Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- NRC Generic Letter 82-32, Draft Steam Generator Report (SAI) + (23:34:19, 18 February 2020)
- NRC Generic Letter 82-30, Filings Related to 10 CFR 50 Production and Utilization Facilities + (23:34:28, 18 February 2020)
- NRC Generic Letter 82-26, NUREG-0744, REV. 1 - Pressure Vessel Material Fracture Toughness + (23:37:06, 18 February 2020)
- NRC Generic Letter 82-25, Integrated IAEA Exercise for Physical Inventory at LWRS + (23:37:13, 18 February 2020)
- NRC Generic Letter 82-24, Safety Relief Valve Quencher Loads: BWR MARK II and III Containments + (23:37:21, 18 February 2020)
- NRC Generic Letter 82-23, Inconsistency Between Requirements of 10CFR 73.40(D) and Standard Tech Specs For Performing Audits of Sadeguards Contin + (23:37:29, 18 February 2020)
- NRC Generic Letter 82-22, Congressional Request for Information Concerning Steam Generator Tube Integrity + (23:37:36, 18 February 2020)
- NRC Generic Letter 82-21, Fire Protection Audits + (23:37:45, 18 February 2020)
- NRC Generic Letter 82-20, Guidance for Implementing the Standard Review Plan Rule + (23:37:52, 18 February 2020)
- NRC Generic Letter 82-19, Submittal of Copies of Documentation to NRC-Copy Requirements for Emergency Plans and Physical Security Plans + (23:38:35, 18 February 2020)
- NRC Generic Letter 82-18, Reactor Operator and Senior Reactor Operator Requalification Examinations + (23:38:44, 18 February 2020)
- NRC Generic Letter 82-17, Inconsistency of Requirements Between 50.54(t) and 50.15 + (23:38:55, 18 February 2020)
- NRC Generic Letter 82-16, NUREG-0737 Technical Specifications + (23:39:41, 18 February 2020)
- NRC Generic Letter 82-14, Submittal of Documents to the NRC + (23:39:48, 18 February 2020)
- NRC Generic Letter 82-13, Reactor Operator and Senior Reactor Operator Examinations + (23:39:56, 18 February 2020)
- NRC Generic Letter 82-12, Nuclear Power Plant Staff Working Hours + (23:40:13, 18 February 2020)
- NRC Generic Letter 82-11, Transmittal of NUREG-0916 Relative to the Restart of R.E. Ginna Nuclear Power Plant + (23:40:22, 18 February 2020)
- NRC Generic Letter 82-10, Post-TMI Requirements + (23:40:42, 18 February 2020)
- NRC Generic Letter 82-09, Environmental Qualification of Safety Related Electrical Equipment + (23:41:49, 18 February 2020)
- NRC Generic Letter 82-08, Transmittal of NUREG-0909 Relative to the Ginna Tube Rupture + (23:42:08, 18 February 2020)
- NRC Generic Letter 82-05, Post-TMI Requirements + (23:44:07, 18 February 2020)
- NRC Generic Letter 82-04, Use of INPO See-in Program + (23:44:16, 18 February 2020)
- NRC Generic Letter 82-03, High Burnup MAPLHGR Limits + (23:44:51, 18 February 2020)
- NRC Generic Letter 82-02, Nuclear Power Plant Staff Working Hours + (23:45:39, 18 February 2020)
- NRC Generic Letter 82-01, New Applications Survey + (23:46:01, 18 February 2020)
- NRC Generic Letter 83-44, Availability of NUREG-1021, "Operator Licensing Examiner Standards" + (23:46:45, 18 February 2020)
- NRC Generic Letter 83-43, Reporting Requirements of 10 CFR 50, Sections 50.72 and 50.73, and Standard Technical Specifications + (23:46:53, 18 February 2020)
- NRC Generic Letter 83-42, Clarification to GL 81-07 Regarding Response to NUREG-0612, "Control of Heavy Loads at Nuclear Power Plants" + (23:47:01, 18 February 2020)
- NRC Generic Letter 83-41, Fast Cold Starts of Diesel Generators + (23:47:09, 18 February 2020)
- NRC Generic Letter 83-39, Voluntary Survey of Licensed Operators + (23:48:32, 18 February 2020)
- NRC Generic Letter 83-38, NUREG-0965, "NRC Inventory of Dams" + (23:48:40, 18 February 2020)
- NRC Generic Letter 83-37, NUREG-0737 Technical Specifications + (23:48:48, 18 February 2020)
- NRC Generic Letter 83-36, NUREG-0737 Technical Specifications + (23:48:57, 18 February 2020)
- NRC Generic Letter 83-35, Clarification of TMI Action Plan Item II.K.3.31 + (23:49:41, 18 February 2020)
- NRC Generic Letter 83-34, Important to Safety + (23:49:49, 18 February 2020)
- NRC Generic Letter 78-08, Enclosing NUREG-0408 RE Mark I Containments, and Granting Exemption from GDC 50 and Enclosing Sample Notice + (23:55:43, 18 February 2020)
- NRC Generic Letter 79-48, Confirmatory Requirements Relating to Condensation Oscillation Loads for the Mark I Containment Long Term Program + (23:56:03, 18 February 2020)
- NRC Generic Letter 79-13, Schedule for Implementation and Resolution of Mark I Containment Long Term Program + (23:56:34, 18 February 2020)
- NRC Generic Letter 80-96, Fire Protection + (23:58:03, 18 February 2020)
- NRC Generic Letter 80-93, Emergency Preparedness + (23:58:08, 18 February 2020)
- NRC Generic Letter 80-78, Mark I Containment Long-Term Program + (23:58:22, 18 February 2020)
- NRC Generic Letter 80-75, Lessons Learned Tech Specs + (23:59:03, 18 February 2020)
- NRC Generic Letter 80-72, Interim Criteria for Shift Staffing + (23:59:10, 18 February 2020)
- NRC Generic Letter 80-68, IEB 80-17 Supplement 2 Failures Revealed by Testing Subsequent to Failure of Control Rods to Insert During a Scram at a BWR + (23:59:52, 18 February 2020)
- NRC Generic Letter 80-65, Request for Estimated Construction Completion and Fuel Load Schedules + (23:59:58, 18 February 2020)
- NRC Generic Letter 80-34, Clarification of NRC Requirements For Emergency Response Facilities at Each Site + (00:00:57, 19 February 2020)
- NRC Generic Letter 80-22, Transmittal of NUREG-0654 "Criteria For Preparation and Evaluation of Radiological Emergency Response Plans and Prepared + (00:01:09, 19 February 2020)
- NRC Generic Letter 81-18, BWR Scram Discharge System-Clarification of Diverse Instrumentation Requirements + (00:02:23, 19 February 2020)
- NRC Generic Letter 81-05, Information Regarding the Program for Environmental Qualification Of Safety-Related Electrical Equipment + (00:02:35, 19 February 2020)
- NRC Generic Letter 82-28, Inadequate Core Cooling Instrumentation System + (00:02:45, 19 February 2020)
- NRC Generic Letter 82-27, Transmittal of NUREG-0763 - Guidelines For Confirmatory In-Plant Tests of Safety-Relief Valve Discharge for BWR Plants + (00:03:27, 19 February 2020)