Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000320/1988013 + (22:43:38, 22 May 2025)
- IR 05000320/1988005 + (22:43:41, 22 May 2025)
- IR 05000382/1988025 + (22:44:19, 22 May 2025)
- ML20244A874 + (22:44:33, 22 May 2025)
- ML20244A842 + (22:44:42, 22 May 2025)
- ML20244A837 + (22:44:46, 22 May 2025)
- IR 05000289/1974035 + (22:44:49, 22 May 2025)
- ML20244A792 + (22:45:01, 22 May 2025)
- ML20244A732 + (22:45:19, 22 May 2025)
- TAC:60703 + (22:45:27, 22 May 2025)
- IR 05000223/1988001 + (22:45:34, 22 May 2025)
- IR 05000313/1988047 + (22:45:36, 22 May 2025)
- NUREG-1262, Discusses Review of Plant Simulation Facility Development Plan,Submitted on 880526.Overall Approach of Plan Acceptable Due to Reliance on Util Simulation Facility Group Baseline Document.Issues Requiring Resolution Stated + (22:47:33, 22 May 2025)
- TAC:11431 + (22:49:53, 22 May 2025)
- ML20244A634 + (22:50:51, 22 May 2025)
- TAC:07939 + (22:50:54, 22 May 2025)
- TAC:06596 + (22:50:55, 22 May 2025)
- TAC:8291 + (22:51:08, 22 May 2025)
- TAC:52039 + (22:51:19, 22 May 2025)
- TAC:7317 + (22:51:24, 22 May 2025)
- ML20244A452 + (22:51:48, 22 May 2025)
- TAC:07329 + (22:51:53, 22 May 2025)
- PMNS20200919, Notice of Meeting with Southern Nuclear Operating Company + (22:52:17, 22 May 2025)
- ML20244A154 + (22:52:20, 22 May 2025)
- NL-20-0785, Southern Nuclear Operating Co - Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements + (22:52:54, 22 May 2025)
- EPID:L-2019-LLA-0115 + (22:52:56, 22 May 2025)
- ML20241A151 + (22:53:00, 22 May 2025)
- L-20-019, Request for Approval of HDI Fleet Decommissioning Quality Assurance Program, Revision 0 + (22:53:11, 22 May 2025)
- ML20240A252 + (22:53:28, 22 May 2025)
- ML20240A155 + (22:53:47, 22 May 2025)
- PMNS20200925, Advanced Reactor Stakeholder Meeting to Discuss Technology Inclusive Content of Application Project, the Advanced Reactor Content of Application Project and Construction Permit Guidance + (22:53:52, 22 May 2025)
- ML20239A900 + (22:53:58, 22 May 2025)
- EPID:L-2020-LLA-0068 + (22:54:06, 22 May 2025)
- PMNS20201008, Reactor Oversight Process Public Meeting + (22:54:07, 22 May 2025)
- IR 05000498/1987071 + (22:54:38, 22 May 2025)
- TAC:66940 + (22:55:22, 22 May 2025)
- IR 05000277/1985023 + (22:55:38, 22 May 2025)
- IR 05000327/1987037 + (22:59:54, 22 May 2025)
- 05000346/LER-1996-008-02, Forwards LER 96-008-02 Which Revises Corrective Actions Taken for 961113 Event.Changes Are Marked W/Rev Bar in Margin + (23:01:03, 22 May 2025)
- 05000413/LER-1998-014, :on 980805,both DGs Inoperable,Resulting in Failure to Perform DG Surveillance within Required Surveillance Interval,Was Revealed.Caused by Misinterpretation of Ts.Ts 4.0.3 Entered + (23:01:06, 22 May 2025)
- 05000423/LER-1998-012, :on 980218,potential Failure of Rhrps Due to Loss of Mim Flow Protection,Was Reported.Caused by Lack of Documented Review & Analysis of Historical Design Deficiency.Performed DCR M3-98013 + (23:01:13, 22 May 2025)
- IR 05000482/1998014 + (23:01:32, 22 May 2025)
- 05000413/LER-1998-013, :on 980709,noncompliance W/Tech Specs Identified During Review of Radiation Protection Procedure. Caused by Incorrect TS Requirements Contained in Radiation Protection Procedures.Procedures Revised + (23:01:35, 22 May 2025)
- 05000498/LER-1998-005, :on 980806,noted Failure to Meet Requirements of TS Surveillance 4.5.1.1 for Verifying ECCS Accumulator Volume & Pressure.Caused by Programmatic Problems in Setpoint Program at Stp.Established Temporary Logs in CRs + (23:01:41, 22 May 2025)
- IR 05000395/1998006 + (23:01:57, 22 May 2025)
- 05000336/LER-1997-020-03, Forwards LER 97-020-03,documenting Condition That Was Discovered at Mnps,Unit 2,on 970423.LER Supplements Update on Analyses & Investigation of Condition.Commitments Made by Util Are Included in Attachment 1 + (23:02:01, 22 May 2025)
- 05000461/LER-1998-025, :on 860929,repeated Failures of Switchgear Heat Removal Condenser Gasket Occurred.Caused by Inadequate Design Consideration of Pressure Transient Effects of Shutdown SWS Components.Installed blow-out Resistant Gasket + (23:02:08, 22 May 2025)
- IR 05000313/1998015 + (23:02:16, 22 May 2025)
- IR 05000373/1998017 + (23:02:19, 22 May 2025)
- TAC:66008 + (23:02:24, 22 May 2025)
- ML20239A129 + (23:03:13, 22 May 2025)