Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Information Notice 2010-12, Intervenors' Fifth Motion to Amend and/or Supplement Proposed Contention No. 5 (Shield Building Cracking). Appendix VI: NRC FOIA Responses (B-51 Through B-53); Turkey Point Event Report; NRC Information Notice 2010-12: Contain +
- Information Notice 2010-12, Intervenors' Fifth Motion to Amend and/or Supplement Proposed Contention No. 5 (Shield Building Cracking). Appendix VI: NRC FOIA Responses (B-51 Through B-53); Turkey Point Event Report; NRC Information Notice 2010-12: Con +
- Information Notice 2010-25, Inadequate Electrical Connections +
- Information Notice 2010-27, Ventilation System Preventive Maintenance and Design Issues +
- Information Notice 2010-23, IN: Malfunctions of Emergency Diesel Generator Speed Switch Circuits +
- Information Notice 2010-21, Crack-Like Indication in the U-bend Region of a Thermally Treated Alloy 600 Steam Generator Tube +
- Information Notice 2010-22, Fuel Assemblies Damaged During Refueling Operations due to Misalignment +
- Information Notice 2010-18, Generic Issue 199, Implications of Updated Probabilistic Seismic Hazard Estimates in Central and Eastern United States on Existing Plants +
- Information Notice 2010-20, Repetitive Failures of Turbine Driven Auxiliary Feedwater Pumps Due To Ineffective Corrective Actions +
- Information Notice 2010-14, Containment Concrete Surface Condition Examination Frequency And Acceptance Criteria +
- Information Notice 2010-17, Common Cause Failure of Boiling-Water Reactor Recirculation Pumps With Variable Speed Drives +
- Information Notice 2010-13, Failure to Verify that Post-Fire-Shutdown Procedures Can Be Performed +
- Information Notice 2010-09, Importance of Understanding Circuit Breaker Control Power Indications +
- Information Notice 2010-11, Potential for Steam Voiding Causing Residual Heat Removal System Inoperability +
- Information Notice 2010-10, Implementation of a Digital Control System Under 10 CFR 50.59 +
- Information Notice 2010-07, Welding Defects in Replacement Steam Generators +
- Information Notice 2010-05, Management of Steam Generator Loose Parts and Automated Eddy Current Data Analysis +
- Information Notice 2010-04, Diesel Generator Voltage Regulation System Component Due To Latent Manufacturing Defect +
- Information Notice 2010-03, Failures of Motor-Operated Valves Due to Degraded Stem Lubricant +
- Information Notice 2010-06, Inadvertent Control Rod Withdrawal Event While Shutdown +
- Information Notice 2010-01, Pipe Support Anchors Installed Improperly +
- Information Notice 2010-02, Construction-Related Experience with Cables, Connectors, and Junction Boxes +
- RIS 2010-10, Withdrawn NRC Regulatory Issue Summary 2010-10 Process For Scheduling Acceptance Reviews Of New Reactor Licensing Applications And Process For Determining Budget Needs For Fiscal Year 2013 +
- Information Notice 2010-23, In: Malfunctions of Emergency Diesel Generator Speed Switch Circuits +
- Information Notice 2010-22, Fuel Assemblies Damaged During Refueling Operations Due to Misalignment +
- RIS 2010-07, Regulatory Requirements For Application of Weld Overlays and Other Mitigation Techniques in Piping Systems Approved for Leak-Before-Break +
- RIS 2010-06, Inservice Inspection And Testing Requirements Of Dynamic Restraints (SNUBBERS) +
- Information Notice 2010-13, Failure to Verify That Post-Fire-Shutdown Procedures Can Be Performed +
- RIS 2010-04, Monitoring the Status of Regulated Activities During a Pandemic +
- RIS 2010-03, Withdrawn NRC Regulatory Issue Summary 2010-03 Licensing Submittal Information for Small and Modular Reactor Designs +
- RIS 2010-02, Enclosulist of Recently Issued Office of Federal and State Materials and Environmental Management Programs Generic Communications +
- RIS 2010-02, The Global Threat Reduction Initiative (GRTI) Federally Funded Voulentary Security Enhancements for High Risk Radiological Material +
- RIS 2010-01, Withdrawn NRC Regulatory Issue Summary 2010-01 - Process for Scheduling Acceptance Reviews of New Reactor Licensing Applications for Fy 2012 +
- RIS 2010-05, Applicability of 10 CFR Part 21 Requirements to Applicants for Standard Design Certifications +
- RIS 2010-10, Withdrawn NRC Regulatory Issue Summary 2010-10 Process for Scheduling Acceptance Reviews of New Reactor Licensing Applications and Process for Determining Budget Needs for Fiscal Year 2013 +
- Information Notice 2010-20, Repetitive Failures of Turbine Driven Auxiliary Feedwater Pumps Due to Ineffective Corrective Actions +
- Information Notice 2010-14, Containment Concrete Surface Condition Examination Frequency and Acceptance Criteria +
- RIS 2010-07, Regulatory Requirements for Application of Weld Overlays and Other Mitigation Techniques in Piping Systems Approved for Leak-Before-Break +
- Information Notice 2010-17, Common Cause Failure of Boiling-Water Reactor Recirculation Pumps with Variable Speed Drives +
- RIS 2010-06, Inservice Inspection and Testing Requirements of Dynamic Restraints (Snubbers) +
- Information Notice 2010-04, Diesel Generator Voltage Regulation System Component Due to Latent Manufacturing Defect +
- Information Notice 2010-26, 2010/12/21-NRC Staff'S Objection to Nec'S Notification of Information Notice 2010-26 +
- Information Notice 2010-12, Intervenors' Fifth Motion to Amend And/Or Supplement Proposed Contention No. 5 (Shield Building Cracking). Appendix VI: NRC FOIA Responses (B-51 Through B-53); Turkey Point Event Report; NRC Information Notic +
- Information Notice 2010-26, New England Coalition'S Motion for Leave to Reply to NRC Staff'S Objection to Nec'S Notification of Information Notice 2010-26 and Entergy'S Response to the Supplement to Nec'S Petition for Commission Review +
- Information Notice 2010-12, Intervenors Fifth Motion to Amend And/Or Supplement Proposed Contention No. 5 (Shield Building Cracking). Appendix VI: NRC FOIA Responses (B-51 Through B-53); Turkey Point Event Report; NRC Information Notice +
- Information Notice 2010-26, New England Coalitions Motion for Leave to Reply to NRC Staffs Objection to NECs Notification of Information Notice 2010-26 and Entergys Response to the Supplement to NECs Petition for Commission Review of LB +
- Information Notice 2010-24, Notice of Possible Source Leakage During Non-Routine Maintenance on a Gammacell 40 Irradiator +
- Information Notice 2010-19, Updated Probabilistic Seismic Hazard Estimates in Central and Eastern United States +
- Information Notice 2010-12, Containment Liner Corrosion +
- Information Notice 2010-16, Failure to Disable Unsafe Geometry Bandsaw Reservoir Results in Criticality Safety-Related Alert +