Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17329A673 +
- ML17329A671 +
- ML17329A672 +
- ML17329A670 +
- ML20116N053 +
- ML20116N015 +
- ML20116M488 +
- ML20116K784 +
- ML20116K620 +
- ML20116K458 +
- ML20116K175 +
- ML20116K129 +
- ML20128A070 +
- ML20128A058 +
- TAC:M76048 +
- TAC:M84443 +
- ST-HL-AE-4261, Forwards Response to NRC 920818 Request for Addl Info Re Review of Proposed Changes to TS Currently Under Review by NRC & NRC Contractor Bnl.Info Covers Development of Riskman Code to Assist in risk-based Evaluation of TS +
- 05000333/LER-1992-027, :on 920516,CS Isolation Testable Check Valve 14A0V-13A Exhibited Seat Leakage in Excess of TS Limit Due to Misalignment by One Bolt Hole.Valve Bonnet Correctly Aligned W/Valve Body +
- 05000338/LER-1992-015-01, :on 921029,determined That SW Isolation Valves Servicing MCR & Emergency Switchgear Room Chiller Condenser Not Verified Per TS 4.7.4.1.(a),due to Personnel Error.Rev to Periodic Tests Will Be Performed +
- ML20127M297 +
- 05000366/LER-1992-020-01, :on 921010,determined That Sealing Devices for 22 Spare Unit 2 Primary Containment Penetrations Did Not Meet ASME Requirements.Caused by Construction Error.Sealing Devices Will Be Replaced to Meet ASME Code +
- 0CAN119206, Part 21 Rept Re Inadequacy of Asea Brown Boveri (ABB) ITE-62L Solid State Relays W/Respect to Electrical Noise Immunity.Subj Relays Installed in Unit 1 RB Cooler Control Circuitry Will Be Replaced During Unit 1 Refueling Outage +
- 05000445/LER-1992-002-01, :on 921012,manual Reactor Trip Due to Feedwater Flow Control Valve Failure.Pressure Regulators in Other Three Unit 1 FCVs & Four Unit 2 FCVs Were Verified to Be 0-125 Psig Regulators,As Required +
- ML20125C016 +
- ML20128B841 +
- ML16154A313 +
- ML20127M307 +
- ST-HL-AE-4253, Responds to NRC Ltr Re Violations Noted in Insp Repts 50-498/92-26 & 50-499/92-26 on 921016.Corrective Actions: Util Will Assemble NRC & Util Reportability Documents & Consolidate Guidance.Ler 92-009-00 for Unit 1 Encl +
- 05000266/LER-1992-009, :on 921012,identified That CCW Sys Surge Tank Vent Valves 1&2cc-00017 Did Not Meet Design Basis.Caused by Oversight During Original Design of CCW Sys.Design Will Be Evaluated & Modified If Necessary +