Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- NL-14-032, Supplemental Information to Proposed Changes to Indian Point 2 Technical Specifications Regarding Reactor Vessel Heatup and Cooldown Curves and Low Temperature Over Pressure Requirements Indian Point Unit Number 2 + (03:48:27, 11 January 2025)
- ML14069A307 + (03:48:27, 11 January 2025)
- 05000272/LER-2014-001, Regarding High Energy Line Break Door Blocked Open During Maintenance Activity + (03:48:29, 11 January 2025)
- IR 05000305/2013011 + (03:49:01, 11 January 2025)
- ML14069A184 + (03:49:01, 11 January 2025)
- ML14069A181 + (03:49:02, 11 January 2025)
- ML14069A180 + (03:49:03, 11 January 2025)
- CP-201400231, Supplement to License Amendment Request 13-002 Revision to Application to Revise Technical Specifications to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection, Using Consolidated Line + (03:49:04, 11 January 2025)
- 05000499/LER-2013-004, South Texes Project, Unit 2 Regarding Manual Actuation of Main Steam Isolation Valves That Was Not Part of a Preplanned Sequence During Testing or Reactor Operation + (03:49:10, 11 January 2025)
- ML14069A173 + (03:49:10, 11 January 2025)
- LG-14-031, Special Report - Seismic Monitoring Instrumentation Inoperability Channel XE-VA- 102 + (03:49:11, 11 January 2025)
- ML14069A169 + (03:49:13, 11 January 2025)
- ML14069A167 + (03:49:13, 11 January 2025)
- ML14069A165 + (03:49:14, 11 January 2025)
- RNP-RA/14-0011, Revision to Response to Recommendation 2.3 Seismic Walkdown of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident + (03:49:15, 11 January 2025)
- ML14069A130 + (03:49:16, 11 January 2025)
- L-2014-053, Enclosure 2 - Procedure C-200, Rev. 41, Offsite Dose Calculation Manual (Odcm) + (03:49:17, 11 January 2025)
- ML14069A121 + (03:49:20, 11 January 2025)
- GNRO-2014/00024, Response to Request for Additional Information Regarding Maximum Extended Load Line Limit Plus Amendment Request, Dated 2/6/2014 + (03:49:21, 11 January 2025)
- ML14069A091 + (03:49:21, 11 January 2025)
- RBG-47439, Withdrawal of Request for NRC Assistance for River Bend Station, Unit 1 + (03:49:25, 11 January 2025)
- ML14069A090 + (03:49:25, 11 January 2025)
- L-2014-024, Response to Request for Additional Information on License Renewal (Lr) Reactor Vessel Internals (Rvi) Inspection Program + (03:49:26, 11 January 2025)
- L-2014-034, Response to Request for Additional Information Regarding Steam Generator Tube Inspection Report + (03:49:27, 11 January 2025)
- L-2014-037, Emergency Core Cooling Systems in Light Water Nuclear Power Reactors - 30 Day Special Report + (03:49:27, 11 January 2025)
- L-2014-040, Letter Regarding Inservice Testing Program-Extension of Interval for Turkey Point, Units 3 and 4 + (03:49:28, 11 January 2025)
- L-2014-045, 2013 Annual Report of Reactor Coolant Specific Activity Limits for Turkey Point Units 3 and 4 in Docket Nos. 50-250 and 50-251 + (03:49:29, 11 January 2025)
- ML14069A080 + (03:49:29, 11 January 2025)
- GO2-14-030, Northwests Second Six-Month Status Update Report for the Implementation of NRC Order EA-12-051 Reliable Spent Fuel Pool Instrumentation + (03:49:30, 11 January 2025)
- Press Release-III-14-007, NRC Schedules Public Meeting March 18 to Discuss Performance of Perry Nuclear Power Plant + (03:49:36, 11 January 2025)
- ML14069A071 + (03:49:36, 11 January 2025)
- ML14069A060 + (03:49:37, 11 January 2025)
- NL-14-0326, Units 1 and 2, Recommendation 2.1 Flood Hazard Reevaluation Report, Requested by NRC Letter Dated March 12, 2012 + (03:49:38, 11 January 2025)
- IR 05000482/2014405 + (03:49:39, 11 January 2025)
- L-PI-14-020, Enclosure 3 - Prairie Island Nuclear Generating Plant, Unit 2 - NTTF Recommendation 2.3 - Seismic Updated Seismic Walkdown Report (Redacted) + (03:49:40, 11 January 2025)
- ML14069A027 + (03:49:40, 11 January 2025)
- ML14069A019 + (03:49:41, 11 January 2025)
- ML14069A015 + (03:49:42, 11 January 2025)
- ML14069A014 + (03:49:43, 11 January 2025)
- ML14069A013 + (03:49:44, 11 January 2025)
- ML14069A012 + (03:49:45, 11 January 2025)
- ML14069A011 + (03:49:45, 11 January 2025)
- ML14069A010 + (03:49:46, 11 January 2025)
- ML14069A009 + (03:49:47, 11 January 2025)
- ML14069A005 + (03:49:48, 11 January 2025)
- PNP 2014-030, Second Supplemental Response to Request for Additional Information Dated February 26, 2014, for Relief Request Number RR 4-18 - Proposed Alternative, Use of Alternate ASME Code Case N-770-1 Baseline Examination + (03:49:48, 11 January 2025)
- ML14069A002 + (03:49:49, 11 January 2025)
- PMNS20140467, Notice of Forthcoming Category 3 Public Meeting to Discuss the Draft Supplement 51 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants (NUREG-1437) for Callaway, Unit 1, Issued in February 2014 + (03:49:49, 11 January 2025)
- PMNS20140482, Meeting Notice with Public to Discuss Licensee the 2013 Annual Assessment Results for Perry Nuclear Power Plant + (03:49:51, 11 January 2025)
- BW140017, Clarification of Licensing Basis Assumptions for a Natural Circulation Cooldown Event + (03:49:54, 11 January 2025)
- ML14066A459 + (03:49:56, 11 January 2025)
- ML14066A473 + (03:49:56, 11 January 2025)