Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML081410299 +
- ML051040234 +
- ML050470301 +
- ENS 45587 +
- ML20050B185 +
- ML20042A434 +
- ML20053C920 +
- ML20084E320 +
- ML20077P181 +
- ML20074A202 +
- ML20137M358 +
- ML20129G167 +
- ML20195J001 +
- ML20065T347 +
- ML23030A400 +
- 05000382/LER-1988-013, :on 880528,fire Protection Sprinkler Found Isolated After Restoration from Testing.Caused by Personnel Error.Procedures Being Revised to Require Contaminated Valve Lineup Sheets Be Photocopied or Verified +
- 05000325/LER-1995-018, :on 950930,reactor Automatically Shutdown Due to Condensate/Fw Transient.North Condensate Conductivity Cell Gasket 1A Replaced & External Visual Insp Performed on Remaining Condensate Sys Conductivity Cells +
- 05000395/LER-1983-042-01, /01T-0:on 830519,steam Leak Activated Smoke Detector,Tripping Open Intermediate Bldg Preaction Sprinkler Sys Deluge Valve.Caused by Personnel Error & Lack of Sys Knowledge.Deluge Valve Reset +
- IR 05000395/1983017 +
- ML20041B332 +
- IR 05000131/1989001 +
- NUREG-0227, Partial Draft of Nuclear Power Plant Operating Experience - 1978, Section 3.0, Plant Outages. Portions of NUREG-0483, NUREG-0366 & NUREG-0227 (Plant Operating Experience for 1977,1976 & 1974-75,respectively) Encl +
- 05000293/LER-2003-004, Regarding HPCI System Declared Inoperable During Surveillance Test Due to Procedure Inadequacy +