Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- LR-N14-0049, Salem/Hope Creek, Single Positive Test Form, for Pre-Access, Collected on 09/19/2013 + (19:48:04, 13 July 2018)
- LR-N14-0049, Salem/Hope Creek, Single Positive Test Form, for Followup, Collected on 10/21/2013 + (19:48:23, 13 July 2018)
- LR-N14-0049, Salem/Hope Creek, Single Positive Test Form, for Random, Collected on 12/13/2013 + (19:50:04, 13 July 2018)
- LR-N14-0049, Salem/Hope Creek, Single Positive Test Form, for Random, Collected on 12/04/2013 + (19:50:14, 13 July 2018)
- LR-N14-0049, Salem/Hope Creek, Single Positive Test Form, for Pre-Access, Collected on 03/27/2013 + (19:50:37, 13 July 2018)
- LR-N14-0049, Salem/Hope Creek, Single Positive Test Form, for Pre-Access, Collected on 04/03/2013 + (19:50:44, 13 July 2018)
- LR-N14-0049, Salem/Hope Creek, 10 CFR Part 26, Subpart I - Managing Fatigue, for Period Ending 2013 + (19:50:48, 13 July 2018)
- NL-14-0249, Joseph M. Farley Nuclear Plant, Unit 1 - Updated Seismic Recommendation 2.3 Walkdown Report + (20:02:22, 13 July 2018)
- ULNRC-06086, Callaway, Annual Reporting Form for Drug and Alcohol Tests, for the Period 2013 + (20:09:30, 13 July 2018)
- NL-13-1503, Joesph M. Farley, Units 1 and 2, Calculation Number: PRA-BC-F-11-002, Component Selection for Farley Fire PRA, Version 3. Part 1 of 2 + (20:47:52, 13 July 2018)
- NL-13-1503, Joseph M. Farley, Units 1 and 2, Calculations Number: PRA-BC-F-11-004, Fire PRA Logic Model for Farley Nuclear Plants, Version 2 + (20:48:38, 13 July 2018)
- NL-13-1503, Farley, Units 1 and 2, Calculation Number: SE-C051326701-008, NFPA 805 Fire Risk Evaluations, Version 1.0. Part 4 of 5 + (20:49:20, 13 July 2018)
- NL-13-1503, Farley, Units 1 and 2, Calculation Number: SE-C051326701-008, NFPA 805 Fire Risk Evaluations, Version 1.0. Part 3 of 5 + (20:49:55, 13 July 2018)
- NL-13-1503, Farley, Units 1 and 2, Calculation Number: SE-C051326701-008, NFPA 805 Fire Risk Evaluations, Version 1.0. Part of 5 + (20:50:31, 13 July 2018)
- NL-13-1503, Farley, Units 1 and 2, Calculation Number: SE-C051326701-008, NFPA 805 Fire Risk Evaluations, Verion 1.0. Part 1 of 5 + (20:51:10, 13 July 2018)
- RS-14-029, Annual Report on the Meteorological Monitoring Program at the Braidwood Nuclear Power Station 2012 + (21:25:28, 13 July 2018)
- RS-14-029, Annual Report on the Meteorological Monitoring Program at the Braidwood Nuclear Power Station 2011 + (21:25:35, 13 July 2018)
- RS-14-029, Transmittal of Annual Report on the Meteorological Monitoring Program at the Braidwood Nuclear Power Station 2010 + (21:25:42, 13 July 2018)
- RS-14-029, Annual Report on the Meteorological Monitoring Program at the Braidwood Nuclear Power Station 2009 + (21:25:49, 13 July 2018)
- RS-14-029, Annual Report on the Meteorological Monitoring Program at the Braidwood Nuclear Power Station 2008 + (21:25:56, 13 July 2018)
- RS-14-029, Monthly Report on the Meteorological Monitoring Program at the Braidwood Nuclear Generating Station + (21:26:02, 13 July 2018)
- RS-14-029, Status of Fish Communities and Sport Fishery in the Kankakee River and Tributary Streams: 2005 Basin Survey + (21:28:25, 13 July 2018)
- RS-14-029, Braidwood Station Kankakee River Fish Monitoring Program, 2010 + (21:28:32, 13 July 2018)
- RS-14-029, Transmittal of Application for an Incidental Take Permit for Threatened or Endangered Species and Conservation Plan + (21:28:38, 13 July 2018)
- RS-14-029, Final Report: Characterization of Unionid Communities Near the Braidwood Nuclear Station Kankakee River Discharge Location + (21:28:55, 13 July 2018)
- RS-14-029, Standard Operating Procedures for Braidwood Station'S Fisheries Monitoring Program in the Kankakee River and Horse Creek + (21:29:00, 13 July 2018)
- RS-14-029, Braidwood Station, 2011 Benthos Monitoring and Historical Fish and Benthos Comparisons + (21:29:06, 13 July 2018)
- RS-14-029, Braidwood Station, Kankakee River Fish Monitoring Program, 2012 + (21:29:13, 13 July 2018)
- RS-14-029, Braidwood Station Kankakee River Fish Monitoring Program, 1991-2013 - Tables Requested by the NRC to Describe the Number of Fish Caught by Sampling Gear and Species at Each Monitoring Location + (21:29:22, 13 July 2018)
- RS-14-029, Final Report: Unionid Relocation Near the Braidwood Nuclear Station Kankakee River Discharge Location + (21:29:27, 13 July 2018)
- RS-14-029, Investigations to Determine Presence of State-Listed Species of Fish and Freshwater Mussels in the Kankakee River Near the Braidwood Nuclear Station Warmwater Discharge Channel + (21:29:50, 13 July 2018)
- LR-N14-0036 + (21:34:14, 13 July 2018)
- RS-14-039, Quad Cities, Units 1 and 2 - Additional Information Regarding License Amendment Request Associated with Use of Neutron Absorbing Inserts in Spent Fuel Pool Storage Racks + (21:48:12, 13 July 2018)
- RS-14-006, Clinton, Unit 1, Updated Safety Analysis Report, Revision 16, Chapter 16 - Technical Specifications + (22:02:35, 13 July 2018)
- RS-14-006, Clinton, Unit 1, Updated Safety Analysis Report, Revision 16, Chapter 15 - Accident Analysis + (22:02:48, 13 July 2018)
- RS-14-006, Clinton, Unit 1, Updated Safety Analysis Report, Revision 16, Appendix C - Computer Programs + (22:03:26, 13 July 2018)
- RS-14-006, Clinton, Unit 1, Updated Safety Analysis Report, Revision 16, Appendix B - Construction Material Standards and Quality Control Procedures + (22:03:30, 13 July 2018)
- RS-14-006, Clinton, Unit 1, Updated Safety Analysis Report, Revision 16, Appendix a - Glossary + (22:03:34, 13 July 2018)
- RS-14-006, Clinton, Unit 1, Updated Safety Analysis Report, Revision 16, Chapter 17 - Quality Assurance + (22:03:37, 13 July 2018)
- RS-14-006, Clinton, Unit 1, Updated Safety Analysis Report, Revision 16, Chapter 11 - Radioactive Waste Management + (22:03:55, 13 July 2018)
- RS-14-006, Clinton, Unit 1, Updated Safety Analysis Report, Revision 16, Chapter 10 - Steam and Power Conversion System + (22:03:59, 13 July 2018)
- RS-14-006, Clinton, Unit 1, Updated Safety Analysis Report, Revision 16, Chapter 9 - Auxiliary Systems + (22:04:13, 13 July 2018)
- RS-14-006, Clinton, Unit 1, Updated Safety Analysis Report, Revision 16, Chapter 8 - Electric Power + (22:04:20, 13 July 2018)
- RS-14-006, Clinton, Unit 1, Updated Safety Analysis Report, Revision 16, Chapter 7 - Instrument and Control Systems + (22:05:00, 13 July 2018)
- RS-14-006, Clinton, Unit 1, Updated Safety Analysis Report, Revision 16, Chapter 13 - Conduct of Operations + (22:05:05, 13 July 2018)
- RS-14-006, Clinton, Unit 1, Updated Safety Analysis Report, Revision 16, Chapter 5 - Reactor Coolant System and Connected Systems + (22:05:12, 13 July 2018)
- RS-14-006, Clinton, Unit 1, Updated Safety Analysis Report, Revision 16, Chapter 4 - Reactor + (22:05:19, 13 July 2018)
- RS-14-006, Clinton, Unit 1, Updated Safety Analysis Report, Revision 16, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1. Sheet 63 of 111 Through Figure 3.6-1. Sheet 69 of 111 + (22:05:29, 13 July 2018)
- RS-14-006, Clinton, Unit 1, Updated Safety Analysis Report, Revision 16, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1. Sheet 56 of 111 Through Figure 3.6-1. Sheet 62 of 111 + (22:05:33, 13 July 2018)
- RS-14-006, Clinton, Unit 1, Updated Safety Analysis Report, Revision 16, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1. Sheet 50 of 111 Through Figure 3.6-1. Sheet 55 of 111 + (22:05:37, 13 July 2018)
- RS-14-006, Clinton, Unit 1, Updated Safety Analysis Report, Revision 16, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figures 3.6-2 Through Figure 3.6-16 + (22:05:56, 13 July 2018)