Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000369/LER-1982-044-03, /03L-0:on 820526,HEPA & Carbon Adsorber Filters Periodic Test Revealed That Auxiliary Bldg Ventilation Sys Filters Failed to Pass Total DOP Penetration Test.Caused by Vibration +
- 05000316/LER-1982-044-03, /03L-0:on 820512,during Surveillance Testing,Loss of Bistable FB-445A Setpoint for Loop 4 Reactor Coolant Detected.Caused by Instrument Setpoint Drift.Model 63U-AC-OHAAF Replaced,Calibr & Returned to Svc +
- 05000338/LER-1982-044, Forwards LER 82-044/03L-0 +
- 05000311/LER-1982-044, Forwards LER 82-044/03L-0.Detailed Event Analysis Encl +
- 05000324/LER-1982-044, Forwards LER 82-044/03L-0 +
- 05000366/LER-1982-044, Forwards LER 82-044/03L-0 +
- 05000335/LER-1982-044, Forwards LER 82-044/03L-0 +
- 05000317/LER-1982-044, Forwards LER 82-044/03L-0 +
- 05000346/LER-1982-044, Forwards LER 82-044/03L-0 +
- 05000219/LER-1982-044, Forwards LER 82-044/01T-0.Detailed Event Analysis Encl +
- 05000339/LER-1982-044, Forwards LER 82-044/03L-0 +
- 05000373/LER-1982-044, Forwards LER 82-044/03L-0 +
- 05000259/LER-1982-044, Forwards LER 82-044/03L-0 +
- 05000317/LER-1978-044, Forwards LER 78-044/03L-0 +
- 05000331/LER-1982-044, Forwards LER 82-044/03L-0 +
- 05000368/LER-1982-044, Forwards LER 82-044/03L-0 +
- 05000395/LER-1982-044, Forwards LER 82-044/01T-0.Detailed Event Analysis Encl +
- 05000237/LER-1982-044, Forwards LER 82-044/03L-0 +
- 05000387/LER-1982-044, Forwards LER 82-044/03L-0 +
- 05000247/LER-1982-044, Forwards LER 82-044/03L-0 +
- 05000249/LER-1982-044, Forwards LER 82-044/03L-0 +
- 05000318/LER-1982-044, Forwards LER 82-044/03L-0 +
- 05000333/LER-1982-044, Forwards LER 82-044/03L-0 +
- 05000334/LER-1982-044, Forwards LER 82-044/03L-0 +
- 05000293/LER-1982-044, Forwards LER 82-044/03L-0 +
- 05000220/LER-1983-044, Special Rept of Actions Taken to Assess Current Status of Fire Barrier Penetrations & to Assure Future Integrity of Barriers Following Improper Sealing of One Penetration Reported in LER 83-44 +
- 05000289/LER-1983-044, Forwards LER 83-044/01T-1.Info Potentially Relevant to Plant Design & Procedures Phase of Proceeding.Svc List Encl +
- 05000416/LER-1983-044, Forwards LER 83-044/99X-0 +
- 05000324/LER-1983-044, Forwards LER 83-044/03L-0 +
- 05000321/LER-1983-044, Forwards LER 83-044/03L-0 +
- 05000328/LER-1983-044, Forwards LER 83-044/03L-0 +
- 05000387/LER-1983-044, Forwards LER 83-044/03L-0 +
- 05000267/LER-1982-044, Forwards LER 82-044/03L-0.Detailed Event Analysis Encl +
- 05000336/LER-1982-044, Forwards Updated LER 82-044/03X-1 +
- 05000423/LER-1996-044, Forwards LER 96-044-00,documenting Condition That Was Determined at Millstone Unit 3,on 961108.Commitments,encl +
- 05000312/LER-1980-044, Forwards LER 80-044/01T-0 +
- 05000366/LER-1978-044, Forwards LER 78-044/03L-0 +
- 05000302/LER-1982-044, Forwards LER 82-044/03T-0 +
- 05000352/LER-1989-044, :on 890629,reactor C High Level Monthly Channel Functional Surveillance Test Not Performed within Required Time Interval.Caused by Personnel Error.Surveillance Test Program Personnel Counseled +
- 05000456/LER-1987-044, :on 870808,RHR Valve 1RH8716A Closed for 64 Minutes.Caused by Inadequate Reviews of Tech Specs 3.5.2 & Violation of Procedure Bwop RH-5.Control Switches for Crosstie Valve Tagged W/Caution Cards +
- 05000327/LER-1987-044, :on 870724,determined That Moderate Energy Line Breaks Might Impair Components Required for Safe Shutdown. Caused by Inadequate Analysis of Breaks Due to Inadequate Communication.Bldg Walls Sealed +
- 05000461/LER-1987-044, :on 870730,violation of Plant Tech Spec 4.3.1.1,Table 4.3.1.1-1,Item 2a Occurred.Caused by Personnel Error Resulting from Procedural Deficiency.Procedure Revised to Ensure Thorough Channel Check +
- 05000423/LER-1987-044, :on 871120,surveillance Interval for Channel Calibr of Ventilation Vent Stack Radiation Monitor Exceeded. Caused by Personnel Error.Administrative Procedures Established Re Rescheduling of Surveillances +
- 05000312/LER-1987-044, :on 871110,concern Raised Re Potential Loss of Nuclear Svc Electrical Bldg Essential HVAC During Seismic Event.Caused by Design Error.Isolation Dampers Will Be Changed to normal-open fail-closed Logic +
- 05000219/LER-1987-044, :on 871030,emergency Diesel Generator 2 & Main Station Battery Out of Svc.Caused by Personnel Error. Procedure Revised +
- 05000482/LER-1987-044, :on 870930,discovered That Snubber AE04-R005 Had Not Been Visually Inspected During First Refueling Outage,Per Tech Spec 4.7.8.Caused by Procedural Errors by Nonlicensed Personnel When Revising Procedure +
- 05000354/LER-1987-044, :on 870925,isolation of RHR Sys Occurred During Performance of Instrument & Control Surveillance Test on Reactor Vessel Pressure Transmitter.Caused by Possible Loose Connection on Calibr Card or Wire +
- 05000440/LER-1987-044, :on 870624 & 28,RCIC Sys Automatically Isolated.Caused by Pressure Oscillations in Rcic/Leak Detection High Flow Instrument Process Lines.Leaking Transmitter Test Connection Repaired +
- 05000341/LER-1987-044, :on 870903,discovered That 82 Test,Vent & Drain Connections & 5 Bonnet Taps Not Verified Closed Per Tech Spec.Caused by Inadequate Containment Integrity Surveillance Procedures.Procedures Revised +
- 05000369/LER-1988-044, :on 881211,two Safety Injection Check Valves Failed RCS Pressure Isolation Valve Leak Rate Test.Caused by Worn Hinge Pin Causing Valve Disc to Seat Improperly & Worn Areas on Valve Seat.Valves Replaced +