Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20063K697 + (02:39:39, 17 December 2024)
- ML20063K693 + (02:39:39, 17 December 2024)
- ML20063K683 + (02:39:40, 17 December 2024)
- 05000298/LER-1994-001, :on 940119,HPCI Pump Min Flow Bypass Valve Unexpectedly Opened During Surviellance Testing While Pump Discharge Valve Being Opened Due to Actuation of Pump Discharge Pressure Switch.Valve Closed + (02:39:42, 17 December 2024)
- BSEP-94-0076, Responds to NRC Re Violations Noted in Insp Repts 50-324/93-58 & 50-325/93-58.C/A:addl Engineering & Nad Oversight for Vendors Tool Qualification Testing Is Being Provided + (02:39:46, 17 December 2024)
- ML20063K666 + (02:39:47, 17 December 2024)
- ML20063K662 + (02:39:49, 17 December 2024)
- 05000352/LER-1994-001-02, :on 940114,manual Reactor Scram Initiated Due to Unexpected Failure of Indicating Light Bulb During Reinstallation Into Subj Light Bulb Socket.Administrative Procedure A-41.1 Will Be Revised by 940531 + (02:39:50, 17 December 2024)
- 05000456/LER-1993-006-01, :on 931209,MDAFWPs Declared Inoperable & LCO Action Requirement 3.7.1.2.a Entered Due to Potential Unavailability of MDAFWPs During Stated Scenario.Temporary Alterations 93-1-018 & 93-2-025 Installed + (02:39:55, 17 December 2024)
- ML20063K654 + (02:39:56, 17 December 2024)
- 05000423/LER-1994-002-01, :on 940123,notice That STA Absent Due to Personnel Error.Oncoming Shift Supervisor Reviewed Shift Schedule to Identify STA & Called STA to Report to Work.Sta Position Added to Shift Turnover Rept + (02:39:59, 17 December 2024)
- ML20063K650 + (02:40:00, 17 December 2024)
- ML20063K646 + (02:40:01, 17 December 2024)
- ML20063K641 + (02:40:02, 17 December 2024)
- ML20063K637 + (02:40:02, 17 December 2024)
- ML20063K635 + (02:40:06, 17 December 2024)
- ML20063K622 + (02:40:07, 17 December 2024)
- PM-82-808, Forwards Radioactive Effluent Release Semiannual Rept, Jan-June 1982, Per ETS Section 5.7.1.b + (02:40:07, 17 December 2024)
- ML20063K619 + (02:40:08, 17 December 2024)
- ML20063K616 + (02:40:09, 17 December 2024)
- ML20063K605 + (02:40:10, 17 December 2024)
- 05000361/LER-1982-081-03, /03L-0:on 820731,during Mode 2 Operation,Channel C DNBR Margin Monitor 2J1-0004-3 Failed Channel Check Test. Caused by Cold Leg Temp Transmitter 2TT-9178-3 Being Out of Calibr.Transmitter Recalibr + (02:40:11, 17 December 2024)
- 05000361/LER-1982-078, /03L-0:on 820731,during Mode 2 Operation,Channel a DNBR Margin Monitor 2J1-0004-1 Failed Check Test.Caused by Faulty Hot Leg Resistance Temp Detector 2TE-0112-1.Detector Replaced + (02:40:14, 17 December 2024)
- ML20063K596 + (02:40:15, 17 December 2024)
- NG-94-0562, Responds to Violations Noted in Insp Rept 50-331/93-21. Corrective Actions:Proper Gap Between Circuit Breaker Plunger & Stationary Auxiliary Switch Mechanism for 1A401 Breaker Restored on 930924 + (02:40:15, 17 December 2024)
- 05000361/LER-1982-075-03, /03L-0:on 820727,during Mode 2 Operation,Channel a Local Power Density Margin Monitor 2J1-0003-1 Failed Channel Check.Caused by Burnout of Bar Graph Display Unit within Monitor.Unit Replaced + (02:40:17, 17 December 2024)
- ML20063K564 + (02:40:18, 17 December 2024)
- ML20063K550 + (02:40:19, 17 December 2024)
- ULNRC-02950, Forwards Callaway Refuel 6 ISI Summary Rept + (02:40:20, 17 December 2024)
- RC-94-0039, Requests Relief from ASME Section XI Requirements for Class 1,2 & 3 Integrally Welded Attachments Subject to Insp & All non-exempt Snubbers Required to Be Inspected & Tested. Relief Requests RR-02 & RR-06 Encl + (02:40:20, 17 December 2024)
- ML20063K459 + (02:40:21, 17 December 2024)
- ML20063K449 + (02:40:22, 17 December 2024)
- ML20063K457 + (02:40:22, 17 December 2024)
- 05000265/LER-1982-015-03, /03L-0:on 820804,during Monthly Preventive Maint on Emergency Diesel Generator,Small Leak Found in Flexible Hose to Fuel Line Pressure Gauge.Caused by Crack in Hose. Hose Removed.Connection Sealed W/Threaded Plug + (02:40:24, 17 December 2024)
- NG-94-0563, Responds to NRC RAI Re GL 92-08, Thermo-Lag 330-1 Fire Barriers, Per 10CFR50.54(f) + (02:40:25, 17 December 2024)
- 05000265/LER-1982-015, Forwards LER 82-015/03L-0 + (02:40:26, 17 December 2024)
- LIC-94-0038, Forwards 1993 Refueling Outage ISI Results & Rept for Applicable Repairs & Replacements Completed During Fuel Cycle 14 + (02:40:26, 17 December 2024)
- ML20063K432 + (02:40:27, 17 December 2024)
- ML20063K395 + (02:40:28, 17 December 2024)
- ML20063K372 + (02:40:29, 17 December 2024)
- 05000254/LER-1982-021-03, /03L-0:on 820801,1D RHR Sys Svc Water Pump Removed to Replace Leaking Vent on Low Pressure Stage of Pump.Caused by Stress Fatigue.Vent Connector Removed & Plugged + (02:40:31, 17 December 2024)
- ML20063K369 + (02:40:32, 17 December 2024)
- 3F0294-14, Informs That Attached Data Points Complete Necessary Library for ERDS Program for Unit 3 & Incorporated Into Sys on 940207 + (02:40:33, 17 December 2024)
- 05000254/LER-1982-021, Forwards LER 82-021/03L-0 + (02:40:34, 17 December 2024)
- 05000298/LER-1982-018-03, /03L-0:on 820727,torus Water Temp Rose to 102 F, Exceeding Tech Spec Limit.Caused by Greater Bulk Temps During HPCI Test.More Sophisticated Torus Temp Monitoring Sys Will Be Installed by Jul 1983 + (02:40:36, 17 December 2024)
- ML20063K361 + (02:40:37, 17 December 2024)
- 05000298/LER-1982-018, Forwards LER 82-018/03L-0.Detailed Event Analysis Submitted + (02:40:38, 17 December 2024)
- ML20063K355 + (02:40:39, 17 December 2024)
- ML20063K351 + (02:40:41, 17 December 2024)
- ML20063K349 + (02:40:42, 17 December 2024)
- 05000267/LER-1982-031-03, /03L-0:on 820727,pressure Control Valve PV-21244 Isolated for Repair of Internal Leakage.Caused by Normal Wear.Internals Replaced & Valve Controller PIC-21244 Recalibr + (02:40:44, 17 December 2024)