Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ENS 41831 +
- ENS 46897 +
- IR 05000280/2006011 +
- ML12334A501 +
- ML11346A536 +
- ML082610715 +
- ML18004B945 +
- ML061980111 +
- ML19332G326 +
- IR 05000346/2002016 +
- ML20086A635 +
- ML20135G249 +
- ML20069A135 +
- IR 05000400/2016004 +
- ST-HL-AE-3951, Special Rept:On 911025,SDG 21 Found to Have Fuel Oil Leak at Injection Pump.Caused by Delivery Valve Holder Design Prone to Cracking.Testing Frequency for Sdg 21 Remains at Once Per 31 Days +
- ST-HL-AE-3928, Special Rept:On 911025,fuel Oil Leak Found at Injection Pump 9L of Standby Diesel Generator 21.Caused by Crack on Threaded Portion of Delivery Valve Holder.Holder Will Be Replaced W/New Cooper-Bessemer Holder by Next Outage +
- 05000346/LER-2021-003, Reactor Trip Due to Failed Uninterruptible Power Supply and Steam Feedwater Rupture Control System Actuations +
- 05000413/LER-1989-008, :on 890305,reactor Trip Occurred Due to Exceeding Overpower Delta T Loop 2 Setpoint.Caused by Personnel Error & Actuator Failure.Work Request Issued & Instrument Isolation Valve Replaced +
- 05000293/LER-1999-008-02, :on 990805,automatic Scram Occurred While at 100% Power Due to Automatic Turbine Trip.Caused by Malfunction of Moisture Separator Drain Tank a Drain Valve Controller.Level Controllers Replaced.With +
- 05000341/LER-1985-075, :on 851023,Div 1 Emergency Equipment Cooling Water & Svc Water Pumps Automatically Started.Caused by Operator Failure to Reset Digital Load Sequencer.Memo Issued to Personnel Re Procedure Requirements +
- 05000333/LER-1996-011-01, :on 961028,both Standby Liquid Control Subsystems Determined Inoperable.Due to Inoperable Pump Discharge Pressure Relief Valves.Slc Sys Pump Discharge Pressure Relief Valve 11SV-39A Was Replaced +
- 05000313/LER-1996-002-03, :on 960308,discovered That Surveillance Tests Required by TS Incomplete Because All Combinations of RPS Channel Trip Relay Contacts Not Tested Due to Procedural Deficiency.Verified Operability of RPS +
- 05000271/LER-1995-009, :on 940720,inadvertent Primary Containment Isolation Sys Actuation Occurred Due to Unexpected Transfer of 120/240 Volt Ac Bus to Alternate Power Source During Lightning Storm.Reset FW Valve Lockups +
- 05000271/LER-1994-009, :on 940720,lightning Strike Resulted in a Transfer of 120/240V Vital AC Bus from Normal Power Source to Alternate Source.Caused by Lightning Strike to Plant. Feedwater Regulator Valve Lockups Were Reset +
- 05000331/LER-1994-010, :on 940710,manual Scram Was Inserted in Response to Impending Loss of EHC Reservior Level.Caused by Crack in 1 EHC Tubing.Repaired Ruptured Tubing & Installed Accumulators on Cvs +
- 05000352/LER-1994-001-02, :on 940114,manual Reactor Scram Initiated Due to Unexpected Failure of Indicating Light Bulb During Reinstallation Into Subj Light Bulb Socket.Administrative Procedure A-41.1 Will Be Revised by 940531 +
- 05000311/LER-1990-001-01, :on 900101,general Area Radiation Monitoring Sys Monitor Spiked Into Alarm Resulting in Second Automatic Switching of Control Room Ventilation.Caused by Design/ Equipment Concerns.Channel Reset +
- 05000219/LER-1989-022, :on 891005,Tech Spec Violation Occurred When Licensed Group Shift Supervisor Left Control Room W/O Informing Operating Supervisor.Caused by Personnel Error. Individual Involved Counseled +
- 05000400/LER-1987-041, :on 870804,restoration Alignment on Clearance for Placing Dryer 1B Back Into Svc Incorrect.Caused by Personnel Error.Valve Lineup for Instrument Air Dryer 1B Put Into Correct Configuration +
- 05000316/LER-1987-008-01, :on 870722,ESF Actuation Occurred Due to Extreme High Level in Steam Generator 24.Caused by Erratic Response of Main Feedwater Pump Delta P Controller. Plant Procedures Implemented +
- 05000454/LER-2012-001, Regarding Unit 2 Loss of Normal Offsite Power and Reactor Trip and Unit 1 Loss of Normal Offsite Power Due to Failure of System Auxiliary Transformer Inverted Insulators +
- 05000425/LER-2011-001, Regarding Inoperable Core Exit Thermocouple Indicator on the B Train Remote Shutdown Panel +
- 05000293/LER-1999-008-01, Regarding Automatic Scram at 100 Percent Power Due to Turbine Trip +
- 05000255/LER-2002-002, Automatic Reactor Trip and Safety System Actuation +
- ML083010185 +
- ML18152A232 +
- ML20031F613 +
- 05000313/LER-1996-002, :on 970519,surveillance Tests Required by TS Were Incomplete Because All Combinations of Contacts Not Tested Due to Procedure Deficiencies.Verified Operability of RPS +