RA20-014, Cycle 19 and Cycle 18 Core Operating Limits Reports + (06:31:41, 26 May 2025)
- 05000361/LER-1984-009, :on 840214,analysis of Startup Test Data Established Calculated Thermal Power Calculated by Core Protection Calculators May Become Decalibr Relative to Secondary Calorimetric Power.Procedure Changed + (06:31:48, 26 May 2025)