W4tLF CREEK NUCLEAR OPERATING CORPORATION Otto L. Maynard Vice President Plant Operations September 13, 1994 WO 94-0130 U.
S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-137 Washington, D.
C.
20555
Subject:
Docket No. 50-482: August, 1994, Monthly Operating Report Gentlemen:
Attached is the August, 1994, Monthly Operating Report for Wolf Creek Generating Station.
This submittal is being made in accordance with the requirements of Technical Specification 6.9.1.8.
Very truly yours, O
bdd N Nh87 Otto L. Maynard i
OLM/jad Attachment cc:
L. J. Callan (NRC), w/a D. D.
Chamberlain (NRC), w/a i
D. N. Graves (NRC), w/a W.
D. Reckley (NRC), w/a J. F. Ringwald (NRC), w/a l
1 9409200360 940831 PDR ADDCK 05000487 R
, b _,,b0.' pox 411/ Burlington, KS 66839 / Phone: (316) 364-6831 p
//
An Equal Opportunity Employer MT/HCNET
e i
i i
I i
t i
I k
WOLF CREEK NUCLEAR OPERATING CORPORATION WOLF CREEK GENERATING STATION MONTHLY OPERATING REPORT l
f MONTH:
AUGUST YEAR:
1994 I
Docket No.:
50-482 Facility Operating License No.:
NPF-42 i
Report No.
114 1
i e
i i
i i
t i
l
' l i
1 1
1
^
-y
_, ~,.
,m
.kttadhment1toWO94-0130 i
l t
i s
t I
SUMMARY
The following report highlights the operating experience of Wolf Creek Generating Station for _ the month of August. 1994 This report is being provided pursuant to' Technical r
Specification 6.9.1.8.
I.
SUMMARY
OF OPERATING EXPERIENCE i
I The unit operated at about 100% power from August 1 through August 26.
'On August l
26, at 0341, power was reduced to approximately 93% for main turbine valve testing.
Power remained at approximately 93% for the remainder of August to minimize xenon transients, and to begin coastdown for the upcoming refueling outage.
l t
II.
MAJOR SAFETY RELATED MAINTENANCE ACTIVITIES No major safety related maintenance was performed during the month of August.
F i
[
i I
t
?
i a
i h
i Wolf Creek Generating Station Monthly Operating Report August 1994 Page 1 of 5 l
l
.m f
ttadhtbent l' to WO 94-0130 OPERATING DATA REPORT DOCKET NO. 50-482 WOLF CREEK GENERATING STATION WOLF CREEK NUCLEAR OPERATING CORPORATION I
DATE 09-01-94 TELEPHONE 316-364-8831 OPERATING STATUS i
i 1.
Reporting Period:
August, 1994 Gross Hours in Reportico Period:
744 2.
Currently Authorized Power Level (MWt) :
3565 Max. Depend. Capacity (MWe-Net): 1160 l
Design Electrical Rating (MWe-Net):
1170 t
3.
Power Level to Which Restricted (If Any) (MWe-Net) :
N/A 4.
Reasons for Restriction (If Any): N/A This Month Yr. to Date Cumulative 5.
Number of Hours Reactor was Critical 744.0 5,750.2 64,112.6 6.
Reactor Reserve Shutdown Hours 0.0 0.0 339.8 7
Hours Generator on Line 744.0 5,713.7 63,367.1 8.
Unit Reserve Shutdown Hours 0.0 0.0 0.0 9.
Gross Thermal Energy Generated (MWh) 2,577,875 19,725,651 208,990,061 i
10.
Gross Electrical Energy Generated (MWh) 885,595 6,829,374 72,682,923 11.
Net Electrical Energy Generated (MWh) 850,309 6,558,588 69,404,260 12.
Reactor Service Factor 100.0%
98.6%
81.3%
i 13.
Reactor Availability Factor 100.0%
98.6%
81.8%
14.
Unit Service Factor 100.0%
98.0%
80.4%
15.
Unit Availability Factor 100.0%
98.0%
80.4%
16.
Unit Capacity Factor (Using MDC) 98.5%
98.3%
77.7%
17.
Unit Capacity Factor (Using Design MWe) 97.7%
96.1%
7 0 '> 6 18.
Unit Forced Outage Rate 0.0%
1.0%
5.3%
19.
Shutdowns Scheduled Over Next 6 Months
.ype, Date, and Duration of each):
Refueling outage scheduled to begin September 15, 1994, lasting 58 days i
20.
If Shut Down at End of Report Period, Estimate Date of Startup:
N/A-Wolf Creek Generating Station i
Monthly Operating Report August 1994 Page 2 of 5 8
.ktta$hment1toWO94-0130 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-4E2 WOLF CREEK GENERATING STATION WOLF CREEK NUCLEAR OPERATING CORPORATION DATE 09-01-94 TELEPHONE 316-364-8831 MON 7'H August, 1994 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL i
(MWe-Net)
(MWe-Net) l 1
1162 17 1161 E
2 1161 18 1157 I
[
3 1161 19 1152 4
1155 20 1160 t
i 5
1177 21 1161 6
1162 22 1159 l
7 1163 23 1160 8
1162 24 1159 I
9 1160 25 1150 10 1159 26 1091 e
i i
11 1150 27 1090 j
i 12 1157 28 1085 i
f 13 1159 29 1090 I
i le 1161 30 1090 15 1162 31 1091 i
16 1162 c
r Wolf Creek Generating Station Monthly Operating Report
]
August 1994 Page 3 of 5 j
i l
1
Attachment I to WO 94-0130 UNIT SHUTDOWN AND POWER REDUCTIONS DOCKET NO. 50-492-WOLF CREEK GENERATING. STATION WOLF CREEK NUCLEAR OPERATING CORPORATION DATE 09-01-94 TELEPHONE 316-364-9931 Type METHOD OF SHUTTING F: FORCED DURATION REASON DOWN THE REACTOR CORRECTIVE ACTIONS / COMMENTS No Date S: SCHEDULED (Hours)
(1)
OR REDUCING POWER (2)
SUMMARY
- The unit operated at about 100% power from August 1 through August 26.
On August 26, at 0341, power was reduced to approximately 93% for main turbine valve testing.
Power remained at approximately 93% for the remainder of August to minimize xenon transients, and to begin coastdown for the upcoming refueling outage 1)
REASON: A: EQUIPMENT FAILURE (EXPLAIN)
E: OPERATOR TRAINING AND LICENSE EXAMINATION (2) METHOD:
- 1. MANUAL B: MAINTENANCE OR TEST F: ADMINISTRATIVE
- 2. MANUAL SCRAM C: REFUELING G: OPERATIONAL ERROR (EXPLAIN)
- 3. AUTOMATIC SCRAM D: REGULATORY RESTRICTION H: OTHER (EXPLAIN)
- 4. CONTINUED 5.
REDUCED LOAD 9.
OTHER Wolf Creek Generating Station Monthly Operating Report August 1994 Page 4 of 5
. itt:a'chment i to Wo 94-0130 WOLF CREEK NUCLEAR OPERATING CORPORATION WOLF CREEK GENERATING STATION UNIT NO. 1 MONTH August, 1994
SUMMARY
OF OPERATING EXPERIENCE Listed below in chronological sequence is a summary of operating experiences for ' this month which required load reduction or resulted in significant non-load related incidents.
DATE TIME EVENT August 1, 1994 0000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> Unit at 100% power.
August 26, 1994 0341 hours0.00395 days <br />0.0947 hours <br />5.638227e-4 weeks <br />1.297505e-4 months <br /> Power reduced to 93% for main turbine valve testing and coastdown.
August 31, 1994 2400 hours0.0278 days <br />0.667 hours <br />0.00397 weeks <br />9.132e-4 months <br /> Unit at 93% power.
Wolf Creek Generating Station Monthly Operating Report August, 1994 Page 5 of 5