Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML16081A323 + (10:20:20, 20 November 2019)
- ML16069A404 + (10:27:27, 20 November 2019)
- ENS 54042 + (12:30:05, 20 November 2019)
- ENS 54338 + (12:30:08, 20 November 2019)
- ENS 54376 + (12:30:12, 20 November 2019)
- Hot Short + (15:43:40, 20 November 2019)
- ESWGR + (15:58:33, 20 November 2019)
- NRC/NRR/DIPM/IROB + (16:32:07, 20 November 2019)
- Job Performance Measure + (22:22:21, 20 November 2019)
- IR 05000382/2015407 + (02:19:59, 21 November 2019)
- IR 05000338/2016301 + (02:53:53, 21 November 2019)
- IR 05000354/2015007 + (03:31:49, 21 November 2019)
- ENS 54381 + (12:30:03, 21 November 2019)
- ENS 54383 + (12:30:06, 21 November 2019)
- SWGR + (19:35:38, 21 November 2019)
- ENS 54401 + (12:30:08, 22 November 2019)
- TAC:D92004 + (22:51:19, 22 November 2019)
- L-09-011, First Energy Nuclear Operating Company - Davis Besse, 2008 Independent Assessment of the Davis-Besse Nuclear Power Station Safety Culture and Safety Conscious Work Environment Report + (00:49:28, 23 November 2019)
- ULNRC-05551, Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems. + (01:38:33, 23 November 2019)
- W3F1-2007-0065, Response to NRC RAI on GL 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients + (04:49:22, 23 November 2019)
- LR-N07-0316, Response to RAI on NRC Generic Letter 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients. + (04:50:23, 23 November 2019)
- IR 05000237/2007201 + (04:50:48, 23 November 2019)
- RS-07-156, Company, Llc/Amergen Energy Company, LLC Response to the Request for Additional Information (RAI) Regarding Resolution of NRC Generic Letter 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident. + (04:56:01, 23 November 2019)
- NL-05-0133, Revised Request for Extension of Completion Date for Indian Point Unit 3 Corrective Actions & Modifications Required by Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents a + (04:57:41, 23 November 2019)
- L-07-142, Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors - Request for Extension of Completion Date for Corrective Actions + (04:58:43, 23 November 2019)
- L-2007-155, Request for Extension of Completion Date of the Generic Letter 2004-02 Actions + (04:58:46, 23 November 2019)
- RNP-RA/07-0129, Response to NRC Request for Additional Information Related to Generic Letter 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients + (04:58:49, 23 November 2019)
- NL-07-1969, Generic Letter 2004-02 Response Extension Request + (04:59:55, 23 November 2019)
- NL-07-2245, Generic Letter 2004-02 Response Extension Request - Chemical Effects + (04:59:57, 23 November 2019)
- L-PI-07-093, Request for Extension of Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors. + (05:02:38, 23 November 2019)
- NOC-AE-07002244, Withdrawal of Proposed Amendment to Technical Specification Re Revision of the Spent Fuel Pool and In-Containment Storage Area Criticality Analysis + (05:06:09, 23 November 2019)
- GO2-07-164, Response to Request for Additional Information Related to GL-07-001 + (05:06:11, 23 November 2019)
- NOC-AE-07002225, Transmittal of South Texas Project, Units 1 and 2 - Response to NRC Request for Additional Information on Proposed Change to Surveillance Requirement 4.5.2.d + (05:07:01, 23 November 2019)
- NRC 2007-0074, Clarification of Response to Request for Information Regarding Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power. + (05:08:58, 23 November 2019)
- ML073340921 + (05:12:38, 23 November 2019)
- NOC-AE-07002233, Transmittal of WCAP-16636-P and WCAP-16636-NP, Revision 0, Structural Integrity Evaluation of Reactor Vessel Upper Head Penetrations to Support Continued Operation: South Texas Project Units 1 and 2. + (05:16:54, 23 November 2019)
- NOC-AE-07002223, Response to Request for Additional Information on Proposed Amendment for Alternate Radiological Source Term (AST) Methodology + (05:25:22, 23 November 2019)
- ML073240008 + (05:31:49, 23 November 2019)
- NRC 2007-0085, Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors + (05:32:34, 23 November 2019)
- NOC-AE-07002231, Request for Relaxation of Requirements from Revision 1 of Order EA-03-009 Establishing Interim Inspection Requirements for Reactor Pressure Vessel Head Penetrations (Relief Request RR-ENG-2-46) + (05:33:17, 23 November 2019)
- W3F1-2007-0051, Request for Extension of Completion Date for Corrective Actions Required by Generic Letter 2004-02 + (05:35:57, 23 November 2019)
- ML073190418 + (05:36:48, 23 November 2019)
- ML073190416 + (05:36:51, 23 November 2019)
- L-HU-07-029, Generic Letter 2003-01, Control Room Habitability, Commitment Change + (05:37:42, 23 November 2019)
- NOC-AE-07002214, Changes and Additions to NRC Distribution Lists + (05:49:20, 23 November 2019)
- NOC-AE-07002224, Supplement to Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI Requirements for the Essential Cooling Water System + (06:08:52, 23 November 2019)
- NL-07-077, Proposed Changes to the Technical Specifications Regarding Replacement of the Trisodium Phosphate Buffer with Sodium Tetraborate + (06:17:52, 23 November 2019)
- NL-07-098, Request for Extension of Completion Date for Indian Point Unit 3 Corrective Actions and Modifications Required by Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Press + (06:17:55, 23 November 2019)
- BSEP 07-0109, Withdrawal of Request for Relief to Use of the Boiling Water Reactor Vessel and Internals Project (Bwrip) Guidelines in Lieu of Specific ASME Code Requirements + (06:21:05, 23 November 2019)
- RC-07-0143, Response to NRC Questions Regarding Response to Generic Letter 96-06 + (06:23:51, 23 November 2019)
- L-PI-07-077, Nonfiction of Change to Commitment Made in the Prairie Island Nuclear Generating Plant (PINGP) 30-Day Response to NRC Bulletin 2003-02 + (06:25:03, 23 November 2019)