Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML060030080 +
- ML050960252 +
- NL-92-012, Rev 1 to Engineering Analysis (EA) EA-A-NL-92-012-02, Offsite Doses and CR Habitability Following Large Break LOCA to Justify Continued Operation Until Cycle 12 +
- ML18058A404 +
- ML20043A602 +
- ML040580690 +
- ML20086G772 +
- ML20154R559 +
- ML20207A204 +
- ML24179A048 +
- ML24032A076 +
- 05000413/LER-1989-007, :on 890127,turbine Driven Auxiliary Feedwater Pump Failed.Caused by Stress Corrosion Cracking at Key Slot of Final Stage Shaft Sleeve.Shaft Replaced & Feedwater Pump Returned to Svc +
- 05000413/LER-1988-009, :on 880206,Limitorque Valve Actuator T-drains Found Painted Over or Missing on 27 Valves.Caused by Lack of Communication & Mgt Deficiency.Painters Will Receive Periodic Retraining.Drains Repaired +
- 05000287/LER-1986-001-04, :on 860131,reactor Tripped Due to High RCS Pressure.Caused by Instantaneous Failure of Amplifier in Feedwater Flow Transmitter A1.Unit Stabilized.Amplifier Replaced +
- 05000272/LER-1983-055-03, /03L-0:on 831110,RCS Unidentified Leakage Exceeded Tech Spec Limit.Caused by Change in Containment Fan Coil Unit Configuration & Speed.Unit Shut Down to Identify & Repair Leaks in Containment +
- 05000413/LER-1990-018, :on 900320,Tech Spec Violation Due to Missed Surveillance Resulting in Pressurizer Porv.Caused by Inappropriate Action.Procedures Revised to Ensure Equipment Operability Meets Tech Spec Requirements +
- ML20034C057 +
- ML20034H587 +
- NUREG-0227, Partial Draft of Nuclear Power Plant Operating Experience - 1978, Section 3.0, Plant Outages. Portions of NUREG-0483, NUREG-0366 & NUREG-0227 (Plant Operating Experience for 1977,1976 & 1974-75,respectively) Encl +
- 05000281/LER-1993-002-03, :on 930620,automatic Trip Occurred Due to Low SG Water Level Coincident W/Steam/Feedwater Flow Mismatch Resulting from Main FW Pump Trip.Cr Operators Promptly Initiated Appropriate EOPs +
- 05000311/LER-1980-017, Forwards LER 80-017/03L-0 +
- IR 05000315/1985029 +
- ML16341F634 +
- BVY-04-108, September 2004 Monthly Operating Report for the Vermont Yankee Nuclear Power Station +