Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19332F506 + (23:06:02, 25 December 2024)
- 05000334/LER-1989-013-01, :on 891112,4 Kv Bus 1A Power Supply Breaker Tripped on Phase overcurrent,de-energizing Emergency Bus 1A. Caused by Incorrect Tap Setting on Overcurrrent Relay.Relay Taps Reset & Breaker Replaced + (23:06:03, 25 December 2024)
- ML19332F504 + (23:06:10, 25 December 2024)
- PNO-IV-89-069, on 891211,RCS Leaked from Two HPI Sys Series Vent Valves Into Reactor Bldg Cavity.Caused by Excessive Vibration of HPI Sys.Complete Sys Walkdown Being Performed. on 891210,two Personnel Contamination Events Occurred + (23:06:16, 25 December 2024)
- RA89-010, Provides Notice of DC Ashworth Permanent Reassignment. DC Ashworth Reactor Operator License Should Be Terminated as of 891124 + (23:06:17, 25 December 2024)
- ML19332F491 + (23:06:20, 25 December 2024)
- ML19332F489 + (23:06:20, 25 December 2024)
- ML19332F487 + (23:06:29, 25 December 2024)
- ML19332F486 + (23:06:30, 25 December 2024)
- ML19332F485 + (23:06:31, 25 December 2024)
- ML19332F483 + (23:06:32, 25 December 2024)
- ML19332F479 + (23:06:33, 25 December 2024)
- ML19332F480 + (23:06:33, 25 December 2024)
- ST-HL-AE-3309, Forwards for Info,Revised Correspondence Distribution List of Designated Recipients + (23:06:34, 25 December 2024)
- 05000333/LER-1989-022, :on 891107,determined That Elastomeric Seals in 33 Snubbers Had Not Been Replaced within Plant 7-yr Svc Life Guideline.Caused by Failures in Mgt of Maint Records. Snubbers Replaced as Necessary + (23:06:37, 25 December 2024)
- ML19332F472 + (23:06:39, 25 December 2024)
- ML19332F471 + (23:06:45, 25 December 2024)
- ML19332F469 + (23:06:51, 25 December 2024)
- ST-HL-AE-3305, Forwards Executed Amend 6 to Indemnity Agreement B-108 + (23:06:52, 25 December 2024)
- ML19332F462 + (23:06:59, 25 December 2024)
- ML19332F463 + (23:06:59, 25 December 2024)
- ML19332F460 + (23:07:00, 25 December 2024)
- ML19332F456 + (23:07:06, 25 December 2024)
- ML19332F458 + (23:07:06, 25 December 2024)
- 05000289/LER-1989-001-02, :on 891030,operator Error Resulted in Inadvertent Actuation of Es Components B.No Equipment Was Damaged & Vol of Water Injected Into RCS Minimal.Operators Counseled + (23:07:07, 25 December 2024)
- ML19332F454 + (23:07:14, 25 December 2024)
- ML19332F452 + (23:07:19, 25 December 2024)
- 05000333/LER-1989-020, :on 891105,reactor Scram Occurred Due to Failure in Electronic Control Card of electro-hydraulic Control Sys.Caused by Void Collapse in Core Moderator. Circuit Boards Sent to Vendor for Analysis + (23:07:21, 25 December 2024)
- ML19332F450 + (23:07:28, 25 December 2024)
- ML19332F448 + (23:07:34, 25 December 2024)
- ML19332F445 + (23:07:40, 25 December 2024)
- ML19332F444 + (23:07:40, 25 December 2024)
- ML19332F443 + (23:07:41, 25 December 2024)
- ML19332F441 + (23:07:46, 25 December 2024)
- ML19332F439 + (23:07:47, 25 December 2024)
- ML19332F438 + (23:07:47, 25 December 2024)
- ML19332F437 + (23:07:48, 25 December 2024)
- ML19332F435 + (23:07:54, 25 December 2024)
- ML19332F434 + (23:07:55, 25 December 2024)
- ML19332F433 + (23:07:55, 25 December 2024)
- ML19332F432 + (23:07:56, 25 December 2024)
- ML19332F431 + (23:08:04, 25 December 2024)
- ML19332F428 + (23:08:05, 25 December 2024)
- ML19332F429 + (23:08:05, 25 December 2024)
- ML19332F427 + (23:08:06, 25 December 2024)
- ML19332F426 + (23:08:12, 25 December 2024)
- ML19332F425 + (23:08:18, 25 December 2024)
- ML19332F424 + (23:08:24, 25 December 2024)
- ML19332F411 + (23:08:31, 25 December 2024)
- ML19332F410 + (23:08:37, 25 December 2024)
- ML19332F408 + (23:08:38, 25 December 2024)