Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20066L219 + (16:43:55, 16 December 2024)
- RBG-27301, Suppl to 10CFR21 Deficiency Rept Re Failure of Rotor Winding on Transamerica Delaval/Nei Peebles Electric Products Diesel Generator.Initially Reported on 871116.Electrical Testing Instituted & Surveillance Continues.W/Two Oversize Drawings + (16:43:57, 16 December 2024)
- 05000244/LER-1982-023-03, /03L-0:on 821016,nipple to Discharge Pipe of 1B Component Cooling Water Pump Broke Off While Investigating Leakage.Caused by Personnel Error.Failed Pipe Replaced W/ Steel Schedule 80 Nipple + (16:44:00, 16 December 2024)
- ML20066L202 + (16:44:02, 16 December 2024)
- 05000334/LER-1982-045-03, /03L-0:on 821017,1A Containment Vacuum Pump Drive Belt Broke.Caused by Aging.Drive Belt Replaced + (16:44:03, 16 December 2024)
- 05000244/LER-1982-023, Forwards LER 82-023/03L-0 + (16:44:04, 16 December 2024)
- ML20066L191 + (16:44:05, 16 December 2024)
- 05000334/LER-1982-045, Forwards LER 82-045/03L-0 + (16:44:06, 16 December 2024)
- ML20066L186 + (16:44:06, 16 December 2024)
- 05000249/LER-1982-041-03, /03L-0:on 821021,discovered That Monthly Fire Protection Surveillances Dfpp 411-2 Were Partially Finished & Exceeded 31 Day Completion Requirement.Caused by Operating Shift Oversight + (16:44:08, 16 December 2024)
- ML20066L183 + (16:44:10, 16 December 2024)
- ML20066L181 + (16:44:10, 16 December 2024)
- 05000334/LER-1982-046-03, /03L-0:on 821023,shutdown Bank B Rod E-11 Declared Inoperable When Rod & Primary Voltage Readings Indicated Misalignment.Caused by Primary Voltage Power Supply Drift. Supply Adjusted + (16:44:12, 16 December 2024)
- ML20066L169 + (16:44:13, 16 December 2024)
- 05000255/LER-1982-039-01, /01T-0:on 821105 & 07,sample from Safety Injection Tank B (T-82B) Showed Boron Concentration Below Tech Spec Limit.Caused by Minor Leakage Past Loop Check Valve & SIT Check Valve or Fill & Drain Valve.Valves Will Be Inspecte + (16:44:15, 16 December 2024)
- B10581, Describes Activities Currently Planned for 1983 Refueling Outage to Assure Continued Operability of Steam Generators. Any Licensing Action Will Be Initiated in Time to Support Scheduled 830416 Outage + (16:44:16, 16 December 2024)
- ML20066L151 + (16:44:17, 16 December 2024)
- 05000249/LER-1982-041, Forwards LER 82-041/03L-0 + (16:44:18, 16 December 2024)
- 2CAN019110, Annual Rept of Steam Generator Tube Inservice Insps - 1990, Ltr Rept Submitted to NRC Document Control Desk + (16:44:18, 16 December 2024)
- 05000334/LER-1982-046, Forwards LER 82-046/03L-0 + (16:44:19, 16 December 2024)
- ML20066L142 + (16:44:19, 16 December 2024)
- 05000255/LER-1982-039, Forwards LER 82-039/01T-0 + (16:44:20, 16 December 2024)
- ML20066L120 + (16:44:21, 16 December 2024)
- ML20066L123 + (16:44:21, 16 December 2024)
- 05000373/LER-1982-127-03, /03L-0:on 820920,two Solid Radwaste Pipe Welds Found to Have Developed Corrosion Problems & Leaking.Caused by Use of 10% by Weight Sulfuric Acid & 4% by Weight Sodium Hydroxide in Low Carbon Steel Piping + (16:44:23, 16 December 2024)
- RA-20-0032, License Amendment Request to Reduce the Minimum Required Reactor Coolant System Flow Rate and Update the List of Analytical Methods Used in the Determination of Core Operating Limits + (16:44:24, 16 December 2024)
- ML20066L104 + (16:44:25, 16 December 2024)
- ML20066L102 + (16:44:25, 16 December 2024)
- ML20066L095 + (16:44:27, 16 December 2024)
- 05000395/LER-1982-027-03, /03L-0:on 821022,plant Entered Mode 2 for Initial Criticality W/One of Two Containment Hydrogen Monitors Inoperable.Caused by Inoperable Detector Cell in Containment Hydrogen Monitor B.Cell Replaced + (16:44:29, 16 December 2024)
- 05000387/LER-1982-037, Forwards LER 82-037/01T-0 + (16:44:30, 16 December 2024)
- 05000445/LER-1991-001, :on 910103,control Room Air Conditioning ESF Inadvertently Actuated When Current Surge Exceeded Capacity of Power Supply Output Fuse.Caused by Equipment Sensitivity. Bulb Replacement Training Held + (16:44:32, 16 December 2024)
- ML20066L082 + (16:44:33, 16 December 2024)
- 05000254/LER-1982-035-03, /03L-0:on 821021,during Surveillance Test,Offgas Isolation Valves Failed to Close within 15 Minutes.Caused by Setpoint Drift on 15 Minute Offgas Sys Isolation Delay Timer.Timer Reset & Procedure to Verify Setting Initiated + (16:44:35, 16 December 2024)
- 05000373/LER-1982-127, Forwards LER 82-127/03L-0 + (16:44:36, 16 December 2024)
- ML20066L069 + (16:44:39, 16 December 2024)
- 05000333/LER-1990-028, :on 901227,technician Touched Volt Meter Probe Monitor Sample Pump,Causing Monitor to Spike High & Resulting in Isolation of Reactor Bldg Ventilation Sys. Caused by Personnel Error.Procedure Revised + (16:44:41, 16 December 2024)
- 1CAN119001, Requests one-time Exemption from 10CFR55.59(a)(c) Requirements to Permit Alignment of Requalification Program Schedule W/Natl Exam Schedule + (16:44:42, 16 December 2024)
- ML20066L062 + (16:44:42, 16 December 2024)
- 05000254/LER-1982-035, Forwards LER 82-035/03L-0 + (16:44:43, 16 December 2024)
- JPN-91-006, Comments on SECY-90-318, Low Level Radwaste Policy Amends Act Title & Possession Provisions. Encourages NRC to Work W/Epa & Congress to Establish Single Set of Stds for Storage,Treatment & Disposal of Mixed Waste + (16:44:43, 16 December 2024)
- 05000395/LER-1982-027, Forwards LER 82-027/03L-0.Detailed Event Analysis Encl + (16:44:47, 16 December 2024)
- ML20066L050 + (16:44:48, 16 December 2024)
- 05000280/LER-1982-120-03, /03L-0:on 821020,w/unit at 100%,both Containment Vacuum Pumps Declared Inoperable.Caused by Sliding Vanes Becoming Bound to Respective Guide Slots Due to Water Damage to Carbon Vanes.Broken Belt Replaced on Pump 1-CV-P-1B + (16:44:50, 16 December 2024)
- 05000317/LER-1990-018, :on 900529,power Ratio Calculation Inoperable. Caused by Improper Labeling of Detector Connections.Detector Connections Corrected + (16:44:52, 16 December 2024)
- ML20066L040 + (16:44:53, 16 December 2024)
- ML20066L036 + (16:44:53, 16 December 2024)
- ML20066L034 + (16:44:54, 16 December 2024)
- ML20066L031 + (16:44:54, 16 December 2024)
- 05000325/LER-1982-111-03, /03L-0:on 821020,PCIV RHR Process Sample Valve 1-E11-F079A Did Not Fully Close on Command.Caused by Mispositioned Unutilized Limit Switch Actuator Arm.Arm Repositioned + (16:44:56, 16 December 2024)
- PY-CEI-NRR-1288, Forwards Proprietary NEDE-31567-P,addendum, Addendum to Perry 1 Reactor Internals Vibration Measurements (In-Core Guide Tube Fatigue Usage During Single Loop Operation). Encl Withheld (Ref 10CFR2.790) + (16:44:57, 16 December 2024)