Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000316/LER-1982-059, Forwards LER 82-059/03L-0 +
- 05000366/LER-1982-059, Forwards LER 82-059/03L-0 +
- 05000321/LER-1982-059, Forwards LER 82-059/03L-0 +
- 05000325/LER-1982-059, Forwards LER 82-059/03L-0 +
- 05000327/LER-1982-059, Forwards LER 82-059/03L-0 +
- 05000324/LER-1982-059, Forwards LER 82-059/03L-0 +
- 05000302/LER-1982-059, Forwards LER 82-059/03L-0 +
- 05000339/LER-1982-059, Forwards LER 82-059/03L-0 +
- 05000338/LER-1982-059, Forwards LER 82-059/03L-0 +
- 05000387/LER-1982-059, Forwards LER 82-059/03L-0 +
- 05000237/LER-1981-059, Forwards LER 81-059/03L-0 +
- 05000331/LER-1982-059, Forwards LER 82-059/03L-0 +
- 05000318/LER-1980-059, Forwards LER 80-059/03L-0 +
- 05000311/LER-1982-059, Forwards LER 82-059/03L-0.Detailed Event Analysis Encl +
- 05000302/LER-1978-059, Forwards LER 78-059/03L-0 +
- 05000369/LER-1982-059, Forwards LER 82-059/03L-0 +
- 05000237/LER-1982-059, Forwards LER 82-059/03L-0 +
- 05000317/LER-1982-059, Forwards LER 82-059/03L-0 +
- 05000333/LER-1982-059, Forwards LER 82-059/03L-0 +
- 05000335/LER-1982-059, Forwards LER 82-059/03L-0 +
- 05000416/LER-1983-059, Forwards LER 83-059/03L-0 +
- 05000387/LER-1983-059, Forwards LER 83-059/03L-0 +
- 05000456/LER-1987-059, :on 870905,surveillance Missed Due to Lost Data Sheet.Caused by Disassembly of Daily Operating Surveillance Package for Data Collection.Search for Sheet Conducted & Surveillance Restructured +
- 05000352/LER-1987-059, :on 871023,reactor Encl Isolated on Low Differential Pressure During Application of Blocking Permit. Caused by Failed Check Valve on Instrument Air Compressor/ Dryer Train A.Failed Valve Replaced +
- 05000424/LER-1987-059, :on 871013,channel Checks Discovered Not Performed within Allowable Time Interval for Three Valves. Caused by Inadequate Procedure.Surveillance Procedure Revised to Include Channel Check for Valves +
- 05000461/LER-1987-059, :on 871002,RCIC Steam Supply Inboard Containment Isolation Valve Actuated.Caused by Technician Not Verifying Jumper Connector Configuration After Installation of Cable.Technician Counseled +
- 05000327/LER-1987-059, :on 870831,alpha Contamination Checks for Two Sealed Sources Not Performed.Caused by Inadequate Accountability for Surveillance Requirements.Sources Checked & Surveyed for Contamination +
- 05000440/LER-1987-059, :on 870821,RWCU Containment Isolation Occurred Due to Indicated High Differential Flow.Caused by Particulate Buildup in Flow Control Valve Positioner Air Flow Restriction Orifice +
- 05000482/LER-1986-059, :on 861019,containment Atmosphere Radiation Monitors Placed in Bypass for Filter Replacement While Purge Valves Open,In Violation of Tech Spec 3.3.3.1.Caused by Personnel Error.Personnel Instructed +
- 05000423/LER-1986-059, :on 861227,plant Equipment Operator Discovered Three Unsealed Penetrations in Auxiliary Bldg Wall.Caused by Failure to Identify Items During as-built Walkdown.Visual Exam Conducted of All Wall Areas +
- 05000327/LER-1986-059, :on 861231,eight Fire Dampers in Diesel Generator Bldg Identified as Not Being Verified Functional by Visual Insp Every 18 Months.Caused by Personnel Error. Surveillance Instruction SI-233.3 Changed +
- 05000354/LER-1986-059, :on 860814,inadvertent Actuation of Channel B ESF Logic & Channel B1 Scram Logic Occurred While Plant in Operational Condition 1.Cause Unidentified.Loca Logic Channels Will Be Monitored +
- 05000498/LER-1988-059, :on 881006,operator Started Train C of High Head Safety Injection Pump Instead of Train C of Low Head Safety Injection Pump.Caused by Personnel Error.Operations Personnel Briefed +
- 05000413/LER-1985-059, :on 851010-12,reactor Shut Down Due to RCS Leakage in Excess of 1 Gpm.Caused by Leaking Compression Tube Fitting on Flow Transmitter.Fitting Tightened +
- 05000325/LER-1985-059, :on 851102,reactor Scrammed Due to Primary Containment Group 1 Isolation,Rcic Trip & Trip/Lockout of Diesel Generator 4.Personnel Disciplined & Followup Meetings W/Shift Personnel Held +
- 05000316/LER-1978-059, Forwards LER 78-059/03L-1 and 78-060/03L-0 +
- 05000316/LER-1978-059-03, /03L-1 on 780806:reactor Pwr Increased Above Admin Level of 91% & Tech Spec 4.2.6.1 Limit of 94% W/O Determining Axial Pwr Dist Factor Fz. Caused by Personnel Error. (Encl to 78809190234) +
- 05000482/LER-1987-059, :on 871223,determined That Auxiliary Bldg Filtration Unit Room B Door Found Unacceptable for 3 H Fire Rated Barrier.Caused by Door Improperly Ul Labelled as 3 H Fire Protection.Fire Watches Established +
- 05000324/LER-1978-059-03, /03L-0 on 780904:RCIC Isolation Channel a Tripped Momentarily,Causing RCIC Sys to Be Inoper,Due to Defective RX-2 Relay +
- 05000397/LER-1985-059, :on 851113,scram Occurred Due to Failure of Power to Control Reactor Feedwater Sys Reactor Pressure Vessel Level Instrument Channel.Caused by Failed Critical Instrument Power Inverter.Study Underway +
- 05000315/LER-1985-059, :on 851104,automatic ESF Actuation Occurred, Resulting in Reactor Trip Signal Due to Erroneous High Source Range Neutron Flux Indication.Caused by Personnel Error.Technician Counseled +
- 05000361/LER-1985-059, :on 851211,Toxic Gas Isolation Sys Train a Spuriously Actuated During Troubleshooting of Ammonia Analyzer After Analyzer Failed Low.Probably Caused by Loose Power Supply Fuse Holder +
- 05000528/LER-1985-059, :on 850811,12,24,29 & 0904,unlocked Fire Doors Discovered.Caused by Failure to Implement Surveillance Procedures.Locked & Unlocked Fire Doors Included in Surveillance +
- 05000373/LER-1985-059-01, :on 850807,spurious Actuation of Control Room B Ventilation/Auxiliary Electric Equipment Room Ventilation Sys Chlorine Detector OAE-VCO91B Occurred.Cause Not Determined.Chlorine Detector Reset +
- 05000482/LER-1985-059, :on 850802,Tech Spec Violation Occurred When Two Rooms in Auxiliary Bldg Not Inspected for Evidence of Fire.Caused by Personnel Error.Personnel Instructed & Fire Watch Reestablished +
- 05000341/LER-1985-059, :on 850903,Group 1 Isolation Initiated High Pressure Trip.Caused by Exceeding Condenser High Pressure Setpoint During Sensing Line Refill.Condenser Pressure Instruments Recalib.Lines Will Be Monitored +
- 05000352/LER-1985-059, :on 850616,ESF Actuation Occurred,Resulting in Isolation of Control Room Ventilation Sys.Caused by Broken Sample Tape in Control Room D Chlorine Detector.Tape Repaired.Isolation Reset +
- 05000454/LER-1985-059, :on 850517,hourly Fire Watch Delayed When Two Fire Patrols Combined to Perform Dual Verification of Security Doors.Caused by Security Computer Failure. Self-locking Security Doors Installed +
- 05000416/LER-1984-059, :on 841221,reactor Water Cleanup Isolation Occurred Due to Read/Set Toggle Switches a & B of Temp Monitor Being in Read Position.Caused by Malfunctioning Switch.Switch Will Be Repaired +
- 05000483/LER-1984-059, :on 841105 & 06,reactor Tripped & ESF Actuated Due to Failure of Air Lines Supplying Steam Generator Feedwater Regulating Valves.Caused by Improper Matl Applications & Fatigue Cracking on Air Lines +