Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20005G013 + (12:58:53, 23 December 2024)
- ML20005G012 + (12:58:54, 23 December 2024)
- ML20005G007 + (12:59:01, 23 December 2024)
- ML20005F995 + (12:59:10, 23 December 2024)
- ML20005F987 + (12:59:19, 23 December 2024)
- ML20005F983 + (12:59:20, 23 December 2024)
- ML20005F976 + (12:59:27, 23 December 2024)
- TAC:74480 + (12:59:33, 23 December 2024)
- ML20005F975 + (12:59:33, 23 December 2024)
- ML20005F974 + (12:59:39, 23 December 2024)
- ML20005F970 + (12:59:46, 23 December 2024)
- 05000456/LER-1989-017-05, :on 891206,gas Detector Channel of Process Radiation Monitor Experienced Spike,Resulting in Alert Alarm.On 891210,spike on Channel Resulted in High Radiation Alarm.Caused by Failed Detector + (12:59:48, 23 December 2024)
- ML20005F954 + (12:59:56, 23 December 2024)
- ML20005F949 + (12:59:57, 23 December 2024)
- ML20005F951 + (12:59:57, 23 December 2024)
- ML20005F945 + (13:00:03, 23 December 2024)
- 05000352/LER-1989-060, :on 891212,standby Gas Treatment Sys Charcoal Filter a Discovered to Be Degraded W/Possible Bypass Leakage Paths.On 891218,filter B Found W/Similar Condition.Caused by Failure of Spot Welds.Filters Repaired + (13:00:05, 23 December 2024)
- ML20005F937 + (13:00:07, 23 December 2024)
- ML20005F934 + (13:00:08, 23 December 2024)
- ML20005F933 + (13:00:09, 23 December 2024)
- ML20005F932 + (13:00:14, 23 December 2024)
- ML20005F929 + (13:00:20, 23 December 2024)
- ML20005F925 + (13:00:21, 23 December 2024)
- ML20005F920 + (13:00:27, 23 December 2024)
- ML20005F913 + (13:00:34, 23 December 2024)
- ML20005F907 + (13:00:40, 23 December 2024)
- ML20005F905 + (13:00:41, 23 December 2024)
- 0CAN019009, Discusses Util Plan for Submittal of Responses to 891128 SALP Repts 50-313/89-34 & 50-368/89-34 & 891221 Diagnostic Evaluation Team Rept.Util Plans to Combine Responses to Both Repts Into One Rept for Submittal on 900219 + (13:00:42, 23 December 2024)
- TAC:74651 + (13:00:44, 23 December 2024)
- ML20005F894 + (13:00:50, 23 December 2024)
- 05000213/LER-1989-022, :on 891212,determined That Lift Setpoints for Two Pressurizer Safety Valves Were High.Caused by Drift of Safety Valve Lift Setting Over Last Operating Cycle.Both Valves Readjusted & Satisfactorily Tested + (13:00:59, 23 December 2024)
- 05000334/LER-1989-015-01, :on 891213,operator Incorrectly Restored Solid State Protection Sys Generating Low Steamline Pressure Safety Injection Signal.Caused by Operator Error.Plant Restored to pre-safety Injection Condition + (13:01:01, 23 December 2024)
- 05000327/LER-1989-035, :on 891210,turbine/reactor Trip Occurred from hi-hi Feedwater Level of 75% in Steam Generator 3.Caused by Failure of Loop 3 Main Feedwater Regulating Valve to Close. Equipment Adjusted & Repaired + (13:01:03, 23 December 2024)
- 05000338/LER-1989-018-01, :on 891219,determined That Three Pressurizer Pressure Safety Injection Instrumentation Channels May Not Have Adequate Margin Between Actuation Setpoint & Bottom of Instrument Span + (13:01:06, 23 December 2024)
- ML20005F877 + (13:01:07, 23 December 2024)
- 05000277/LER-1989-031-01, :on 891206,discovered That Four Agastat Relays Not Properly Secured by Seismic Support Straps.Root Cause Under Investigation & Will Be Reported in Rev to Ler.Support Straps Promptly Reconnected + (13:01:09, 23 December 2024)
- ML20005F869 + (13:01:10, 23 December 2024)
- 05000322/LER-1989-010, :on 891212,unplanned Actuation of ESF Control Room Air Conditioning Train a Occurred.Caused by Removal of Leads from Relay During Test to Prevent ESF Sys Actuations. Electrical Relay Replaced & Wiring Mod Made + (13:01:11, 23 December 2024)
- RBG-32065, Special Rept:On 891211,invalid Failure of Div II Diesel Generator Occurred During Monthly Surveillance Test Procedure STP-309-0202.Caused by Failed GE Breaker in Exhaust Fan.Breaker Replaced & Generator Returned to Svc + (13:01:14, 23 December 2024)
- ML20005F852 + (13:01:16, 23 December 2024)
- 05000423/LER-1989-034, :on 891211,partial Train B Containment Depressurization Actuation Signal Generated During Slave Relay Testing.Caused by Personnel Error.Individual Counseled & Testing Procedures Revised + (13:01:17, 23 December 2024)
- 05000293/LER-1989-039, :on 891209,automatic Actuation of RHR Sys Portion of Primary Containment Isolation Control Sys Occurred.Caused by Hydrodynamic Transient That Actuated Protective High Pressure Switches + (13:01:19, 23 December 2024)
- JAFP-90-0014, Responds to NRC Re Violations Noted in Insp Rept 50-333/89-10.Corrective Action:Audits Identified as Not Being Completed within Required Time Period Completed Prior to 891101 + (13:01:21, 23 December 2024)
- ML20005F842 + (13:01:23, 23 December 2024)
- ML20005F838 + (13:01:24, 23 December 2024)
- SNRC-1667, Notifies of Termination of Employment of G Good & G Bobka as Licensed Reactor Operators + (13:01:28, 23 December 2024)
- U-601582, Special Rept:On 891219,differential Air Temp Instrumentation Inoperable for More than 7 Days.Caused by Problem in Temp Probe on Meteorological Tower.Tower Differential Temp Instrumentation Declared Operable on 891229 + (13:01:31, 23 December 2024)
- ML20005F809 + (13:01:38, 23 December 2024)
- ML20005F808 + (13:01:39, 23 December 2024)
- ML20005F802 + (13:01:45, 23 December 2024)
- ML20005F797 + (13:01:46, 23 December 2024)