- ENS 47515 +
- 05000293/LER-2001-006 +
- ML101550533 +
- ML100760445 +
- ML20023A780 +
- 05000311/LER-1991-010-02, :on 910723,ESF Actuation Signals Initiated. Caused by High Channel Spike on Channel 2R1B & Noble Gas Monitor 2R45C Due to Faulty Equipment Design.Detector Assembly Replaced & Design Mods Underway +
- ML20039G481 +
- ML20039G181 +
- ML20062F959 +
- ML20076H952 +
- ML20100R429 +
- ML20093F444 +
- ML20107B684 +
- ML20115J112 +
- IR 05000352/1985037 +
- ML20237A148 +
- RBG-28572, Special Rept:On 880521,invalid Failure of Div II Diesel Generator Occurred During Performance of Surveillance Testing.Caused by Operator Error.Diesel Generator Successfully Retested +
- 2CAN038806, Monthly Operating Rept for Feb 1988 +
- 05000382/LER-1987-027, :on 871125,discovered Fire Impairment When Installed Drain Pipe Not Capped at Either End.Caused by Inadequate Design Change Controls During Plant Const.Pipe Removed & New Procedures Implemented +
- 05000267/LER-1987-027, :on 871111,reactor Scram Logic Actuated W/ Reactor Shutdown & All Control Rods Fully Inserted in Core. Caused by Electrical Noise Induced Into Wide Range Channels IV & V.Review Identified No Cause of Noise +
- 05000293/LER-1999-008-02, :on 990805,automatic Scram Occurred While at 100% Power Due to Automatic Turbine Trip.Caused by Malfunction of Moisture Separator Drain Tank a Drain Valve Controller.Level Controllers Replaced.With +
- 05000324/LER-1996-003, :on 960317,units Declared Inoperable & Reactor Shutdown of Units Initiated.Caused by Corrosion Induced by Galvanic Coupling of Retainer Bolting.Corroded Bolting Replaced +
- 05000259/LER-1992-002-05, :on 920324,reactor Protection Sys Experienced Unexpected Failure,Causing Actuation of Esf.Cause Not Determined.Bus 1B Placed on Alternative Power,Alarms Reset & ESF Actions Returned to Normal +
- 05000397/LER-1984-064, :on 840623,100 Amp Circuit Breaker CB2B in Reactor Protection Sys Power Distribution Panel C72-POO1 Tripped Twice.Caused by Bad Connection on Cable BPRPS-9026. Connection Reworked & Breaker Reset +
- ML20059J130 +
- 05000382/LER-1993-006-02, :on 931019,UHS & WCT Water Basins Less than 97% Full.Caused by Failure to Follow Procedure.Logs Revised to Indicate DWST Level Should Be Maintained Higher than Piping Logs +
- 05000278/LER-1993-002-03, :on 930307,automatic Scram on Reactor Water Level When Reactor Feed Pump Feed Tripped on High Vibrations.Evaluation Will Be Performed on Defective Controller to Identify C/As Necessary +
- PLA-8095, 2023 Annual Radiological Environmental Operating Report (PLA-8095) +
- PLA-8122, Annual Radiological Environmental Operating Report (PLA-8122) +
- 05000272/LER-2077-048-03, Inoperabilit of No. 12 S/G Level Channel I +
- 05000260/LER-1992-006-02, :on 920728,automatic Main Turbine Trip & Reactor Scram Occurred from Indicated High Water Level Spike on Two of Three Level Channels.Caused by Inaccurate Evaluation & Diagnosis.Event to Be Reviewed +
- 05000296/LER-1992-004-04, :on 921104,chemical Release in Reactor Bldg Forced Evacuation of Compensatory Action Fire Watches. Caused by Unexpected Exothermic Chemical Reaction.Mfg (Master Builders,Inc) Conducted Training +
- 05000397/LER-1993-010, :on 940304,24 Reportable Problems Identified by Failure of Procedures to Fully Implement.Cause Was Less than Adequate Barrier & Controls for Program Changes.Corrective Actions Include Procedure & TS Changes +
- 05000293/LER-1999-008-01, Regarding Automatic Scram at 100 Percent Power Due to Turbine Trip +
- ML20041D812 +
- IR 05000295/1997026 +
- 05000293/LER-1990-005, :on 900320,480-volt Ac Load Ctr Breaker Did Not Open Automatically as Designed During Planned Bus B6 Transfer.Caused by Missing Retainer Ring.Breaker Sent to GE for Repair.Also Reported Per Part 21 +