Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- RC-18-0080, Virgil C. Summer Nuclear Station, Unit 1, Updated Final Safety Analysis Report, Chapter 8.0, Electric Power + (19:45:13, 12 September 2018)
- RC-18-0080, Virgil C. Summer Nuclear Station, Unit 1, Updated Final Safety Analysis Report, Chapter 7.0, Instrumentation and Controls + (19:46:27, 12 September 2018)
- RC-18-0080, Virgil C. Summer Nuclear Station, Unit 1, Updated Final Safety Analysis Report, Chapter 6.0, Engineered Safety Features + (19:47:25, 12 September 2018)
- RC-18-0080, Virgil C. Summer Nuclear Station, Unit 1, Updated Final Safety Analysis Report, Chapter 5.0, Reactor Coolant System + (19:48:13, 12 September 2018)
- RC-18-0080, Virgil C. Summer Nuclear Station, Unit 1, Updated Final Safety Analysis Report, Chapter 3.0, Design of Structures, Components, Equipment and Systems + (19:50:25, 12 September 2018)
- RC-18-0080, Virgil C. Summer Nuclear Station, Unit 1, Updated Final Safety Analysis Report, Figures 2F, Key to Soil Symbols and Terms + (19:50:46, 12 September 2018)
- RC-18-0080, Virgil C. Summer Nuclear Station, Unit 1, Updated Final Safety Analysis Report, Figures 2E, Log of Boring C-2I + (19:51:06, 12 September 2018)
- RC-18-0080, Virgil C. Summer Nuclear Station, Unit 1, Updated Final Safety Analysis Report, Figure 2.5-79, Cross Section C-C' + (19:51:16, 12 September 2018)
- RC-18-0080, Virgil C. Summer Nuclear Station, Unit 1, Updated Final Safety Analysis Report, Figure 2.5-78, Cross Section B-B' + (19:51:31, 12 September 2018)
- RC-18-0080, Virgil C. Summer Nuclear Station, Unit 1, Updated Final Safety Analysis Report, Figure 2.5-77, Cross Section A-A' + (19:52:21, 12 September 2018)
- RC-18-0080, Virgil C. Summer Nuclear Station, Unit 1, Updated Final Safety Analysis Report, Figure 2.5-3, Regional Geologic Map + (19:52:29, 12 September 2018)
- RC-18-0080, Virgil C. Summer Nuclear Station, Unit 1, Updated Final Safety Analysis Report, Figure 2.5-27, Structure Map of Control Building Excavation + (19:52:43, 12 September 2018)
- RC-18-0080, Virgil C. Summer Nuclear Station, Unit 1, Updated Final Safety Analysis Report, Figure 2.5-25, Structure Map of Reactor Building and Staging Area Excavations + (19:52:59, 12 September 2018)
- RC-18-0080, Virgil C. Summer Nuclear Station, Unit 1, Updated Final Safety Analysis Report, Figure 2.5-13, Areal Geological Map + (19:53:06, 12 September 2018)
- RC-18-0080, Virgil C. Summer Nuclear Station, Unit 1, Updated Final Safety Analysis Report, Figure 2.5-10, Regional Erts Photo Linear Map + (19:53:13, 12 September 2018)
- RC-18-0080, Virgil C. Summer Nuclear Station, Unit 1, Updated Final Safety Analysis Report, Figure 2.4-6, Site Improvements + (19:54:24, 12 September 2018)
- RC-18-0080, Virgil C. Summer Nuclear Station, Unit 1, Updated Final Safety Analysis Report, Figure 2.1-26, Land Use within 10 Miles of the Site, 1966-1968 + (19:54:32, 12 September 2018)
- RC-18-0080, Virgil C. Summer Nuclear Station, Unit 1, Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant + (19:54:47, 12 September 2018)
- RC-18-0080, Virgil C. Summer Nuclear Station Unit 1 Submittal of Updated Final Safety Analysis Report, Updated Through May 31, 2018, Cover Sheet + (19:54:56, 12 September 2018)
- NG-18-0090, Calculation No. NEE-323-CALC-002, Dose Rate Evaluation of Reactor Vessel Water Levels During Refueling for EAL Thresholds + (20:26:53, 12 September 2018)
- NG-18-0090, Calculation No. NEE-323-CALC-004, Revised Liquid Radiological EALs Per NEI 99-01 + (20:27:34, 12 September 2018)
- NG-18-0090, Calculation No. NEE-323-CALC-003, Documentation of the RU1 Emergency Action Levels + (20:28:34, 12 September 2018)
- EPID:L-2018-LLA-0092 + (20:39:19, 12 September 2018)
- EPID:L-2017-LLA-0287 + (20:53:52, 12 September 2018)
- ML18145A075 + (20:55:59, 12 September 2018)
- ML18142B056 + (21:23:01, 12 September 2018)
- ML18142A248 + (21:33:22, 12 September 2018)
- ML18136A728 + (22:25:14, 12 September 2018)
- ML18135A266 + (22:38:33, 12 September 2018)
- ML18135A252 + (22:38:44, 12 September 2018)
- NRC 2018-0016, Point Beach Nuclear Plant, Units 1 & 2, Submittal of 2017 Update of Final Safety Analysis Report + (23:31:58, 12 September 2018)
- ML18121A447 + (01:25:22, 13 September 2018)
- ML18113A291 + (03:07:02, 13 September 2018)
- RC-18-0080, Virgil C. Summer Nuclear Station, Unit 1, Updated Final Safety Analysis Report, Approved FSAR Revision Notices + (04:58:19, 13 September 2018)
- RC-18-0080, Virgil C. Summer Nuclear Station, Unit 1, Updated Final Safety Analysis Report, Chapter 4.0, Reactor + (05:02:21, 13 September 2018)
- ML18106A080 + (10:15:26, 13 September 2018)
- EPID:L-2017-LLA-0127 + (11:24:52, 13 September 2018)
- ML18096B543 + (11:52:48, 13 September 2018)
- ML18081A493 + (15:11:30, 13 September 2018)
- ML18081A367 + (15:13:37, 13 September 2018)
- ML18080A234 + (15:20:54, 13 September 2018)
- ML18079A653 + (15:33:56, 13 September 2018)
- ML18079A150 + (15:36:56, 13 September 2018)
- ML18079A125 + (15:39:00, 13 September 2018)
- ML18079A102 + (15:40:18, 13 September 2018)
- ML18078B264 + (15:43:31, 13 September 2018)
- ML18078A777 + (15:51:37, 13 September 2018)
- ML18075A159 + (16:07:11, 13 September 2018)
- ML18072A309 + (17:24:39, 13 September 2018)
- ML18072A277 + (17:26:23, 13 September 2018)
- ML18065B277 + (21:37:17, 13 September 2018)