Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ENS 49942 +
- ML13297A103 +
- ML20111A655 +
- ML20141D865 +
- ML20065T012 +
- ML20244E215 +
- ML20237B471 +
- ML20214E485 +
- ML20214E060 +
- 1CAN038809, Monthly Operating Rept for Feb 1988 +
- ML24194A014 +
- ML24012A205 +
- ML24194A018 +
- ML24012A207 +
- 05000293/LER-1999-010-02, :on 990918,reactor Startup Was in Progress. Caused by Communications Breakdown That Resulted in Operations Personnel Failing to Complete Actions in IAW Procedures.Power Ascension Was Secured.With +
- 05000414/LER-1986-013, :on 860517,reactor Trip Occurred Due to Failure of Reverse Purge Flow Valve.Caused by Reverse Purge Valve Disk Being Separated from Valve Stem & Valve Being Stuck Closed.Reactor Trip Breakers Closed +
- 05000397/LER-1986-040, :on 861125,technicians Failed to Obtain Drywell Samples Every 12 H as Required.Caused by Failure of Personnel to Follow Procedures.Personnel Counseled +
- 05000414/LER-1986-013-01, :on 860517,reactor Tripped During Swapover from Auxiliary to Main Feedwater Nozzles.Caused by Stuck Reverse Purge Isolation Valve Due to Separation of Valve Disc from Valve Stem.Valve Replaced +
- 05000352/LER-1988-016, :on 880507,Channel B Reactor Protection Sys 1/2 Scram & Various Nuclear Steam Supply Shutoff Sys Isolations Occurred.Caused by Overheating of Fuse Due to Inadequate Contact.Fuse Replaced +
- 05000412/LER-1988-001, :on 880105,refueling Water Storage Tank Level Indicators Declared Inoperable When Instruments Failed to lo-lo Position.Caused by Sensing Lines Freezing.Design Changes Implemented +
- 05000311/LER-1985-015, :on 850720,RCS Unidentified Leakage Determined to Be Outside Tech Spec Limits.Caused by Leakage from Packing Glands on Valves 2PR9 & 2PS8.Leaks Terminated by Adjustment of Packing on Valves +
- 05000304/LER-1985-014-08, :on 850718,w/RHR Pump 2B Out of Svc,Diesel Generator 2B Tripped on Overspeed.Caused by Increased Speed Setting by Dialing 50% Droop.Temporary Procedure Change Initiated to Allow for Lower Speed Setting +
- 05000423/LER-1996-001-02, :on 960120,supplementary Leak Collection & Release Sys Declared Inoperable Due to Equipment Failure of Door Latch.Door Repaired & Plant Returned to 100% Power +
- 05000278/LER-1995-003-02, :on 950730,Unit 3 Scram Occurred When a Reactor Feed Pump Speed Increased.Caused by High Reactor Water Level Condition.Reset Appropriate PCIS & RPS Scram Logics +
- 05000293/LER-1995-003, :on 950324,manually Initiated RPS Scram Signal & Scram Occurred.Caused by Deliberate Movement of Reactor Mode Selector Switch from Run Position.Controller & Linkage Being Replaced +
- 05000265/LER-1994-011-06, :on 941006,thirty Day Limited Condition of Operation Exceeded for 2B RHR Swp Due to Inadequate Work Planning & Scheduling.Evaluating Inventory of Major Rhrswp Parts +
- BVY-93-071, Monthly Operating Rept for June 1993 for Vermont Yankee Nuclear Power Station +
- ML20036B253 +
- 05000413/LER-1989-025-02, :on 890922,13.8 Kv Auxiliary Switchgear Deenergized Resulting in Loss of Power to Condenser Circulating Water Cooling Tower Fans.Power Reduction Due to Hurricane Hugo +
- 05000311/LER-1997-013-01, :on 970902,unplanned Entry Into TS 3.0.3 Was Noted Due to Two Inoperable Pressurizer Level Channels. Caused by Error in RCS P&ID Drawing.Pressurizer Channel I Was Restored within Six Minutes of Event +
- ML17056B732 +
- 05000352/LER-1996-006, :on 960207,control Room Emergency Fresh Air Sys Declared Inoperable.Caused by Flow Switch Coordination Deficiency.Flow Switches Adjusted,Station Guidance Revised & Site Staff Training Performed +