- ML19340D833 + (23:01:16, 24 December 2024)
- ML19340D832 + (23:01:17, 24 December 2024)
- 05000271/LER-1980-040-03, /03L-0:on 801130,discovered Continuous Environ Air Samples at Sample Station AT2.2 Not Being Drawn.Caused by Main Fuse Blowing Out.Entire Station Replaced & Electrical Surge Suppressor Installed + (23:01:18, 24 December 2024)
- 05000368/LER-1980-091, Forwards LER 80-091/01T-0 + (23:01:20, 24 December 2024)
- ML19340D828 + (23:01:21, 24 December 2024)
- 05000266/LER-1980-014, Forwards LER 80-014/01T-0 + (23:01:22, 24 December 2024)
- PM-80-123, Ro:On 801213,sprinkler Sys Providing Protection for Reactor Bldg Heating,Ventilation & Air Conditioning Had Been Inoperative for 14 Days.Caused by Implementation of Design Mods to Bring Sys Into NFPA Code Compliance + (23:01:23, 24 December 2024)
- ML19340D824 + (23:01:27, 24 December 2024)
- 05000271/LER-1980-040, Forwards LER 80-040/03L-0 + (23:01:28, 24 December 2024)
- ML19340D821 + (23:01:29, 24 December 2024)
- ML19340D820 + (23:01:31, 24 December 2024)
- 05000320/LER-1980-058-01, /01P-0:on 801223,determined That Placing Radiation Monitor HRP-220 in Defeat on 801219 Constituted Reportable Condition.Caused by Instrument Malfunction.Repairs Completed + (23:01:32, 24 December 2024)
- ML19340D818 + (23:01:33, 24 December 2024)
- ML19340D816 + (23:01:34, 24 December 2024)
- ML19340D815 + (23:01:35, 24 December 2024)
- 05000133/LER-1980-007-03, /03L-0:on 801130,sparks Observed Coming from Fire Pump 2 Diesel Engine Fan Area During Testing.Caused by Pulley Sheave Mounting Flange Breaking Away from Hub.New Part Mfg on Site + (23:01:41, 24 December 2024)
- 05000133/LER-1980-007, Forwards LER 80-007/03L-0 + (23:01:45, 24 December 2024)
- ML19340D808 + (23:01:46, 24 December 2024)
- 05000317/LER-1980-065-01, /01T-1:on 801215,charging Pumps Discovered Running W/Shutdown Cooling Flow Secured.Caused by Operator Failure to Perform Surveillance Requirements of Tech Specs. Requirements Reviewed W/Personnel + (23:01:47, 24 December 2024)
- 05000317/LER-1980-065, Forwards LER 80-065/01T-1 + (23:01:49, 24 December 2024)
- 05000254/LER-1980-032-01, /01T-0:on 801211,during Installation of Hanger Per IE Bulletin 79-14,two 1/2-inch Anchor Bolt Holes Were Drilled Which Penetrated Primary Containment.Caused by Faulty Design.Plugs Welded in Holes + (23:01:51, 24 December 2024)
- 05000409/LER-1980-012-03, /03L-0:on 801124,soil Sample Under Feedwater Heater Area of Turbine Bldg Found Slightly Contaminated. Caused by Drilling Hole in Bldg Floor or When Floor Was Washed Prior to Grouting.Surveillance Program Established + (23:01:52, 24 December 2024)
- 05000254/LER-1980-032, Forwards LER 80-032/01T-0 + (23:01:54, 24 December 2024)
- 05000368/LER-1980-064-03, High Containment Pressure Trip Received from PPS a & D.On 801203,steam Generator B Low Level Trip Circuit for PPS a Was Inoperable.Caused by Bistable Comparator Card Power Supply Failures + (23:01:56, 24 December 2024)
- 05000409/LER-1980-012, Forwards LER 80-012/03L-0 + (23:01:59, 24 December 2024)
- 05000368/LER-1980-064, Forwards Revised LER 80-064/03X-1 + (23:02:00, 24 December 2024)
- 05000409/LER-1980-013-03, /03L-0:on 801127,during Periodic Leakage Rate Testing,Electrical Penetration Unit 6 Was Determined to Exceed Tech Specs Limits.Caused by Cracked Gland on Individual Penetration 29B.Gland Was Soldered + (23:02:03, 24 December 2024)
- 05000409/LER-1980-013, Forwards LER 80-013/03L-0 + (23:02:08, 24 December 2024)
- 05000368/LER-1980-087, Forwards LER 80-087/03L-0 + (23:02:10, 24 December 2024)
- 05000368/LER-1980-088, Forwards LER 80-088/03L-0 + (23:02:15, 24 December 2024)
- ML19340D783 + (23:02:16, 24 December 2024)
- AECM-80-318, Status Rept 4 Re Potential Reportable Deficiency 80/04 Concerning Loss of Site Power on Rod Position Indication & Neutron Monitoring.Matter Is Under Review.Determination of Reportability & Final Rept Due by 810421 + (23:02:17, 24 December 2024)
- 05000304/LER-1980-030-03, /03L-0:on 801124,svc Water Inlet Valve, 2MOV-SW0002,failed to Stroke to Full Open Position.No Cause Stated.Valve Operator & Control Circuit Repaired + (23:02:19, 24 December 2024)
- 05000304/LER-1980-030, Forwards LER 80-030/03L-0 + (23:02:21, 24 December 2024)
- AECM-80-317, Status Rept 8 Re Potential Reportable Deficiency 79/05 Concerning Discrepancies in Design Documentation for Power Generation Control Complex Panels.Corrective Actions by Supplier Are Not Finalized.Final Rept Scheduled by 810324 + (23:02:22, 24 December 2024)
- ML19340D774 + (23:02:24, 24 December 2024)
- 05000313/LER-1980-041-03, /03L-0:on 801128,lead Dihydrogen Purge Supply Fan, VSF-30A,tripped.Caused by Blown Control Fuse Due to Overcurrent.Control Power Fuse & Control Transformer Increased to Accommodate Increased Load + (23:02:25, 24 December 2024)
- ML19340D772 + (23:02:26, 24 December 2024)
- ML19340D771 + (23:02:27, 24 December 2024)
- 05000313/LER-1980-041, Forwards LER 80-041/03L-0 + (23:02:28, 24 December 2024)
- TXX-3247, Submits Suppl to Util 800808 Rept Re Architectural Topping Placed on Floor Slabs.Project Completion Anticipated 810801 + (23:02:30, 24 December 2024)
- ML19340D766 + (23:02:30, 24 December 2024)
- ML19340D762 + (23:02:32, 24 December 2024)
- ML19340D761 + (23:02:33, 24 December 2024)
- ML19340D760 + (23:02:34, 24 December 2024)
- ML19340D759 + (23:02:35, 24 December 2024)
- ML19340D758 + (23:02:36, 24 December 2024)
- ML19340D757 + (23:02:37, 24 December 2024)
- ML19340D754 + (23:02:42, 24 December 2024)
- ML19340D751 + (23:02:43, 24 December 2024)
- ML19340D750 + (23:02:43, 24 December 2024)