Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- RS-13-009, Clinton, Unit 1, Updated Safety Analysis Report, Revision 15, Chapter 11 - Radioactive Waste Management + (17:08:30, 19 July 2018)
- RS-13-009, Clinton, Unit 1, Updated Safety Analysis Report, Revision 15, Chapter 10 - Steam and Power Conversions System + (17:08:52, 19 July 2018)
- NG-16-0225, LER 16-003-00 for Duane Arnold Energy Center Regarding Main Steam Isolation Valve Leakage Exceeded Technical Specification Limit + (17:09:22, 19 July 2018)
- NG-16-0226, LER 16-002-00 for Duane Arnold Energy Center Regarding Unplanned RCIC Inoperability Results in Safety Functional Failure + (17:09:28, 19 July 2018)
- RS-13-009, Clinton, Unit 1, Updated Safety Analysis Report, Revision 15, Chapter 8 - Electric Power + (17:10:33, 19 July 2018)
- RS-13-009, Clinton, Unit 1, Updated Safety Analysis Report, Revision 15, Chapter 7 - Instrumentation and Control Systems + (17:11:21, 19 July 2018)
- RS-13-009, Clinton, Unit 1, Updated Safety Analysis Report, Revision 15, Chapter 5 - Reactor Coolant System and Connected Systems + (17:12:07, 19 July 2018)
- RS-13-009, Clinton, Unit 1, Updated Safety Analysis Report, Revision 15, Chapter 4 - Table of Contents Through Figure 4.6-30 + (17:12:33, 19 July 2018)
- RS-13-009, Clinton, Unit 1, Updated Safety Analysis Report, Revision 15, Chapter 3 - Design of Structures, Components, Equipment and Systems + (17:13:25, 19 July 2018)
- RS-13-009, Clinton, Unit 1, Updated Safety Analysis Report, Revision 15, Chapter 2 - Site Characteristics, Figures A2.5-1 Through C2.5-23 + (17:14:52, 19 July 2018)
- RS-13-009, Clinton, Unit 1, Updated Safety Analysis Report, Revision 15, Chapter 2 - Site Characteristics, Figures 2.5-300 Through 2.5-496 + (17:19:31, 19 July 2018)
- RS-13-009, Clinton, Unit 1, Updated Safety Analysis Report, Revision 15, Chapter 2 - Site Characteristics, Figures 2.5-1 Through 2.5-299 + (17:24:56, 19 July 2018)
- RS-13-009, Clinton, Unit 1, Updated Safety Analysis Report, Revision 15, Chapter 2 - Site Characteristics, Figures 2.1-1 Through 2.4-18 + (17:30:18, 19 July 2018)
- RS-13-009, Clinton, Unit 1, Updated Safety Analysis Report, Revision 15, Chapter 2 - Site Characteristics + (17:30:52, 19 July 2018)
- RS-13-009, Clinton, Unit 1, Updated Safety Analysis Report, Revision 15, Chapter 1- Introduction and General Description Plant + (17:31:12, 19 July 2018)
- RS-13-009, Clinton, Unit 1, Updated Safety Analysis Report, Revision 15, Effective Page Listing + (17:31:30, 19 July 2018)
- ML13010A288 + (18:43:41, 19 July 2018)
- ML13010A287 + (18:46:12, 19 July 2018)
- TAC:ME8243 + (18:59:03, 19 July 2018)
- TAC:ME9857 + (22:27:30, 19 July 2018)
- RS-12-221, Byron, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Technical Specifications Bases + (23:46:27, 19 July 2018)
- RS-12-221, Braidwood, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Technical Specifications Bases + (23:47:32, 19 July 2018)
- RS-12-221, Byron, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Technical Requirements Manual + (23:48:31, 19 July 2018)
- Robert Schreifels + (01:56:48, 20 July 2018)
- NMC + (02:01:02, 20 July 2018)
- Main Turbine Control Valve + (02:12:22, 20 July 2018)
- NG-16-0110, Duane Arnold - Annual Radiological Environmental Operating Report January 1 to December 31, 2015 + (09:51:08, 20 July 2018)
- NG-16-0110, Duane Arnold - 2015 Annual Radiological Environmental Operating Report + (09:51:13, 20 July 2018)
- NG-16-0042, Duane Arnold - Response to Request for Additional Information, License Amendment Request (TSCR-144) to Revise and Relocate Pressure and Temperature Limit Curves to a Pressure and Temperature Limits Report - MF6617 + (12:32:02, 20 July 2018)
- NL-13-016 + (15:02:22, 20 July 2018)
- NG-14-0267, Duane Arnold, Submittal of Core Operating Limits Report for DAEC Cycle 25 Operation + (23:36:36, 20 July 2018)
- LR-N12-0366, Kld TR-499, Revision 0, Development of Evacuation Time Estimates, Appendix K-76 Through K-149 + (13:22:33, 21 July 2018)
- RS-13-009, Clinton, Unit 1, Updated Safety Analysis Report, Revision 15, Chapter 9 - Auxiliary Systems + (14:52:59, 21 July 2018)
- RS-13-009, Clinton, Unit 1, Updated Safety Analysis Report, Revision 15, Chapter 2 - Site Characteristics, Figures 2.4-19 Through 2.4-53 + (14:55:18, 21 July 2018)
- RS-12-221, Braidwood, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Technical Requirements Manual + (15:45:13, 21 July 2018)
- RS-12-221, Braidwood, Units 1 and 2 and Byron, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Chapter 11.0 - Radioactive Waste Management + (15:45:28, 21 July 2018)
- RS-12-221, Braidwood, Units 1 and 2 and Byron, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Chapter 10.0 - Steam and Power Conversion System + (15:45:48, 21 July 2018)
- RS-12-221, Braidwood, Units 1 and 2 and Byron, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Chapter 9.0 - Auxiliary Systems + (15:47:23, 21 July 2018)
- RS-12-221, Braidwood, Units 1 and 2 and Byron, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Chapter 8.0 - Electric Power + (15:47:38, 21 July 2018)
- RS-12-221, Braidwood, Units 1 and 2 and Byron, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Chapter 7.0 - Instrumentation and Controls + (15:48:02, 21 July 2018)
- RS-12-221, Braidwood, Units 1 and 2 and Byron, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Chapter 6.0 - Engineered Safety Features + (15:48:32, 21 July 2018)
- RS-12-221, Braidwood, Units 1 and 2 and Byron, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Chapter 4.0 - Reactor + (15:51:03, 21 July 2018)
- RS-12-221, Byron, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Chapter 2.0 - Site Characteristics, Figure 2.5-1 Through Figure 2.5-258 + (15:54:20, 21 July 2018)
- RS-12-221, Byron, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Chapter 2.0 - Site Characteristics, Figure 2.1-1 Through Figure 2.4-30 + (15:54:48, 21 July 2018)
- RS-12-221, Byron, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Chapter 2.0 - Site Characteristics, Table of Contents Through Table 2.5-35 + (15:55:18, 21 July 2018)
- RS-12-221, Braidwood, Units 1 and 2 and Byron, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Appendix E - Requirements Resulting from the TMI-2 Accident + (15:56:04, 21 July 2018)
- RS-12-221, Braidwood, Units 1 and 2 and Byron, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Appendix D - Computer Programs + (15:56:23, 21 July 2018)
- RS-12-221, Braidwood, Units 1 and 2 and Byron, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Appendix B - Construction Material Standards and Quality Control Procedures + (15:57:43, 21 July 2018)
- RS-12-221, Braidwood, Units 1 and 2 and Byron, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Appendix a - Application of NRC Regulatory Guides + (15:58:00, 21 July 2018)
- RS-12-221, Braidwood, Units 1 and 2 and Byron, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Chapter 17.0 - Quality Assurance + (15:58:43, 21 July 2018)
- RS-12-221, Braidwood, Units 1 and 2 and Byron, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Chapter 16.0 - Technical Specifications + (15:58:49, 21 July 2018)