Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ENS 42904 +
- ML11356A241 +
- ML20010C216 +
- SVP-06-099, Request for Enforcement Discretion Technical Specification 3.1.7, Standby Liquid Control (SLC) System +
- CP-200800244, Transmittal of Annual Operating Report for 2007 +
- NL-04-004, December 2003 Monthly Operating Report for Indian Point, Units 2 and 3 +
- ML20116K233 +
- ML20140E923 +
- ML20137T144 +
- ML20134H485 +
- BECO-89-101, Monthly Operating Rept for June 1989 for Pilgrim Nuclear Power Station +
- ML20084E222 +
- ML20210B049 +
- 05000324/LER-1987-009-02, :on 870817,Group 3 Isolation of Rcwu Sys Inlet Outboard Primary Containment Isolation Valve G31-F004 Occurred.Caused by Sticking read-set Temp Differential Switch.Replacement Switch Ordered +
- 05000461/LER-1987-051, :on 870828,rod Pattern Control Sys,Rod Withdrawal Limiter High Power Setpoint Channel Functional Test Not Performed within 1 Hr Prior to Control Rod Movement in Mode 1.Caused by Personnel Error +
- 05000325/LER-1988-005, :on 880124,limiting Condition for Primary Containment Oxygen Concentration Exceeding Tech Spec 3.0.3 Entered.Caused by Incorrectly Configured Control Switch. Control Switch 1-C11-CS-Z8-S1 Replaced +
- 05000277/LER-1992-009-01, :on 920520,reactor Scram Occurred When Two Turbine CIV Closed Simultaneously Causing Power Trip Signal. Cause Determined to Be Unexpected Closure of Intercept Valve 2.Sys Reset & Returned to Normal +
- 05000352/LER-1990-030-01, :on 901202,actuation of Reactor Protection Sys Occurred During Performance of Surveillance Test Procedure ST-6-001-660-1.Caused by Inadequate Procedure.Procedure Revised +
- 05000416/LER-1984-006, :on 840120,during Drywell High Pressure Channel a Functional Test,Indicator Light Failed to Illuminate.Caused by Failure of Test Procedure to Properly Instruct Technicians.Procedure Being Revised +
- 05000461/LER-1995-001, :on 950105,FW Heater Train Operation During Removal of FW Heater from Svc Was Not Understood & Resulted in Decreased FW Temp,Loss of Heater Level Control & Manual Scram.Plugged 5B FW Heater Tubes +
- 05000338/LER-1989-017-02, :on 891205,reactor Trip Occurred Due to lo-lo Level in B Steam Generator Resulting from Electro Hydraulic Control Sys Pressure Transients.Caused by Leaking Turbine Overspeed Protection Circuitry Valves +
- 05000285/LER-1990-011, :on 900402,inadvertent Actuation of Pressurizer Pressure Low Signal Occurred While Performing Calibr Procedure.Caused by Inappropriate Action by Technician Involved.Validation of Procedures Reviewed +
- 05000254/LER-1990-006-01, :on 900313,tornado Warning for Rock Island County Received on Weather Radio.Station Entered Procedure Qoa 010-10.One Person Substained Minor Injuries & Some Site Damage Sustained.Notification to Be Evaluated +
- IR 05000338/1989035 +
- 05000423/LER-1989-034, :on 891211,partial Train B Containment Depressurization Actuation Signal Generated During Slave Relay Testing.Caused by Personnel Error.Individual Counseled & Testing Procedures Revised +
- 05000369/LER-1981-038, Forwards LER 81-038/03L-0.Detailed Event Analysis Encl +
- ML20042E319 +
- IR 05000339/2024090 +
- 05000280/LER-1987-018, :on 870729,control/relay Room Chiller a Freon Relief Valve Lifted.Chillers B & C Tripped on Listed Dates. Caused by Low Svc Water (SW) Flow Due to Buildup of Seaweed in Upstream SW Strainers.Strainers Cleared +
- 05000311/LER-1980-013, Forwards LER 80-013/03L-0 +
- 05000461/LER-2014-001, Regarding Premature Failure of Air Supply Solenoid Results in Isolation of Fuel Building Ventilation System and Loss of Secondary Containment Differential Pressure +
- 05000423/LER-2013-004, Regarding Failed Surveillance Test of a Train Control Room Emergency Filtration System +
- 05000280/LER-2011-001, Regarding Reactor Trip on Both Units Due to Loss of Offsite Power +
- 05000254/LER-2006-004, For Quad Cities, Unit 1, Regarding Through-wall Leak in Standby Liquid Control Tank Due to the Original Construction Use of Grout with Leachable Halogens +
- ML040200250 +
- 05000461/LER-1987-047, :on 870814,inservice Insp Surveillance Not Performed as Required by Tech Spec 4.0.5.Caused by Personnel Error.Rhr Pump Room Cooling Coil Shutdown Svc Water Outlet Valves Tested & Procedure Revised Temporarily +