Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML12160A370 + (06:43:37, 12 January 2025)
- ML12160A364 + (06:43:37, 12 January 2025)
- ML12160A363 + (06:43:38, 12 January 2025)
- ML12160A357 + (06:43:39, 12 January 2025)
- ML12160A362 + (06:43:39, 12 January 2025)
- ML12160A356 + (06:43:40, 12 January 2025)
- ML12160A355 + (06:43:41, 12 January 2025)
- ML12160A354 + (06:43:41, 12 January 2025)
- ML12160A353 + (06:43:42, 12 January 2025)
- ML12160A352 + (06:43:43, 12 January 2025)
- ML12160A351 + (06:43:43, 12 January 2025)
- ML12160A350 + (06:43:45, 12 January 2025)
- ML12160A349 + (06:43:45, 12 January 2025)
- 05000296/LER-2012-002, Regarding Main Steam Isolation Valve Leakage in Excess of Technical Specification Requirements + (06:43:49, 12 January 2025)
- RC-12-0087, Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.1 and 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident + (06:43:49, 12 January 2025)
- RC-12-0088, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident + (06:43:50, 12 January 2025)
- RC-12-0093, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident + (06:43:51, 12 January 2025)
- 05000287/LER-2012-001, For Oconee, Unit 3, Regarding Three Main Steam Relief Valves (MSRV) Lift Pressure Exceeds + 1% Tolerance + (06:43:54, 12 January 2025)
- ML12160A304 + (06:43:54, 12 January 2025)
- ML12160A299 + (06:43:58, 12 January 2025)
- DCL-12-061, Pacific Gas and Electric Companys Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Emergency Preparedness Aspects of Recommendation 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ich + (06:43:59, 12 January 2025)
- LR-N12-0172, PSEG Nuclear LLCs 90-Day Response to NRC Request for Information Pursuant to Title 10 Ofthe Code of Federal Regulations 50.54(f) Regarding Recommendation 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Acci + (06:44:02, 12 January 2025)
- DCL-12-060, Pacific Gas and Electric Companys Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident + (06:44:05, 12 January 2025)
- LR-N12-0171, PSEG Nuclear LLCs Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident + (06:44:07, 12 January 2025)
- LR-N12-0170, PSEG Nuclear LLCs Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendations 2.1 and 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident + (06:44:10, 12 January 2025)
- ML12160A288 + (06:44:13, 12 January 2025)
- IR 05000244/2012008 + (06:44:30, 12 January 2025)
- ML12160A268 + (06:44:30, 12 January 2025)
- ML12160A245 + (06:44:31, 12 January 2025)
- ML12160A170 + (06:44:32, 12 January 2025)
- ML12160A194 + (06:44:32, 12 January 2025)
- ML12160A169 + (06:44:33, 12 January 2025)
- IR 05000362/2011006 + (06:44:34, 12 January 2025)
- Press Release-12-070, NRC, FERC Commissioners to Discuss Electrical Grid Issues June 15 in Washington, D.C + (06:44:34, 12 January 2025)
- IR 05000277/2012007 + (06:44:43, 12 January 2025)
- ML12160A085 + (06:44:43, 12 January 2025)
- ML12160A073 + (06:44:44, 12 January 2025)
- 05000254/LER-2012-002, For Quad Cities, Unit 1, Regarding Standby Gas Treatment System Loss of Safety Function Due to Loss of Emergency Power + (06:44:47, 12 January 2025)
- ML12160A069 + (06:44:48, 12 January 2025)
- ML12160A070 + (06:44:48, 12 January 2025)
- ML12160A068 + (06:44:49, 12 January 2025)
- ML12160A067 + (06:44:50, 12 January 2025)
- 05000335/LER-2012-003, For St. Lucie, Unit 1, Regarding Manual Trip During Steam Bypass Control System Post-Modification Testing + (06:44:53, 12 January 2025)
- ML12160A065 + (06:44:54, 12 January 2025)
- ML12160A064 + (06:44:54, 12 January 2025)
- WO 12-0047, Request for Interpretation of Technical Specification 3.4.12, Low Temperature Overpressure Protection (LTOP) System + (06:44:55, 12 January 2025)
- ML12160A063 + (06:44:55, 12 January 2025)
- 05000261/LER-2012-004, For H.B. Robinson Unit 2, Regarding Reactor Tripped Due to a Turbine Trip Caused by a Feedwater Isolation Signal from Steam Generator B High Level + (06:44:58, 12 January 2025)
- 05000250/LER-2012-001, For Turkey Point Unit 3, Regarding Containment Concrete Thickness at Spalled Patch Does Not Meet Technical Specification Design Value + (06:45:01, 12 January 2025)
- ML12160A049 + (06:45:01, 12 January 2025)
- ML12160A016 + (06:45:02, 12 January 2025)
- ML121600585 + (06:45:07, 12 January 2025)