Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Information Notice 2015-07, Temporary Suspension of e-QIP System to Affect Pending Background Investigations + (2,015)
- Information Notice 2015-09, Mechanical Dynamic Restraint (Snubber) Lubricant Degradation Not Identified Due to Insufficient Service Life Monitoring + (2,015)
- RIS 2015-07, Withdrawn NRC Regulatory Issue Summary 2015-07, Process for Scheduling and Allocating Resources in FY2017 for the Review of New Licensing Applications for Large Light Water Reactors and Small Modular Reactors + (2,015)
- RIS 2015-13, Seismic Stability Analysis Methodologies for Spent Fuel Dry Cask Loading Stack-up Configuration + (2,015)
- RIS 2015-09, Implementation of Fingerprinting Requirements for Non-Power Reactors + (2,015)
- RIS 2015-06, Tornado Missile Protection + (2,015)
- Information Notice 2016-13, Uranium Accumulation in Fuel Cycle Facility Ventilation and Scrubber Systems + (2,016)
- Information Notice 2016-12, Regarding Potential Absence of Required Lock Washers in Bsi Instruments, Inc. LB 7400 Series Fixed Gauges + (2,016)
- Information Notice 2016-11, Potential For Material Handling Events To Cause Internal Flooding + (2,016)
- Information Notice 2016-08, Inadequate Work Practices Resulting in Faulted Circuit Breaker Connection + (2,016)
- Information Notice 2016-09, Recent Issues Identified When Using Reverse Engineering Techniques in the Procurement of Safety-Related Components + (2,016)
- Information Notice 2016-07, Operating Experience Regarding Impacts on Site Electrical Power Distribution From Inadequate Oversight of Contractor Activities + (2,016)
- Information Notice 2016-06, Uranium Hexafluoride Cylinders With Potentially Defective 1-Inch Valves + (2,016)
- Information Notice 2016-03, Revision to the National Institute of Standards and Technology Standard for Radium-223 + (2,016)
- Information Notice 2016-12, Regarding Potential Absence of Required Lock Washers in BSI Instruments, Inc. LB 7400 Series Fixed Gauges + (2,016)
- Information Notice 2016-07, Operating Experience Regarding Impacts on Site Electrical Power Distribution from Inadequate Oversight of Contractor Activities + (2,016)
- Information Notice 2016-06, Uranium Hexafluoride Cylinders with Potentially Defective 1-Inch Valves + (2,016)
- Information Notice 2016-01, Recent Issues Related to the Commercial Grade Dedication of Allen Bradley 700-RTC Relays + (2,016)
- RIS 2016-12, NRC Employee Access to Switchyards at Licensee Facilities + (2,016)
- RIS 2016-09, Withdrawn - NRC Regulatory Issue Summary 2016-09 Preparation and Scheduling of Operator Licensing Examinations + (2,016)
- RIS 2016-08, Process for Scheduling and Allocating Resources in Fiscal Year 2019 for the Review of New Licensing Applications for Light-Water Reactors and Non-Light-Water Reactors + (2,016)
- RIS 2016-04, Clarification of 10 CFR 50.46 Reporting Requirements and Recent Issues Identified with Guidance Not Approved for Use + (2,016)
- RIS 2016-02, Design Basis Issues Related to Tube-To-TubeSheet Joints in Pressurized-Water Reactor Steam Generators + (2,016)
- RIS 2016-06, NRC Regulation of Radium-226 Under Military Control and For Coordination on CERCLA Response Actions at Dod Sites With Radioactive Materials. + (2,016)
- RIS 2016-05, Embedded Digital Devices in Safety-Related Systems + (2,016)
- Information Notice 2016-11, Potential for Material Handling Events to Cause Internal Flooding + (2,016)
- RIS 2016-01, Guidance for the Use of Accreditation in Lieu of Commercial Grade Surveys for Procurement of Laboratory Calibration and Test Services + (2,016)
- RIS 2016-11, September 6, 2019, Summary of Public Meeting Addressing Concerns Re Regulatory Issue Summary (RIS) 2016-11 + (2,016)
- RIS 2016-07, Containment Shell or Liner Moisture Barrier Inspection + (2,016)
- RIS 2016-06, NRC Regulation of Radium-226 Under Military Control and for Coordination on CERCLA Response Actions at Dod Sites with Radioactive Materials + (2,016)
- RIS 2016-03, 10 CFR 50.59 Issues Identified in NRCs San Onofre Steam Generator Tube Degradation Lessons Learned Report + (2,016)
- RIS 2016-10, License Amendment Requests for Changes to Emergency Response Organization Staffing and Augmentation + (2,016)
- Information Notice 2017-05, : Potential Binding of Schneider Electric/Square-D Masterpact Nt and Nw 480-Vac Circuit Breaker Anti-Pump Feature + (2,017)
- Information Notice 2017-06, Battery and Battery Charger Short Circuit Current Contributions to a Fault on the DC Distribution System + (2,017)
- Information Notice 2017-05, Potential Binding of Schneider Electric/Square-D Masterpact Nt and Nw 480-Vac Circuit Breaker Anti-Pump Feature + (2,017)
- Information Notice 2017-03, Anchor/Darling Double Disc Gate Valve Wedge Pin and Stem-Disc Separation Failures + (2,017)
- Information Notice 2017-02, Best Practices Concepts for Patient Release + (2,017)
- Information Notice 2017-05, Potential Binding of Schneider Electric/Square-D Masterpact NT and NW 480-VAC Circuit Breaker Anti-Pump Feature + (2,017)
- Information Notice 2017-05, Potential Binding of Schneider Electric/Square-D Masterpact Nt and Nw 480-VAC Circuit Breaker Anti-Pump Feature + (2,017)
- RIS 2017-05, Administration of 10 CFR Part 72 Certificate of Compliance Corrections and Revisions + (2,017)
- RIS 2017-02, Applicability of Title 10 of the Code of Federal Regulations Part 37 to Non-Manufacturing and Distribution Service Provider Licensees + (2,017)
- RIS 2017-08, Process for Scheduling and Allocating Resources for Fiscal Years 2020 Through 2022 for the Review of New Licensing A0plications for Light-Water Reactors and Non-Light Water Reactors + (2,017)
- RIS 2017-04, Clarification on the Implementation of Compensatory Measures for Protective Strategy Deficiencies or Degraded or Inoperable Security Systems, Equipment, or Components + (2,017)
- RIS 2017-01, Human Reliability and Human Performance Database + (2,017)
- Information Notice 2017-04, High Energy Arc Faults in Electrical Equipment Containing Aluminum Components + (2,017)
- Information Notice 2017-01, Reactor Coolant System Leakage from a Control Rod Drive Threaded Connection + (2,017)
- RIS 2017-03, Preparation and Scheduling of Operator Licensing Examinations + (2,017)
- Information Notice 2018-01, Noble Fission Gas Releases During Spent Fuel Cask Loading Operations + (2,018)
- Information Notice 2018-02, Testing and Operations-Induced Degradation of 3-Stage Target Rock Safety Relief Valves + (2,018)
- Information Notice 2018-03, Operating Experience Regarding Failure to Meet Technical Specifications Requirements for Changing Plant Conditions + (2,018)
- Information Notice 2018-04, Operating Experience Regarding Failure of Operators to Trip the Plant When Experiencing Unstable Conditions + (2,018)
- RIS 2018-02, Preparation and Scheduling of Operator Licensing Examinations + (2,018)
- Information Notice 2018-05, Unanalyzed or Improperly Analyzed Conditions at Fuel Cycle Facilities + (2,018)
- Information Notice 2018-06, Determination of Management Measures for Process Isolation Controls Designated as Items Relied on for Safety and Implementation of Adequate Quality Assurance Measures for Plant Features and Procedures + (2,018)
- RIS 2018-03, National Terrorism Advisory System and Protective Measures for the Physical Protection of Category 1 and Category 2 Quantities of Radioactive Material + (2,018)
- Information Notice 2018-08, Failure to Enter the Required Technical Specifications Action Statement for Operation During Recent Surveillance Testing While Using a Reactor Protection System Test Box + (2,018)
- Information Notice 2018-07, Pump/Turbine Bearing Oil Sight Glass Problems + (2,018)
- Information Notice 2018-10, Thermal Sleeve Flange Wear Leads to Stuck Control Rod at Foreign Nuclear Plant + (2,018)
- Information Notice 2018-09, Electrical Arc Flash Caused by Foreign Material Damages Fire Door + (2,018)
- RIS 2018-05, Supplier Oversight Issues Identified During Recent NRC Vendor Inspections + (2,018)
- RIS 2018-06, Clarification of the Requirements for Reactor Vessel Upper Head Bare Metal Visual Examinations + (2,018)
- Information Notice 2018-11, Kobe Steel Quality Assurance Record Falsification + (2,018)
- RIS 2018-01, Common Violations Cited During First 2 Years of 10 CFR Part 37, Physical Protection of Category 1 and Category 2 Quantities of Radioactive Material, Implementation and Guidance Documents Available to Support + (2,018)
- RIS 2019-01, Analysis of Public Comments on Draft NRC Regulatory Issue Summary 2019-01, Clarification of Export Reporting Requirements for Nuclear Facilities, Equipment, and Non-Nuclear Materials + (2,019)
- Information Notice 2019-01, Inadequate Evaluation of Temporary Alterations + (2,019)