Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20009D433 + (16:39:58, 17 February 2020)
- EPID:L-2019-TOP-0051 + (18:00:45, 17 February 2020)
- ML20008D601 + (18:00:52, 17 February 2020)
- Neely Research Reactor + (22:17:57, 17 February 2020)
- EPID:L-2019-LLE-0030 + (05:29:41, 18 February 2020)
- ML19364A018 + (05:31:02, 18 February 2020)
- ML19354B662 + (06:08:16, 18 February 2020)
- ML19353C995 + (06:11:14, 18 February 2020)
- ML19353C177 + (06:12:57, 18 February 2020)
- EPID:L-2019-PMP-0193 + (06:29:48, 18 February 2020)
- ML19350A023 + (08:26:18, 18 February 2020)
- ML19347B214 + (09:20:53, 18 February 2020)
- NRC Generic Letter 77-07, Reliability Of Standby Diesel Generator Units + (13:30:11, 18 February 2020)
- NRC Generic Letter 77-03, Transmittal of NUREG-0321, "A Study of the Nuclear Regulatory Commission Quality Assurance Program" + (13:51:13, 18 February 2020)
- NRC Generic Letter 78-42, Duplicate of GL-78-40 + (16:06:09, 18 February 2020)
- EPID:L-2019-LRM-0064 + (17:54:37, 18 February 2020)
- NRC Generic Letter 77-05, Nonconformity of Addresses of Items Directed to the Office of Nuclear Reactor Regulation + (21:46:39, 18 February 2020)
- NRC Generic Letter 78-36, Cessation of Plutonium Shipments by Air Except in NRC Approved Containers + (21:47:22, 18 February 2020)
- NRC Generic Letter 78-32, Reactor Protection System Power Supplies + (21:48:05, 18 February 2020)
- NRC Generic Letter 78-31, Notice of Steam Generator Conference Agenda + (21:48:09, 18 February 2020)
- NRC Generic Letter 77-06, Enclosing Questionaire Relating to Steam Generators + (21:52:54, 18 February 2020)
- NRC Generic Letter 77-04, Shipments of Contaminated Components From NRC Licensed Nuclear Power Facilities to Vendors & Service Companies + (21:52:58, 18 February 2020)
- NRC Generic Letter 77-02, Fire Protection Functional Responsibilities + (21:53:03, 18 February 2020)
- NRC Generic Letter 77-01, Intrusion Detection Systems Handbook + (21:53:07, 18 February 2020)
- NRC Generic Letter 78-41, Mark II Generic Acceptance Criteria for Lead Plants + (21:53:12, 18 February 2020)
- NRC Generic Letter 78-40, Training & Qualification Program Workshops + (21:53:16, 18 February 2020)
- NRC Generic Letter 78-39, Forwarding of 2 Tables of Appendix I, Draft Radiological Effluent Technical Specifications, BWR, and NUREG-0133 + (21:53:20, 18 February 2020)
- NRC Generic Letter 78-38, Forwarding of 2 Tables Of Appendix I, Draft Radiological Effluent Technical Specifications, PWR, and NUREG-0133 + (21:53:23, 18 February 2020)
- NRC Generic Letter 78-34, Reactor Vessel Atypical Weld Material + (21:54:44, 18 February 2020)
- NRC Generic Letter 78-30, Forwarding of NUREG-0219 + (21:54:49, 18 February 2020)
- NRC Generic Letter 78-29, Notice of PWR steam generator conference + (21:54:52, 18 February 2020)
- NRC Generic Letter 78-28, Forwarding pages omitted from 07/11/78 letter + (22:02:23, 18 February 2020)
- NRC Generic Letter 78-27, Forwarding of NUREG-0181 + (22:02:29, 18 February 2020)
- NRC Generic Letter 78-26, Excessive Control Rod Guide Tube Wear + (22:03:12, 18 February 2020)
- NRC Generic Letter 78-24, Model Appendix I Technical Specifications and Submittal Schedule for BWRs + (22:03:55, 18 February 2020)
- NRC Generic Letter 78-23, Manpower Requirements For Operating Reactors + (22:04:03, 18 February 2020)
- NRC Generic Letter 78-22, Revision to Intrusion Detection Systems and Entry Control Handbooks and Nuclear Safeguards Technology Handbook + (22:04:47, 18 February 2020)
- NRC Generic Letter 78-37, Revised Meeting Schedule & Locations for Upgraded Guard Qualifications + (22:06:05, 18 February 2020)
- NRC Generic Letter 78-35, Regional Meetings to Discuss Upgraded Guard Qualifications + (22:06:19, 18 February 2020)
- NRC Generic Letter 78-21, Transmitting NUREG/CR-0181 Concerning Barrier & Penetration Data Needed for Physical Security System Assessment + (22:06:34, 18 February 2020)
- NRC Generic Letter 78-20, Enclosing – "A Systematic Approach to the Conceptual Design of Physical Protection Systems for Nuclear Facilities" + (22:06:41, 18 February 2020)
- NRC Generic Letter 78-19, Enclosing Sandia Report SAND 77-0777, "Barrier Technology Handbook" + (22:07:24, 18 February 2020)
- NRC Generic Letter 78-18, Corrected Letter On Heavy Loads Over Spent Fuel + (22:07:33, 18 February 2020)
- NRC Generic Letter 78-17, Corrected Letter On Heavy Loads Over Spent Fuel + (22:10:22, 18 February 2020)
- NRC Generic Letter 78-16, Request for Information on Control of Heavy Loads Near Spent Fuel Pools + (22:10:44, 18 February 2020)
- NRC Generic Letter 78-15, Task Action Plan for Category A Technical Activity No. A-36, "Control of Heavy Loads Near Spent Fuel" + (22:11:01, 18 February 2020)
- NRC Generic Letter 78-14, Transmittal Of Draft NUREG-0219 For Comment + (22:11:34, 18 February 2020)
- NRC Generic Letter 78-13, Forwarding of NUREG-0219 + (22:12:02, 18 February 2020)
- NRC Generic Letter 78-12, Notice of Meeting Regarding "Implementation of 10 CFR 73.55 Requirements And Status of Research..." + (22:12:26, 18 February 2020)
- NRC Generic Letter 78-11, Guidance on Spent Fuel Pool Modifications + (22:13:01, 18 February 2020)
- NRC Generic Letter 78-10, Guidance On Radiological Environmental Monitoring + (22:13:58, 18 February 2020)