Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17319A593 +
- ML023250413 +
- ML20097F480 +
- ML20206K480 +
- ML20212N873 +
- NPL-98-0183, Responds to NRC Re Violations Noted in Insp Repts 50-266/97-26 & 50-301/97-26 on 971201-980120.Corrective Actions:Addendum to Four Hour non-emergency NRC Notification Was Made on 980113 +
- 05000413/LER-1989-008, :on 890305,reactor Trip Occurred Due to Exceeding Overpower Delta T Loop 2 Setpoint.Caused by Personnel Error & Actuator Failure.Work Request Issued & Instrument Isolation Valve Replaced +
- 05000440/LER-1999-003-01, :on 990218,post-accident Dose Limits Were Exceeded.Caused by Relief Valve Leakage Outside of Containment.Removed Relief Valve on 990913,by Design Change Package Implemented Under 10CFR50.59.With +
- 05000281/LER-1986-011-02, :on 860720,determined That Svc Water Leaking Into Containment from Recirculation Spray HX (Rshx).Caused by Leaking Tubes in RSHX B.Tubes Plugged.Rshx Successfully Pressure Tested +
- 05000341/LER-1991-015, :on 910627,reactor Scram Occurred Due to Overheating at Main Transformer 2A.Caused by Offsite Util Maint Personnel Reassembling Isophase Bus Housing Incorrectly.Instruction Revised +
- 05000482/LER-1994-002, :on 940124,WCGS Entered TS 3.1.3.1 Action Statement (c)(4) Due to Electrical Problem W/Crdm M-12. Caused by Loose Cable Connector for CRDM M-12.Maint Performed on Connector +
- 05000346/LER-1990-011, :on 900712,safety Features Actuation Sys Level 1 Actuation Occurred Initiating Emergency Ventilation Sys & Isolating Containment Purge & Sample Sys.Caused by Personnel Error.Individual Counseled +
- 05000293/LER-1991-001, :on 910125,automatic Primary Containment Isolation Control Sys Group 5 Actuation Occurred,Resulting in Closing of RCIC Turbine Steam Supply Isolation Valves. Caused by High Flow Conditions +
- 05000311/LER-1982-151, Forwards LER 82-151/03L-0.Detailed Event Analysis Encl +
- IR 05000282/1989031 +
- 05000272/LER-1994-011, :on 940714,manual Reactor Trip Initiated Due to Loss of All Cw Pumps.Caused by Undervoltage Tripping of Cw Sys 4 Kv Switchgear Bus Infeed/Load Breakers.Time Delay Relays w/700 Millisecond Installed +
- 05000261/LER-2004-002, Entry Into Mode 3 with the Steam Driven Auxiliary Feedwater Pump Flowpath Inoperable +
- ML20042A433 +
- L-99-140, Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with +
- 05000395/LER-1985-028, :on 851007,inadvertent Safety Injection Occurred During Surveillance Test Procedure 125.011.Caused by Personnel Failure to Insert Manual Blocks Associated W/ Signals.Procedures Will Be Revised +
- 05000266/LER-1998-002, :on 980108,failure of High Voltage Station Auxiliary Transformer Occurred Due to Ground in Low Voltage Side Bus Duct.Operability of 1X03 Was Restored & Verified to Be in Operation by Infrared Scan +
- 05000293/LER-1996-008, :on 960918,RBCCW Heat Exchanger Was Declared Inoperable.Caused by through-wall Longitudinal Crack in Channel Cylinder Near Bottom on Lower Partition Plate. Cracks in Walls Repaired +
- 05000260/LER-1991-006, :on 910329,unplanned Reactor Protection Sys Actuation Occurred During Average Power Range Monitor B Drifted High & Exceeded Setpoint.Caused by Unexpected Failure.Affected Components Replaced +