Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20118B543 + (02:17:58, 13 December 2024)
- ML20118B539 + (02:17:59, 13 December 2024)
- ML20118B537 + (02:17:59, 13 December 2024)
- ML20118B536 + (02:18:00, 13 December 2024)
- ML20118B529 + (02:18:01, 13 December 2024)
- ML20118B531 + (02:18:01, 13 December 2024)
- ML20118B527 + (02:18:02, 13 December 2024)
- ML20118B526 + (02:18:02, 13 December 2024)
- ML20118B524 + (02:18:03, 13 December 2024)
- ML20118B514 + (02:18:04, 13 December 2024)
- U-602045, Forwards Response to GL 92-04, Resolution of Issues Re Reactor Vessel Water Level in BWRs Per 10CFR50.54(f). Util Endorses BWR Owners Group Plan,Including Analysis & Testing Program + (02:18:05, 13 December 2024)
- 05000354/LER-1992-008-02, :on 920827,containment Penetration Test Isolation Valve Opened During Implementation of Troubleshooting Plan.Caused by Procedural Inadequacy. Troubleshooting Procedure to Be Modified + (02:18:07, 13 December 2024)
- ML20118B385 + (02:18:08, 13 December 2024)
- ML20118B439 + (02:18:08, 13 December 2024)
- 0CAN099211, Forwards Proposed Rev to Industrial Security Plan, Allowing Greater Flexibility to Determine Security Shift Staffing Requirements & Compensatory Measures,Based on Status of Security Program.Rev Withheld (Ref 10CFR73.21) + (02:18:09, 13 December 2024)
- ML20118B283 + (02:18:09, 13 December 2024)
- 05000285/LER-1992-016, Revises Commitment to AEC Safety Guide 1 (Reg Guide 1.1), Contained in Section 6.2 of Updated Sar.Commitment Covers Method of Calculating Available Net Positive Suction Head for Containment Spray Sys Per LER 92-016 + (02:18:10, 13 December 2024)
- 05000334/LER-1992-007-01, :on 920825,analog Rod Position Indication for Control Rod K-8 Intermittently Fluctuated.On 920826, Determined That Primary Voltage Readings Not Taken Every 4 H.Caused by Personnel Error.Event Reviewed + (02:18:12, 13 December 2024)
- ML20118B241 + (02:18:14, 13 December 2024)
- ML20118B238 + (02:18:15, 13 December 2024)
- ML20118B220 + (02:18:16, 13 December 2024)
- TXX-9240, Suppls 920331 Response to Unresolved Item Noted in Insp Repts 50-445/91-202 & 50-446/91-201.Corrective Actions: Automatic Transfer of Faulted Motor Control Ctrs Between Units Now Conforms to Reg Guide 1.81,Positions C2 & C3 + (02:18:16, 13 December 2024)
- ML20118B219 + (02:18:20, 13 December 2024)
- ML20118B214 + (02:18:21, 13 December 2024)
- 05000353/LER-1992-010-02, :on 920828,main Steam Safety Valves Setpoint Drifted Due to Corrosion Induced Bonding within Valves. Affected SRVs Removed for Setpoint Testing.Srv Setpoint Drift Pending Conclusion of Ongoing Testing + (02:18:23, 13 December 2024)
- ML20118B212 + (02:18:24, 13 December 2024)
- ML20118B205 + (02:18:25, 13 December 2024)
- ML20118B201 + (02:18:27, 13 December 2024)
- ML20118B196 + (02:18:28, 13 December 2024)
- ML20118B195 + (02:18:29, 13 December 2024)
- 05000423/LER-1992-020-01, :on 920824,Auxiliary Bldg Filter Sys Fans Tripped W/Vivs Set at 100%.Caused by Failure to Perform Adequate Technical & Safety Evaluation of Auxiliary Bldg Filter Sys.Event Will Be Reviewed W/Engineers + (02:18:33, 13 December 2024)
- 05000321/LER-1992-021, :on 920827,unit Scrammed & Group 1 Primary Containment Isolation Sys Valves Closed,Resulting in Initiation of Sgts,Hpci & RCIC Sys.Caused by Organic Instrusion.Filter Elements Replaced + (02:18:35, 13 December 2024)
- ML20118B173 + (02:18:37, 13 December 2024)
- ML20118B172 + (02:18:38, 13 December 2024)
- ML20118B170 + (02:18:39, 13 December 2024)
- 05000498/LER-1992-011, :on 920824,identified That RCP Undervoltage & Underfrequency Trip Not Tested Completely Per Ts.Cause Due to Writers Not Identifying Need to Verify Bsm Lights. Procedure for Field Changes Will Be Revised + (02:18:40, 13 December 2024)
- 05000321/LER-1992-022, :on 920827,Train a of Standby Gas Treatment Sys Received Automatic Initiation Signal But No Equipment Actuations Occurred.Cause Not Determined.Fission Product Monitoring Sys Returned to Svc + (02:18:43, 13 December 2024)
- ML20118B134 + (02:18:44, 13 December 2024)
- ML20118B132 + (02:18:45, 13 December 2024)
- HL-2921, Forwards Response to Suppl 1 to NRC Bulletin 92-001, Failure of Thermo-Lag 330 Fire Barrier Sys to Perform Specified Fire Endurance Function. Affected Fire Zones Have Installed Operable Fire Detection Sys + (02:18:46, 13 December 2024)
- ML20118B109 + (02:18:47, 13 December 2024)
- TXX-9243, Responds to NRC Re Violations Noted in Insp Repts 50-445/92-24 & 50-446/92-24 on 920607-0718.Corrective Actions:Mdafwp Pump 1-01 Reworked W/Proper Number of Rings of Packaging & Lessons Learned Will Be Completed by 921130 + (02:18:47, 13 December 2024)
- 05000254/LER-1992-021-02, :on 920825,governor Instabilities Noted by Operator.Caused by Air Trapped in Governor Compensation Sys. Governor Compensators Vented & Readjusted & Governor Sys Returned to Svc + (02:18:49, 13 December 2024)
- 05000374/LER-1992-012-05, :on 920827,reactor Scram Experienced as Result of Main Turbine Trip,Causing Thrust Bearing Wear Detector Signal.Caused by Shift in Setpoint for Thrust Bearing Wear Detector.Clutch Spring Retorqued + (02:18:51, 13 December 2024)
- 05000313/LER-1992-006-02, :on 920826,inadvertent Actuation of CR Emergency Ventilation Sys Occurred Due to Invalid Radiation Monitor Trip.Caused by Undesirable Pulse on Output of Level Amplifier.Circuit Card Replaced + (02:18:54, 13 December 2024)
- 05000424/LER-1992-008-03, :on 920914,steam Flow/Feed Flow Mismatch Alarm Received & Maint Feedwater Pump a Speed & Discharge Pressure Rapidly Reduced.Caused by Failure of Speed Controller/ Tracker Card.Failed Circuit Card Replaced + (02:18:56, 13 December 2024)
- 05000318/LER-1992-006-01, :on 920817,reactor Tripped Due to Automatic Actuation of Rps.Possibly Caused by MSIV Hydraulic Problem or Mechanical Binding.Hydraulic Fluid Changed & Hydraulic Fluid Sample Valve Replaced + (02:18:58, 13 December 2024)
- 05000443/LER-1992-012, :on 920826,ESF Actuation Occurred,Causing SG Blowdown to Isolate.Caused by Personnel Failing to Follow Procedures for Surveillance Activities.Written Guidance Issued Re Specifying Function of Each Jumper + (02:19:01, 13 December 2024)
- 05000499/LER-1991-010-01, :on 911224,pressurizer Spray Valve PCV-655C Failed Open,Resulting in Automatic Reactor Trip & SI Actuation on Low Pressure.Caused by Disengagement of Feedback Arm Linkage.Locking Nuts Added + (02:19:03, 13 December 2024)
- ML20118B080 + (02:19:04, 13 December 2024)
- NG-92-3961, Forwards Response to GL 87-02, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Usi A-46. Util Commits to Use SQUG Methodology, Per Rev 2 to Generic Implementation Procedure + (02:19:04, 13 December 2024)