Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- NRC Generic Letter 80-12, IEB 80-04 Analysis of a PWR Main Steam Sine Break with Continued Feedwater Addition + (23:14:29, 18 February 2020)
- NRC Generic Letter 80-11, IEB 80-03 Loss of Charcoal From Standard Type II, 2 Inch, Tray Absorber Cells + (23:14:36, 18 February 2020)
- NRC Generic Letter 80-10, Issuance of NUREG-0588, "Interim Staff Position on Equipment Qualifications of Safety-Related Electrical Equipment" + (23:14:46, 18 February 2020)
- NRC Generic Letter 80-09, Low Level Radioactive Waste Disposal + (23:15:31, 18 February 2020)
- NRC Generic Letter 80-08, IEB 80-02 Inadequate Quality Assurance for Nuclear Supplied Equipment + (23:15:38, 18 February 2020)
- NRC Generic Letter 80-07, Information Regarding the Program For Environmental Qualification of Safety-Related Electrical Equipment + (23:16:21, 18 February 2020)
- NRC Generic Letter 80-06, Issuance of NUREG-0313, Rev 1, "Technical Report on Material Selection and Processing Guidelines for BWR Coolant Pressure" + (23:16:28, 18 February 2020)
- NRC Generic Letter 80-05, IEB 79-01b Environmental Qualification of Class 1E Equipment + (23:17:12, 18 February 2020)
- NRC Generic Letter 80-04, IEB 80-01 Operability of ADS Valve Pneumatic Supply + (23:17:19, 18 February 2020)
- NRC Generic Letter 80-03, BWR Control Rod Failures + (23:18:03, 18 February 2020)
- NRC Generic Letter 80-02, Quality Assurance Requirements Regarding Diesel Generator Fuel Oil + (23:18:11, 18 February 2020)
- NRC Generic Letter 80-01, NUREG-0630 "Cladding, Swelling and Rupture - Models for LOCA Analysis" + (23:18:19, 18 February 2020)
- NRC Generic Letter 81-40, Qualifications of Reactor Operators + (23:18:27, 18 February 2020)
- NRC Generic Letter 81-39, NRC Volume Reduction Policy + (23:18:34, 18 February 2020)
- NRC Generic Letter 81-37, ODYN Code Reanalysis Requirements + (23:19:24, 18 February 2020)
- NRC Generic Letter 81-36, Revised Schedule for Completion of TMI Action Plan Item II.D.1, Relief and Safety Valve Testing + (23:19:34, 18 February 2020)
- NRC Generic Letter 81-35, Safety Concerns Associated with Pipe Breaks in the BWR Scram System + (23:19:42, 18 February 2020)
- NRC Generic Letter 81-34, Safety Concerns Associated with Pipe Breaks in the BWR Scram System + (23:19:50, 18 February 2020)
- NRC Generic Letter 81-32, NUREG-0737, Item II.K.3.44-Evaluation of Anticipated Transients Combined with Single Failure + (23:19:58, 18 February 2020)
- NRC Generic Letter 81-30, Safety Concerns Associated with Pipe Breaks in the BWR Scram System + (23:20:41, 18 February 2020)
- NRC Generic Letter 81-29, Simulator Examinations + (23:21:25, 18 February 2020)
- NRC Generic Letter 81-28, Steam Generator Overfill + (23:22:08, 18 February 2020)
- NRC Generic Letter 81-27, Privacy and Proprietary Material in Emergency Plans + (23:22:16, 18 February 2020)
- NRC Generic Letter 81-26, Licensing Requirements for Pending Construction Permit and Manufacturing License Applications + (23:22:24, 18 February 2020)
- NRC Generic Letter 81-25, Change in Implementing Schedule for Submission and Evaluation of Upgraded Emergency Plans + (23:22:31, 18 February 2020)
- NRC Generic Letter 81-24, Multi-Plant Issue B-56 Control Rods Fail to Fully Insert + (23:22:40, 18 February 2020)
- NRC Generic Letter 81-23, INPO Plant Specific Evaluation Reports + (23:22:46, 18 February 2020)
- NRC Generic Letter 81-22, Engineering Evaluation of the H.B. Robinson Reactor Coolant System Leak on 1/29/81 + (23:23:44, 18 February 2020)
- NRC Generic Letter 81-21, Natural Circulation Cooldown + (23:23:52, 18 February 2020)
- NRC Generic Letter 81-20, Safety Concerns Associated with Pipe Breaks in the BWR Scram System + (23:24:00, 18 February 2020)
- NRC Generic Letter 81-19, Thermal Shock to Reactor Pressure Vessels + (23:24:06, 18 February 2020)
- NRC Generic Letter 81-17, Functional Criteria for Emergency Response Facilities + (23:26:03, 18 February 2020)
- NRC Generic Letter 81-16, NUREG-0737 Item I.C.1 SER on Abnormal Transient Operating Guidelines (ATOG) + (23:26:46, 18 February 2020)
- NRC Generic Letter 81-15, Environmental Qualification of Class 1E Electrical Equipment-Clarification of Staffs Handling of Proprietary Information + (23:27:30, 18 February 2020)
- NRC Generic Letter 81-14, Seismic Qualifications for Auxiliary Feedwater Systems + (23:27:39, 18 February 2020)
- NRC Generic Letter 81-13, SER for GEXL Correlation for 8X8R Fuel Reload Applications for Appendix D Submittals of the GE Topical Report + (23:27:49, 18 February 2020)
- NRC Generic Letter 81-12, Fire Protection Rule (45 FR 76602, 11/19/80) + (23:28:00, 18 February 2020)
- NRC Generic Letter 81-11, BWR Feedwater Nozzle and Control Rod Drive Return Line Nozzle Cracking (NUREG-0619) + (23:28:09, 18 February 2020)
- NRC Generic Letter 81-10, Post-TMI Requirements for the Emergency Operations Facility + (23:28:19, 18 February 2020)
- NRC Generic Letter 81-09, BWR Scram Discharge System + (23:29:03, 18 February 2020)
- NRC Generic Letter 81-08, Odyn Code + (23:29:50, 18 February 2020)
- NRC Generic Letter 81-07, Control of Heavy Loads + (23:29:57, 18 February 2020)
- NRC Generic Letter 81-06, Periodic Updating of Final Safety Analysis Reports (FSARS) + (23:30:07, 18 February 2020)
- ML19324F871 + (23:30:13, 18 February 2020)
- NRC Generic Letter 81-04, Emergency Procedures And Training for Station Blackout Events + (23:31:28, 18 February 2020)
- NRC Generic Letter 81-03, Implementation of NUREG-0313,Technical Report on Material Selection & Processing GL for BWR Coolant Press Boundary Piping + (23:31:36, 18 February 2020)
- NRC Generic Letter 81-02, Analysis, Conclusions and Recommendations Concerning Operator Licensing + (23:32:21, 18 February 2020)
- NRC Generic Letter 81-01, Qualification of Inspection, Examination, Testing and Audit Personnel + (23:32:29, 18 February 2020)
- NRC Generic Letter 82-39, Problems with Submittals of Subsequent Information of CURT 73.21 For Licensing Reviews + (23:33:16, 18 February 2020)
- NRC Generic Letter 82-38, Meeting to Discuss Developments for Operator Licensing Examinations + (23:34:02, 18 February 2020)
- NRC Generic Letter 82-33, Supplement 1 to NUREG-0737 - Emergency Response Capability + (23:34:09, 18 February 2020)