Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ENS 42439 +
- 05000260/LER-2010-003, Regarding Reactor Scram Due to Closure of the Main Steam Isolation Valves and Subsequent Invalid RPS Scram from the Intermediate Range Monitoring System +
- ML15282A240 +
- ML17309A427 +
- NL-15-169, Browns Ferry, Units 1, 2, and 3, Startup Test Plan +
- IR 05000272/2004004 +
- ML030770619 +
- ML042080433 +
- ML20085F982 +
- ML20079C136 +
- ML20073A674 +
- ML20100R429 +
- ML20247D145 +
- IR 05000423/1985067 +
- ML24107B149 +
- ML23332A046 +
- 05000220/LER-2021-002, Isolation of Both Emergency Condensers Due to Loss of UPS 162A +
- 05000382/LER-1988-012, :on 880526,steam Generator Blowdown Sampling Exceeded Required Periodicity of Tech Specs 3.3.3.1,Action 28.Caused by Personnel Error.Procedures Being Revised to Verify That Monitor Inservice & Sampling Done +
- 05000338/LER-1985-027, :on 851224,Loop B Delta T Protection Channel 11 Declared Inoperable W/Channel III in Tripped Condition. Caused by Change in Loop B Cold Leg Resistance Temp Detector.Spare Cold Leg Connected +
- 05000341/LER-1985-063, :on 850920,reactor Water Cleanup Sys Isolated on High Differential Flow Signal.Caused by Pump Discharge Flow Transmitter Not Holding Calibr.Transmitter Replaced & Sys Placed in Bypass +
- 05000336/LER-1996-013-01, :on 960314,assessed Wide Range Logarithmic Neutron Flux Monitors Nuclear Instrumentation Channels A,B,C & D as Inoperable Due to Potential Susceptability to Common Mode Failure.Replaced Failed Power Supply +
- NUREG-0227, Partial Draft of Nuclear Power Plant Operating Experience - 1978, Section 3.0, Plant Outages. Portions of NUREG-0483, NUREG-0366 & NUREG-0227 (Plant Operating Experience for 1977,1976 & 1974-75,respectively) Encl +
- 05000272/LER-1994-010, :on 940625,analog Rod Position Indication for Rods 2SA1 & 2SA4 Indicated Step Deviation from Their Group Demand Counters.Caused by Design Manufacturing.Rods Were Calibrated & TS 3.0.3 Exited +
- 05000400/LER-1993-005-02, :on 930428,discoverd That Error Made During Review & Evaluation of Charging/Si Pump (Csip) B Acceptance Test Results.Caused by Personnel Error.Csip B Declared Inoperable +
- 05000440/LER-2010-003, Regarding Loss of Control Rod Drive Header Pressure Results in Manual RPS Actuation +