Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML25268A144 + (June 22, 1978)
- ML25266A219 + (September 23, 2025)
- ML25266A084 + (January 31, 1978)
- ML25262A191 + (September 30, 2025)
- ML25259A309 + (September 30, 2025)
- ML25259A233 + (September 17, 2025)
- ML25238A005 + (September 30, 2025)
- ASLBP 25-991-01-CP-BD01, Notice (Regarding Agency Shutdown) + (October 1, 2025)
- PMNS20251157, Meeting Aalo Atomics - Aalo-1 Design Overview + (October 1, 2025)
- PMNS20251141, Discussion with General Matter About a Potential Topical Report for Uranium Sampling Methods + (October 1, 2025)
- PMNS20251140, Meeting with General Matter to Discuss Integrated Safety Analysis Methodology + (October 1, 2025)
- ML25274A059 + (October 1, 2025)
- RIS 2025-04, Interactions Between the NRC and the NRC Stakeholders During a Lapse of Agency Appropriations + (October 1, 2025)
- ML25267A156 + (October 1, 2025)
- ML24285A043 + (October 1, 2025)
- ML25280A138 + (October 1, 2025)
- ML25275A439 + (October 1, 2025)
- ML25275A436 + (October 1, 2025)
- ML25274A140 + (October 1, 2025)
- RA-25-0237, Subsequent License Renewal Application Supplement 2 + (October 1, 2025)
- ML25274A116 + (October 1, 2025)
- ML25274A117 + (October 1, 2025)
- 05000250/LER-2025-001, Lightning Caused Turbine Control System Failures Resulting in Reactor Trip + (October 1, 2025)
- ML25275A437 + (October 1, 2025)
- ML25275A438 + (October 1, 2025)
- ML25274A124 + (October 1, 2025)
- 05000328/LER-2025-002-01, Manual Reactor Trip Due to a Failed Closed Main Feedwater Regulating Valve + (October 1, 2025)
- ML25274A130 + (October 1, 2025)
- ML25274A126 + (October 1, 2025)
- ML25275A435 + (October 1, 2025)
- ML25274A123 + (October 1, 2025)
- PMNS20251159, Meeting with TRISO-X to Discuss Draft Responses to Structural RAI-7 and RAI-8 + (October 2, 2025)
- NL-25-0351, Generting Plant, Units 1 and 2 and Vogtle Electric Generating Plant, Units 3 and 4 - 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2024 + (October 2, 2025)
- NL-25-0376, Inservice Program Owners Activity Report (OAR-1) for Outage 2R30 + (October 2, 2025)
- 05000280/LER-2025-001, Failed Relay Caused Reactor Trip + (October 2, 2025)
- PNP 2025-069, Report of Changes, Tests and Experiments, and Commitment Change Summary Report + (October 2, 2025)
- ML25275A565 + (October 2, 2025)
- ML25275A038 + (October 2, 2025)
- CNL-25-101, Response to Request for Additional Information Regarding the Watts Bar Nuclear Plant, Unit 1 Steam Generator Tube Inspection Report Cycle 19 + (October 2, 2025)
- ML25275A037 + (October 2, 2025)
- ML25276A031 + (October 2, 2025)
- ML25275A001 + (October 2, 2025)
- ML25275A036 + (October 2, 2025)
- ML25280A013 + (October 3, 2025)
- ML25280A014 + (October 3, 2025)
- ML25279A011 + (October 3, 2025)
- ML25276A288 + (October 3, 2025)
- ML25276A297 + (October 3, 2025)
- ML25276A294 + (October 3, 2025)
- ML25276A293 + (October 3, 2025)
- RS-25-138, Application for Amendment to Renewed Facility License to Revise License Conditions 2.C(13)(b)(1) and 2.C(13)(b)(2) + (October 3, 2025)
- ML25276A027 + (October 3, 2025)
- ML25276A032 + (October 3, 2025)
- ML25276A292 + (September 26, 2025)
- ML25281A106 + (October 4, 2025)
- ML25281A107 + (October 5, 2025)
- ML25272A225 + (October 6, 2025)
- ML25280A238 + (October 6, 2025)
- ML25280A239 + (October 6, 2025)
- ML25280A243 + (October 6, 2025)
- ML25281A117 + (October 6, 2025)
- ML25280A244 + (October 6, 2025)