Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20040G761 + (01:52:00, 20 December 2024)
- ML20040G759 + (01:52:06, 20 December 2024)
- ML20040G758 + (01:52:06, 20 December 2024)
- ML20040G756 + (01:52:12, 20 December 2024)
- ML20040G755 + (01:52:18, 20 December 2024)
- ML20040G754 + (01:52:19, 20 December 2024)
- ML20040G752 + (01:52:24, 20 December 2024)
- ML20040G751 + (01:52:25, 20 December 2024)
- ML20040G749 + (01:52:31, 20 December 2024)
- ML20040G750 + (01:52:31, 20 December 2024)
- 05000366/LER-1982-004-03, /03L-0:on 820112,low Alarm Received on Control Rod Driveline Hydraulic Control Unit 26-47.Caused by Leakage in III Instrument Block Valve of Accumulator. Accumulator Recharged + (01:52:33, 20 December 2024)
- 05000281/LER-1982-003-03, /03L-0:on 820108,PT-27 Revealed Ampere Readings for Heat Tracing Panel 10 Circuits 1B,2A & 5B & Panel 11 Circuit 2A,4C & 5B Found Below Acceptance Criteria.Caused by Excessive Heat.Defective Heat Tracing Replaced & Tested + (01:52:40, 20 December 2024)
- ML20040G746 + (01:52:47, 20 December 2024)
- 05000281/LER-1981-083-03, /03L-0:on 811231,steam Flow Instruments FI-474 on a Main Stream Line & FI-485 on B Main Stream Line Found Isolated.Caused by Instruments Inadvertently Left Isolated Until Discovery During Startup + (01:52:48, 20 December 2024)
- ML20040G743 + (01:52:54, 20 December 2024)
- 05000366/LER-1982-004, Forwards LER 82-004/03L-0 + (01:52:56, 20 December 2024)
- 05000281/LER-1981-081-03, /03L-0:on 811229,containment Isolation Valve, 2-VA-1,found Unlocked,Open & Unattended.Caused by Supervisor Failing to Recognize That Valve Had Been Opened to Allow Venting of C Loop.Valve Closed & Locked + (01:52:57, 20 December 2024)
- ML20040G739 + (01:53:04, 20 December 2024)
- 05000263/LER-1982-002-03, /03L-0:on 820107,core Spray Pump 11 Start Time Delay Relay Failed to Operate.Caused by Loose Terminal Connection & Microswitch Contact Burned Open.New GE CR 2820 Relay Installed + (01:53:05, 20 December 2024)
- ML20040G736 + (01:53:11, 20 December 2024)
- ML20040G734 + (01:53:12, 20 December 2024)
- ML20040G733 + (01:53:18, 20 December 2024)
- 05000328/LER-1982-010-03, /03L-0:on 820109,loop 3 Steam Generator Pressure Transmitter 2-PT-1-20A Declared Inoperable.Caused by Frozen Sense Line.Lines Thawed.Similar Incidents Occurred on 820110 & 11 + (01:53:19, 20 December 2024)
- 05000263/LER-1982-002, Forwards LER 82-002/03L-0 + (01:53:21, 20 December 2024)
- ML20040G729 + (01:53:30, 20 December 2024)
- 05000328/LER-1982-010, Forwards LER 82-010/03L-0 + (01:53:32, 20 December 2024)
- ML20040G725 + (01:53:39, 20 December 2024)
- 1CAN028202, Responds to NRC Re Purge Valves.Purge Valve Position Light Is Checked Once During Each 8-h Shift.Locking Screw Installed During Last Refueling Outage to Reduce Problem of Adjusting Screw Backing Out of Proper Position + (01:53:40, 20 December 2024)
- 05000328/LER-1982-001-03, /03L-0:on 820103,ice Condenser Intermediate Deck Door 9.B Discovered Frozen Shut.Caused by Humidity Entering Through Top Deck Blanket Vents,Condensed on I-beams & Dripping Onto Intermediate Deck Door.Ice Removed + (01:53:42, 20 December 2024)
- 05000155/LER-1982-001-03, /03L-0:on 820111,during Quarterly Test of Reactor Depressurization Sys,Isolation Valve CV4180 Failed to Open, Making One Loop Inoperable.Caused by Valve Stem Seizure. Packing Lubricated & Valve Successfully Tested + (01:53:44, 20 December 2024)
- 05000328/LER-1982-001, Forwards LER 82-001/03L-0 + (01:53:46, 20 December 2024)
- 05000155/LER-1982-001, Forwards LER 82-001/03L-0 + (01:53:48, 20 December 2024)
- ML20040G715 + (01:53:50, 20 December 2024)
- 05000270/LER-1982-001-01, /01T-0:on 820117,reactor Bldg Equipment Hatch Found Leaking Air Through Gap in Seal.Caused by Personnel Not Verifying Good metal-to-gasket Seal Had Been Made. Procedures Revised to Require Verification of Proper Seal + (01:53:52, 20 December 2024)
- ML20040G712 + (01:53:53, 20 December 2024)
- ML20040G710 + (01:53:55, 20 December 2024)
- 05000249/LER-1982-002-03, /03L-0:on 820107,while Local Leak Rate Testing During Refueling Outage,Determined That Outboard MSIVs 3-203-2B & 3-203-2D Were Leaking in Excess of Tech Spec. Caused by Valve Packing Leakage.Packing Tightened + (01:53:56, 20 December 2024)
- 05000270/LER-1982-001, Forwards LER 82-001/01T-0.Detailed Event Analysis Encl + (01:53:59, 20 December 2024)
- ML20040G704 + (01:54:00, 20 December 2024)
- 05000249/LER-1982-002, Forwards LER 82-002/03L-0 + (01:54:01, 20 December 2024)
- IR 05000322/1982001 + (01:54:09, 20 December 2024)
- ML20040G700 + (01:54:10, 20 December 2024)
- ML20040G698 + (01:54:16, 20 December 2024)
- ML20040G696 + (01:54:22, 20 December 2024)
- ML20040G695 + (01:54:22, 20 December 2024)
- ML20040G694 + (01:54:28, 20 December 2024)
- ML20040G693 + (01:54:34, 20 December 2024)
- 05000321/LER-1982-006-01, /01T-0:on 820119,w/facility in Cold Shutdown,Three Pinhole Leaks Found Next to Weld in Flow Element Sensing Line from Recirculation Sys Loop A.Cause Unknown.Failed Section of Sensing Line Replaced.Investigation Underway + (01:54:39, 20 December 2024)
- ML20040G690 + (01:54:45, 20 December 2024)
- ML20040G689 + (01:54:46, 20 December 2024)
- 05000237/LER-1981-078-01, /01X-1:on 811223,during Automatic Depressurization Sys Valve Surveillance,Electromatic Relief Valve 2B Failed to Open.Caused by Wire Wedge in Contact That Bypass Hold Coil.Wires Moved + (01:54:48, 20 December 2024)