Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20107J486 + (06:56:45, 13 December 2024)
- IR 05000363/1974002 + (06:56:46, 13 December 2024)
- ML20107J478 + (06:56:47, 13 December 2024)
- ML20107J462 + (06:56:48, 13 December 2024)
- ML20107J461 + (06:56:49, 13 December 2024)
- ML20107J455 + (06:56:49, 13 December 2024)
- ML20107J451 + (06:56:50, 13 December 2024)
- 05000373/LER-1985-009-01, :on 850122,investigation Determined That No Assigned Calibr or Functional Test Procedure for Suction Pressure Switch Existed as Required by Tech Specs.Caused by Improper Setpoint Info.Switches Calibr + (06:56:52, 13 December 2024)
- ML20107J434 + (06:56:53, 13 December 2024)
- 05000413/LER-1985-006, :on 850120,hot Standby Initiated After Reactor Coolant Average Temp Could Not Be Increased to Greater than 541 F 15 Minutes After Temp Decrease During Performance of Natural Circulation Verification Test + (06:56:54, 13 December 2024)
- 05000250/LER-1984-029, :on 841127,turbine Runback to 50 MW & Approx 65% Reactor Power Occurred.Caused by Personnel Error.Load Decrease Stopped by Raising Governor Oil Pressure Which Increased Generator Load to Approx 225 MW + (06:56:56, 13 December 2024)
- ML20107J430 + (06:56:58, 13 December 2024)
- STC-20-032, Seminar with Medical Licensees to Request Temporary Regulatory Relief During the COVID-19 Public Health Emergency + (06:56:58, 13 December 2024)
- 05000361/LER-1984-070, :on 841105,during Preparations to Lift Reactor Vessel Head from Pressure Vessel,Horizontal Inflatable Seal Failed & Completely Depressurized.Instrument Air & Nitrogen Backup Pressurization Supplies Isolated + (06:57:01, 13 December 2024)
- 05000325/LER-1984-027, :on 840930,RCIC Automatically Isolated Due to Actuation of Sys a Isolation Logic RCIC Equipment Room Temp Instrument 1-E51-N602A.Caused by Deflected Steam from Leak at RCIC Sys Valve 1-E51-V20 + (06:57:03, 13 December 2024)
- ML20107J415 + (06:57:04, 13 December 2024)
- 05000339/LER-1984-007-02, :on 840916,discovered Smoke Detector in Control Room Emergency Air Supply Failed to Operate as Required. Caused Not Stated.Fire Watch Placed in Effect During Inoperability.Detector Replaced + (06:57:06, 13 December 2024)
- ML20107J409 + (06:57:07, 13 December 2024)
- 05000324/LER-1984-001-02, :on 840330,local Leak Rate Testing of Primary Containment Isolation Valves Revealed Nonquantifiable Leak Rate for Reactor Feedwater Line B Penetration X-9B.Caused by Problems W/Seat discs,O-rings & Bellows + (06:57:09, 13 December 2024)
- ML20107J397 + (06:57:10, 13 December 2024)
- ML20107J378 + (06:57:11, 13 December 2024)
- LIC-96-0053, Responds to Generic Ltr 96-01, Testing of SR Logic Circuits + (06:57:12, 13 December 2024)
- ML20107J374 + (06:57:12, 13 December 2024)
- RBG-20-165, Forwards 20 Oversize Drawings Requested by Instrumentation & Control Sys Branch Re Automatic Depressurization Sys. Drawings Will Close Out SER Confirmatory Item 28,Table 1.4. Aperture Cards Available in PDR + (06:57:16, 13 December 2024)
- ML20107J357 + (06:57:18, 13 December 2024)
- ML20107J348 + (06:57:20, 13 December 2024)
- 05000286/LER-1985-001-01, :on 850121,unit Trip & Safety Injection Actuation Occurred.Caused by Operators Switching Bus 31 to Backup Power Due to Low Voltage on Two Buses.Solenoid Coil Replaced & Surveillance Test Peformed + (06:57:21, 13 December 2024)
- IR 05000219/1974008 + (06:57:23, 13 December 2024)
- ML20107J339 + (06:57:25, 13 December 2024)
- 05000286/LER-1985-002-01, :on 850123,high Level Generator Triggered Turbine & Reactor Trips.Caused by Feedwater Sys Perturbation Due to Starting Second Condensate Pump & Recirculation Valve.Valve Repaired & Calibr + (06:57:26, 13 December 2024)
- ML20107J317 + (06:57:27, 13 December 2024)
- ML20107J313 + (06:57:28, 13 December 2024)
- ML20107J287 + (06:57:29, 13 December 2024)
- ML20107J284 + (06:57:29, 13 December 2024)
- ML20107J282 + (06:57:30, 13 December 2024)
- ML20107J281 + (06:57:31, 13 December 2024)
- ML20107J274 + (06:57:32, 13 December 2024)
- ML20107J273 + (06:57:33, 13 December 2024)
- ML20107J271 + (06:57:34, 13 December 2024)
- ML20107J268 + (06:57:34, 13 December 2024)
- DCL-85-050, Provides Final Responses to IE Bulletins 79-02, Pipe Support Base Plate Designs Using Concrete Expansion Anchor Bolts & 79-14, Seismic Analysis for As-Built Safety- Related Piping Sys + (06:57:36, 13 December 2024)
- ML20107J266 + (06:57:36, 13 December 2024)
- ML20107J261 + (06:57:37, 13 December 2024)
- 05000388/LER-1984-020-01, :on 840929,unplanned ESF Actuation Occurred During Calibr of Differential Pressure Instrument Resulting in Isolation of Reactor Water Cleanup Sys.Caused by Closure of Containment Isolation Valve + (06:57:39, 13 December 2024)
- ML20107J259 + (06:57:40, 13 December 2024)
- ML20107J256 + (06:57:41, 13 December 2024)
- ML20107J253 + (06:57:43, 13 December 2024)
- ML20107J246 + (06:57:44, 13 December 2024)
- ML20107J236 + (06:57:45, 13 December 2024)
- ML20107J234 + (06:57:46, 13 December 2024)
- ML20107J229 + (06:57:47, 13 December 2024)