Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML25195A056 + (00:56:23, 18 September 2025)
- ML25192A231 + (01:48:38, 18 September 2025)
- ML25192A081 + (04:29:30, 18 September 2025)
- ML25191A187 + (06:14:23, 18 September 2025)
- JAFP-19-0050, Summary of Plant and Independent Spent Fuel Storage Installation Changes, Tests, and Experiments as Required by 10 CFR 50.59 and 10 CFR 72.48, and Summary of Commitment Changes, for 2017 and 2018 + (06:55:49, 18 September 2025)
- EPID:L-2019-LRM-0093 + (06:59:26, 18 September 2025)
- ML19364A182 + (06:59:32, 18 September 2025)
- DD-19-02, Letter from Commission Secretary Annette Vietti-Cook to David Lochbaum Regarding Directors Decision DD-19-02 + (06:59:36, 18 September 2025)
- PMNS20191374, Forthcoming Public Meeting Between the U.S. Nuclear Regulatory Commission and the PWR Owners Group (PWROG) Regarding Topical Report PWROG-18029-NP, Component Reliability Data Issues for Discussion with NRC Research + (06:59:39, 18 September 2025)
- SECY-19-0112, E-Mail Response Regarding Final Update for Digital I & C in SECY-19-0112 + (06:59:42, 18 September 2025)
- EPID:L-2018-RNW-0023 + (06:59:47, 18 September 2025)
- NRC-2019-0228, Notices of Appearance for Timothy P. Matthews, John M. Matthews, Martin J. Oneill + (06:59:49, 18 September 2025)
- EPID:L-2019-TOP-0024 + (06:59:54, 18 September 2025)
- ML19354A928 + (07:00:10, 18 September 2025)
- IR 05000395/2019010 + (07:00:21, 18 September 2025)
- IR 05000266/2019412 + (07:00:22, 18 September 2025)
- TAC:MF2549 + (07:00:48, 18 September 2025)
- ML19353C059 + (07:00:50, 18 September 2025)
- IR 05000456/2019011 + (07:00:53, 18 September 2025)
- IR 05000244/2019010 + (07:00:53, 18 September 2025)
- 05000306/LER-2019-001, Cancellation: LER 2019-001-00 for Prairie Island Nuclear Generating Plant, Unit 2, Reactor Coolant Isolation Valve Leakage Results in Condition Prohibited by Technical Specifications + (07:01:03, 18 September 2025)
- ML19352G704 + (07:01:21, 18 September 2025)
- PMNS20191362, Public Meeting with Industry and Members of the Public to Discuss Inspection Procedure 71111.21N.02, Design-Basis Capability of Power-Operated Valves (POV) Under 10 CFR 50.55a Requirements + (07:01:27, 18 September 2025)
- ML19352F615 + (07:01:32, 18 September 2025)
- ML19352F604 + (07:01:33, 18 September 2025)
- EPID:L-2018-LLA-0077 + (07:01:34, 18 September 2025)
- ML19352F122 + (07:01:35, 18 September 2025)
- ML19352F120 + (07:01:36, 18 September 2025)
- ML19352F114 + (07:01:36, 18 September 2025)
- ML19352D704 + (07:01:41, 18 September 2025)
- A01517, Forwards Full Payment of Class II Amend Fee.Nrc 810223 Memo Advising of Applicability of Class II Fee Encl + (07:01:52, 18 September 2025)
- 05000334/LER-1980-094-99, /99X-0:on 801117,personnel Operated Wrong Channel, BS-MS-484,during Bistable Trip of Steam Line Low Bistable BS-MS-485.Caused by Personnel Error.Station Operating Supervisor Failed to Look at Status Panel + (07:02:09, 18 September 2025)
- 05000267/LER-1980-049-03, /03X-1:on 800904,PCRV Rupture Disc M-11702 Setpoint Found Exceeding Tech Spec.Caused by Belleville Washer Operating Point Drift.Addl Tests Showed Setpoint in Tolerance + (07:02:32, 18 September 2025)
- 05000346/LER-1980-090-03, /03L-1:on 801205,setpoints for Borated Water Storage Tank Low Level Bistable BA312 & Containment Pressure Bistable BA309 Found Out of Tolerance.Caused by Component Failure.Bistables Recalibr + (07:02:42, 18 September 2025)
- 05000267/LER-1980-049, Forwards LER 80-049/03X-1 + (07:03:03, 18 September 2025)
- 05000346/LER-1980-090, Forwards LER 80-090/03L-1 W/Supplemental Info Sheets + (07:03:14, 18 September 2025)
- 05000334/LER-1980-094, Forwards LER 80-094/99X-0 + (07:03:22, 18 September 2025)
- 05000302/LER-1981-004-03, /03L-0:on 810119,position Indication for Containment Isolation Valves CAV-2 & CAV-126 Found Inoperable,In Violation of Tech Spec 3.6.3.1.Cause of CAV-2 Inoperability Unknown.Cause of CAV-126 Was Bad Breaker + (07:03:49, 18 September 2025)
- 05000302/LER-1981-004, Forwards LER 81-004/03L-0 + (07:03:59, 18 September 2025)
- 05000313/LER-1980-039-03, During Monthly Surveillance on Lead H Purge Sys,Exhaust Fan VEF-37A Tripped.Caused by Short in Control Sys Which Caused Rectifier to Fail & Fuse to Blow + (07:04:14, 18 September 2025)
- 05000313/LER-1980-039, Forwards Revised LER 80-039/03L-1 + (07:04:16, 18 September 2025)
- 05000324/LER-1980-113-03, /03L-0:on 801211,primary Containment Atmospheric Control Inerting Inlet Isolation Valve 2-CAC-V48 Had Dual Open/Close Position Indication.Cause Unknown.Suppl Rept to Be Issued Following Investigation + (07:04:17, 18 September 2025)
- 05000324/LER-1980-113, Forwards LER 80-113/03L-0 + (07:04:19, 18 September 2025)
- 05000368/LER-1980-081, Updated LER 80-081/03L-1:on 801030 & 1212,during Repair Work,Fire Barrier Not Maintained.Caused by Inadequate Instructions.Contractor Instructed to Maintain Firewatch When Penetrations Are Open & to Seal Penetrations Quickly + (07:04:23, 18 September 2025)
- 05000368/LER-1980-056-03, A Core Protection Calculator Received Three Auto Restarts & on 801218, Calculator C Failed Causing Dnbr/Lpd Trip.Probably Caused by Malfunction of Normal Room Cooler Increasing Air Temp + (07:04:27, 18 September 2025)
- 05000334/LER-1980-108-03, /03L-0:during Maint Surveillance Procedure for Calibr of Hydrogen Analyzer H2-HY-100B,failed Function Circuit Card Found.Caused by Electronic Circuit Card Failure.Function Card Replaced + (07:04:31, 18 September 2025)
- 05000346/LER-1980-091-01, /01T-0:on 801223,during Analysis Per IE Bulletin 80-11,design for Block Wall Between Control Room & Stairway AB-1 Found to Be Less Conservative than Assumed in Fsar. Caused by Outdated Analytical Const Methods + (07:04:35, 18 September 2025)
- 05000346/LER-1980-091, Forwards LER 80-091/01T-0 + (07:04:40, 18 September 2025)
- 05000368/LER-1980-060, Updated LER 80-060/03X-2:800730 & 1202,D Core Protection Calculator Failed.C Core Protection Calculator Failed on 801120.Watchdog Timer Timed Out Preventing Console Communications.Core Protection Calculator Sys Reinitialized + (07:04:47, 18 September 2025)
- 05000266/LER-1980-015-01, /01T-0:on 801210,during Refueling Outage Surveillance Testing of safety-related Shock Suppressors, Snubber 1-HS-14 Found to Be Inoperable.Caused by Low Level in Reservoir,Resulting from Piston Rod O-ring Seal Leakage + (07:04:49, 18 September 2025)
- 05000266/LER-1980-015, Forwards LER 80-015/01T-0 + (07:04:52, 18 September 2025)