Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17212A745 +
- ML17212A744 +
- ML20009G069 +
- ML20009A638 +
- ML19350E540 +
- ML20009G216 +
- ML20004E151 +
- ML20004E150 +
- ML20132B167 +
- ML20133D391 +
- ML20126M294 +
- ML20126M182 +
- 05000369/LER-1981-081-03, /03L-0:on 810508,while in Mode 5,control Room Received High Groundwater Alarm.Caused by Localized Temporary High Groundwater Level at 0.25 Ft Above Slab Elevation.Level Checked & Alarm Cleared +
- 05000369/LER-1981-079-03, /03L-0:on 810508,during Fuel Loading,Water Found in Sample Line for Noble Gas Activity Monitor.Caused by Improperly Designed Loop Seal on Sample Line.Monitor Repaired & Mods Being Made to Correct Deficiency +
- 05000369/LER-1981-080-03, /03L-0:on 810508,while in Mode 5,initial Fuel Loading,Both Trains of RHR Sys Were Inoperable.Caused by Failure of Personnel to Prevent Entering of Mode 5 W/O RHR Train B Operable.Operating Procedure Will Be Written +
- FVY-81-114, Advises That 820210 Has Been Established as Date of Emergency Plan Exercise.Scenario Development Will Be Completed 2 Wks Prior to Exercise Date +
- ML20005B345 +
- ML20005B343 +