Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20082Q799 + (11:31:40, 14 December 2024)
- ML20082Q793 + (11:31:40, 14 December 2024)
- RBG-16-450, Interim Deficiency Rept DR-132.Investigation Re Separation of Class IE & non-Class IE Wiring in Control Panel Incomplete.Interim or Final Status Rept Will Be Provided by 840119 + (11:31:41, 14 December 2024)
- 05000275/LER-1983-028-01, /01T-0:on 831130,air Gap Visible on Upper 25% of Containment Equipment Door.Review of Records Indicated Condition Existed During Initial Fuel Load.Procedure Change Made to Inspect Hatch & Add Bolts + (11:31:43, 14 December 2024)
- ML20082Q780 + (11:31:44, 14 December 2024)
- 05000368/LER-1983-046-03, /03L-0:on 830709,gross Activity Surveillance of Secondary Coolant Performed Outside Tech Spec Time Period Requirement.Caused by Personnel Error.Personnel Training Conducted + (11:31:46, 14 December 2024)
- RBG-16-457, Interim Deficiency Rept DR-112 Re Class IE Batteries Supplied by Power Conversion Products,Inc.Investigation Ongoing.Interim or Final Status Rept Will Be Provided by 831230 + (11:31:47, 14 December 2024)
- 05000285/LER-1983-010-03, /03L-0:on 831031,during Surveillance Test ST-ESF-5,Bliss Eagle Timer S1-1A on Sequencer S1-2 Failed to Time Out within Prescribed Limit.Caused by Dirty Operating Mechanism.Timer Replaced + (11:31:48, 14 December 2024)
- ML20082Q772 + (11:31:49, 14 December 2024)
- ML20082Q770 + (11:31:50, 14 December 2024)
- ML20082Q766 + (11:31:52, 14 December 2024)
- 05000285/LER-1983-008-03, Diesel Generator DG-2 Failed to Flash & Control Room Had No Indication That Diesel Up to Operating Speed.Caused by Failure of Modified Panalarm,Model 70-PCD-25 + (11:31:53, 14 December 2024)
- ML20082Q763 + (11:31:55, 14 December 2024)
- ML20082Q761 + (11:31:56, 14 December 2024)
- ML20082Q757 + (11:31:57, 14 December 2024)
- ML20082Q758 + (11:31:57, 14 December 2024)
- ML20082Q755 + (11:31:59, 14 December 2024)
- ML20082Q751 + (11:32:00, 14 December 2024)
- ML20082Q750 + (11:32:01, 14 December 2024)
- ML20082Q746 + (11:32:02, 14 December 2024)
- 05000305/LER-1983-027-03, Cooling Water HX 1A Removed from Svc to Repair Leak.Caused by Sand Erosion.Line Patch Welded & Tested.Hx Returned to Svc + (11:32:03, 14 December 2024)
- ML20082Q743 + (11:32:05, 14 December 2024)
- 05000362/LER-1983-101-03, /03L-0:on 831111,Channel B Experienced More than Three auto-restarts within 12 H Period.No Cause Found. Channel Operability Demonstrated by Completion of Channel Functional Test on 831111 + (11:32:06, 14 December 2024)
- ML20082Q738 + (11:32:11, 14 December 2024)
- ML20082Q732 + (11:32:12, 14 December 2024)
- ML20082Q734 + (11:32:12, 14 December 2024)
- ML20082Q730 + (11:32:13, 14 December 2024)
- ML20082Q728 + (11:32:13, 14 December 2024)
- ML20082Q724 + (11:32:14, 14 December 2024)
- ML20082Q722 + (11:32:14, 14 December 2024)
- RBG-16-451, Interim Deficiency Rept DR-103 Re Lifting Lugs on Containment Dome.Investigation Ongoing.Interim or Final Rept Expected by 840118 + (11:32:15, 14 December 2024)
- ML20082Q703 + (11:32:16, 14 December 2024)
- 05000362/LER-1983-089-03, /03L-0:on 831105,auxiliary Feedwater Pump 3P-140 Declared Inoperable to Replace Broken Torque Switch on Motor Operator for Steam Inlet Valve 3HV-4716.Switch Overtightened During Mfg.Switch Replaced + (11:32:17, 14 December 2024)
- ST-HL-AE-1032, Advises That Anchor Bolt/Embed Evaluation Program in Response to Violations Noted in IE Insp Repts 50-498/83-02 & 50-499/83-02 Will Be Completed by End of First Quarter 1984 + (11:32:18, 14 December 2024)
- ML20082Q692 + (11:32:19, 14 December 2024)
- ML20082Q696 + (11:32:19, 14 December 2024)
- ML20082Q688 + (11:32:22, 14 December 2024)
- ML20082Q684 + (11:32:22, 14 December 2024)
- ML20082Q681 + (11:32:23, 14 December 2024)
- RBG-16-456, Interim Deficiency Rept DR-107 Re 125-volt Air Circuit Breakers Supplied by Gould-Brown Boveri.Final Status Rept Expected by 840110 + (11:32:23, 14 December 2024)
- ML20082Q673 + (11:32:25, 14 December 2024)
- ML20082Q668 + (11:32:26, 14 December 2024)
- ML20082Q669 + (11:32:26, 14 December 2024)
- ML20082Q665 + (11:32:27, 14 December 2024)
- U-602312, Provides Plant Semi-Annual FFD Rept for Period Ending 940630 + (11:32:27, 14 December 2024)
- ML20082Q654 + (11:32:28, 14 December 2024)
- 05000373/LER-1983-139-03, /03L-0:on 831102,two Piping Ys Designed & Installed on Standby Gas Treatment wide-range Sample Sys Suction Piping & Matl,Weld & NDE Documentation Lost.Caused by Personnel Error.Ys Replaced + (11:32:29, 14 December 2024)
- ML20082Q651 + (11:32:31, 14 December 2024)
- ML20082Q648 + (11:32:32, 14 December 2024)
- ML20082Q649 + (11:32:32, 14 December 2024)
- ML20082Q647 + (11:32:33, 14 December 2024)
- ML20082Q646 + (11:32:34, 14 December 2024)