- ML092230129 +
- 05000301/LER-1981-005-03, /03L-0:on 810625,during Normal Operation, Contractor Accidently Tripped Turbine Overspeed Trip Valve on Auxiliary Feedwater Pump.Valve Reset.Contractors Removed from Area & Reminded to Use Caution +
- CPSES-200300346, Annual Operating Report for 2002 +
- CPSES-200203965, November 2002 Monthly Operating Report for Comanche Peak Steam Electric Station +
- ML022960392 +
- ML20096E075 +
- ML20117B715 +
- ML20153H202 +
- ML20066G620 +
- ML20066C621 +
- 1CAN058401, Monthly Operating Rept for Apr 1984 +
- ML24194A014 +
- ML24012A205 +
- 05000461/LER-1989-026, :on 890621,discovered That Tech Spec Requirements Re Setpoint Verifications for APRM Trip Function Not Fully Met Since Initial Startup.Caused by Deficient Procedure.Mode 1 Checklist Revised +
- 05000352/LER-1987-065, :on 871121,reactor Encl Ventilation Isolation Occurred.Caused by Low Differential Pressure.Isolation Reset & Normal Reactor Encl Ventilation Restored.No Adverse Consequences +
- 05000456/LER-1987-035, :on 870705,reactor Trip from Rod Control Sys Motor Generator Set Trip Occurred.Caused by Miscommunication Between Personnel.Two Resistors,Varistor & Diode Replaced. Use of Procedure Bwop RD-5 Ensured +
- 05000285/LER-1987-008, :on 870321,unplanned Loss of All Ac Power Occurred.Caused by Personnel Error.Caution Signs Hung on Transmitters & Info Sent to Operations & Electrical Maint Personnel Re Precautions +
- 05000286/LER-1986-007-01, :on 860527,during Surveillance Testing W/ Reactor in Hot Shutdown,Inadvertent Safety Injection Actuation Occurred.Caused by Technicians Activating High Steam Flow Portion of Safety Injection Logic +
- 05000155/LER-1988-002, :on 880205,plant Operators Manually Tripped Reactor in Response to Loss of Recirculation Flow.Caused by Personnel Error.Equipment Testing Performed to Insure That No Malfunctions Occurred or Damage Present +
- 05000423/LER-1985-002-01, :on 851215,during post-core Load Testing While in Cold Shutdown,Reactor Tripped from Two 10-10 Level Bistables on Steam Generator C.Caused by Personnel Error +
- 05000339/LER-1993-003-02, :on 930424,manual Reactor Trip Initiated Due to Erratic Feedwater Flow Indications to SG C & Excessive Main Feedwater Regulating Valve Oscillations.Caused by Design Instabilities.Secondary Sys Secured +
- ML20006D728 +
- NUREG-0227, Partial Draft of Nuclear Power Plant Operating Experience - 1978, Section 3.0, Plant Outages. Portions of NUREG-0483, NUREG-0366 & NUREG-0227 (Plant Operating Experience for 1977,1976 & 1974-75,respectively) Encl +
- ML22278A283 +
- 05000346/LER-1979-065-03, /03L-0 on 790609:contact Data Logger Failed, Rendering Fire & Radiation Remote Monitoring Sys Inoperable. Caused by Intermittent Equipment Problem of Undetermined Nature.Computer Program Reloaded;Equipment to Be Phased Out +
- 05000272/LER-1993-005, :on 930218,experienced Reactor Protection Sys Reactor Trip/Turbine Trip Signal,When 12 SG Level Decreased. Caused by Personnel Error.Event Will Be Reviewed for Incorporation in Applicable Training Program +