Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000324/LER-1982-080, Forwards LER 82-080/01T-0 +
- 05000316/LER-1982-080, Forwards LER 82-080/03L-0 +
- 05000361/LER-1982-080, Forwards LER 82-080/03L-0.Detailed Event Analysis Submitted +
- 05000366/LER-1982-080, Forwards LER 82-080/03L-0 +
- 05000321/LER-1982-080, Forwards LER 82-080/01T-0 +
- 05000311/LER-1982-080, Forwards LER 82-080/01T-0.Detailed Event Analysis Encl +
- 05000325/LER-1982-080, Forwards LER 82-080/03L-0 +
- 05000321/LER-1978-080, Forwards LER 78-080/03L-0 +
- 05000339/LER-1982-080, Forwards LER 82-080/03L-0 +
- 05000338/LER-1982-080, Forwards LER 82-080/03L-0 +
- 05000369/LER-1982-080, Forwards LER 82-080/03L-0 +
- 05000315/LER-1982-080, Forwards LER 82-080/01T-0 +
- 05000272/LER-1982-080, Forwards LER 82-080/03L-0.Detailed Event Analysis Encl +
- 05000237/LER-1983-080, Supplemental LER 83-080/03X-1:on 831124,offgas Log Rad Monitor 2-1705-A Delivered Offgas High Alarm & High Alarm Spiked & Drifted Downscale.Caused by Burned Out Resistor. Power Supply Installed & Monitor Calibr +
- 05000387/LER-1982-080, Forwards LER 82-080/03L-0 +
- 05000331/LER-1982-080, Forwards Updated LER 82-080/03X-1 +
- 05000327/LER-1982-080, Forwards LER 82-080/01T-0 +
- 05000424/LER-1987-080, :on 870920,failed to Locate Evidence Documenting Completion of Tech Spec Table 4.7-1 Surveillance.Caused by Personnel Error & Failure to Follow Procedure 30025-C +
- 05000354/LER-1986-080, :on 861018,full Reactor Scram Occurred from Valid Reactor Vessel Low Water Level 3 Signal.Caused by Loss of RFP Flow Due to Incorrect Field Installation of Test Jack Leads.Leads Reinstalled +
- 05000440/LER-1986-080, :on 861108 & 26,during Local Leak Rate Test Surveillances,Total Combined Allowable Primary Containment &/Or Secondary Containment Bypass Leakage Rates Exceeded Tech Spec 3.6.1.2.Caused by Failed Seats & Resilient Seal +
- 05000366/LER-1978-080-03, /03L-0 on 781210:w/reactor in Run Mode,During Weekly Calibr Check HNP-2-3604,2N62-N009B Was Found Inoper, Due to Bad Hydrogen Sensor +
- 05000366/LER-1978-080, Forwards LER 78-080/03L-0 +
- 05000528/LER-1985-080, :on 851220,reactor Tripped on High Pressurizer Pressure.Caused by out-of-tolerance Setpoint in Turbine Demand Runback Module.Module Setpoint Reset & Procedures Changed Re Observing Proper Caution +
- 05000482/LER-1985-080, :on 851119,violation of Tech Spec 3.7.10.1 Was Discovered Due to Failure to Periodically Check Valve Position in Fire Suppression Water Sys.Caused by Personnel Oversight.Procedures Revised +
- 05000341/LER-1985-080, :on 851128,operator Failed to Place Radiation Monitor in Svc While Releasing Liquid Effluent.Caused by Operator Error & Supervisor Failure to Follow Procedures. Staff Counseled.Standing Order Issued +
- 05000454/LER-1985-080, :on 850806,determined That Tech Spec Surveillance 1BOS 3.1.1-2 Did Not Account for Feedwater Tempering Line Flow.Caused by Omission from Operating Calometric Procedure.Procedure Changed +
- 05000316/LER-1983-080-03, /03L-0:on 830817,during A/B Diesel Generator Operability Test,Generator Would Not Trip.Caused by Open Solenoid Valve Coil.Coil Replaced +
- 05000361/LER-1984-080, :on 841219,when Power Interrupted to Associated Ac Bus During Functional Testing of Battery Charger 2B001, Both Containment Purge Isolation Sys & Fuel Handling Isolation Sys Train a Actuated +
- 05000373/LER-1984-080-01, :on 841120,seismic Analysis of Gould Batteries Declared Invalid Due to Excessive Gaps Between Cells & Battery Racks.Cause Not Stated.Fire Retardant Plywood Used to Reduce Gaps +
- 05000374/LER-1984-080, :on 841121,vacuum Breaker 2PC001A Tripped & Containment Venting Occurred.Caused by Primary Containment Chiller Trip.Pressure Equalized & Breaker Closed +
- 05000397/LER-1984-080, :on 840801,turbine Stop Valve Closure Reactor Trip Occurred as Result of Pressurizing Turbine first-stage Shell Above 30% Power.Plant Recovered Per Operating Procedure PPM 3.3.1 +
- 05000339/LER-1983-080-03, /03L-0:on 831221,individual Rod Position Indicator for Rod C-09 Deviated from Group Demand Position by Greater than 12 Steps.Caused by Instrument Drift.Channel Properly Recalibr & Returned to Svc +
- 05000277/LER-1976-080-03, /03L:on 761118,outboard MSIV Failed to Close During Surveillance Testing Due to Backseat Deformation. Caused by Valve Stem Gauging & Preventing Free Valve Movement.Valve Repaired & Tested Satisfactorily +
- 05000369/LER-1983-080-03, /03L-0:on 830909,during Performance of Periodic Ice Condenser Intermediate Desk Door & Monitoring Sys Insp, Two Intermediate Deck Doors Discovered Frozen Shut.Caused by Unusual Svc Conditions +
- 05000237/LER-1983-080-03, /03L-0:on 831124,offgas Log Radiation Monitor 2-1705-A Delivered Offgas hi-hi Alarm & Hi Alarm,Spiked & Drifted Downscale.Caused by Offgas Monitor Power Supply Failure.Root Cause Unknown +
- 05000338/LER-1983-080-03, /03L-0:on 831118,following Rampdown & trip,I-131 Dose Equivalent Specific Activity Exceeded Tech Spec Limits. Caused by Minor Fuel Element Defects in Reactor Core.No Corrective Action Required +
- 05000348/LER-1983-080-03, /03L-0:on 831125,spent Fuel Storage Area Radiation Monitor R-5 Declared Inoperable Due to Erroneous Indication. Caused by Loose Connection.Connection Repaired +
- 05000362/LER-1983-080-03, /03L-0:on 831012,during RCS Water Inventory Balance,Min Temp Dropped Below Tech Spec Min.Caused by Operator Delay in Diluting RCS to Compensate for Xenon Buildup.Min Temp Specs Being Reviewed +
- 05000324/LER-1983-080-03, /03L-0:on 830831,following Scram,While Utilizing HPCI Sys as Heat Sink for Reactor,Suppression Pool Water Level Exceeded Tech Specs.Caused by HPCI Pump Min Flow Valve Failing in Open Position.Valve Closed +
- 05000366/LER-1983-080-03, /03L-0:on 830928,following Manual Scram,Standby Gas Treatment Fan 2A Did Not Auto Start & Certain Group II & V Inboard Isolation Valves Did Not Auto Close.Caused by Defective Relay.Relay Replaced +
- 05000370/LER-1983-080-03, /03L-0:on 831122,during Investigation of High Sump Level Alarm,Rcs Valve 2NC-56B Found Leaking Between Body & Diaphragm.Caused by Loosened Valve Bonnet.Valve Diassembled & Valve Diaphragm Replaced +
- 05000387/LER-1982-080-03, /03L-0:on 821226,surveillance Per Tech Spec 4.2.2 Could Not Be Performed within Time Limits.Caused by Failure of Nuclear Steam Sys Processor Due to Interaction Between Transversing in-core Probe Switch Position & Processor +
- 05000321/LER-1983-080-03, /03L-0:on 830819,main Steam Line Radiation Monitor D (1D11-K603D) Determined Fluctuating & Drifted Downscale on 830821.Caused by Shorted Connector on Monitor Power Input Cable.Cable Replaced +
- 05000331/LER-1982-080-03, River Water Supply Sys Traveling Screen Wash Pump 1P-112B Found W/Discharge Head Below Tech Spec Requirement for Traveling Screen 1F-36B. Caused by Unaligned Pump & Motor.Pump/Motor Realigned +
- 05000315/LER-1983-080-03, /03L-0:on 830809,spent Fuel Storage Pool Exhaust Ventilation Sys Removed from Svc to Repair Bound Common Rollomatic Roughing Filter.Caused by Loose Screws on Sprockets.Screws Tightened & Filter Element Replaced +
- 05000373/LER-1983-080-03, /03L-0:on 830707,LPCS Water Leg Pump & Discharge Pressure Low Alarm Tripped.Caused by Frozen Pump W/Outboard Bearing Locked on Pump.Shaft,Bearings,Oil Seals & Mechanical Seal Replaced +
- 05000361/LER-1983-080-03, /03L-0:on 830712,reactor Coolant Boronmeter Taken Out of Svc to Repair Leaks & for Routine Calibr.Caused by Worn Gaskets Between Connection Flange & Flange Between Flow Indicator & Adjacent Check Valve MU-098 +
- 05000395/LER-1983-080-03, /03L-0:during Steam Generator Mod Outage of Mar to May 1983,surveillance of Certain Fire Doors Not Performed. Caused by Personnel Error.Plant Logs Revised +
- 05000387/LER-1983-080-03, /03L-0:on 830513,setpoint for PDIS-E-11-INO19B (Shutdown Cooling High Flow) Found Out of Tolerance.Caused by Setpoint Drift.Switch Recalibr & Returned to Svc +
- 05000339/LER-1982-080-03, /03L-0:on 821206,during Mode 1,individual RPI for Rod H-02 in Control Bank D Deviated from Group Demand Position by Greater than 12 Steps W/No Rod Motion.Caused by Instrument Drift.Rpi Channel Recalibr & Returned to Svc +