Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000446/LER-2002-001, Reactor Trip Due to Primary Water Pump Vibration High Signal on June 6, 2002 +
- ML17317A874 +
- ML20082D552 +
- ML20116L084 +
- ML20245G243 +
- ML20217D231 +
- IR 05000373/1993026 +
- BECO-LTR-93-003, Monthly Operating Rept for Dec 1992 for Pilgrim Nuclear Power Station +
- 05000254/LER-1989-010, :on 890629,reactor Scram Occurred Due to Turbine Stop Valve Closure.Caused by Loose Connection on Condenser Low Vacuum Pressure Switch Indicating Lamp 1-5600-PS-105B.Connection Tightened +
- 05000282/LER-1998-004, :on 980226,inoperable ESF Equipment Was Noted in Alternate Train During DG Monthly Surveillance Run.Caused by Changes to Settings.Procedure Changes Will Be Completed to Ensure Proper Molr Setpoints +
- 05000320/LER-1986-007-02, :on 860727,grab Sample Not Taken & Analyzed within Tech Spec Limit of 24 H.Caused by Declaring Epicor II Ventilation Sys Monitor Inoperable on 860724.Another Grab Sample Obtained +
- 05000387/LER-1986-015, :on 860415,Div II LOCA Isolation Occurred, Causing Isolation of Zones I & III HVAC Sys,Initiation of Standby Gas Treatment Sys B & Control Room Emergency Outside Air Supply Sys B.Caused by Blown Fuse +
- 05000498/LER-1987-026, :on 871212,discovered That Degraded Undervoltage Coincident W/Safety Injection Not Tested.Caused by Personnel Misinterpretation of Trip Actuation Devise Operational Test Requirements +
- 05000341/LER-1985-050, :on 850814,reactor Water Cleanup Sys Isolated. Caused by Spurious Actuation of Temp Switches in Reactor Water Cleanup Sys Steam Leak Detection Sys.Engineering Evaluating Sys to Prepare Design Change +
- 05000353/LER-1992-004, :on 920221,24 & 26,HPCI Sys Inverter Power Supply Fuse Blew,Resulting in Inoperability of HPCI Sys Flow Control Circuitry.Caused by Degraded Inverter.Inverter Replaced on 920228 & Sent to Mfg +
- 05000280/LER-1987-013-01, :on 870623,unit Shutdown Commenced Due to High RCS Leak Rate.Caused by Failed Packing on Loop Stop Valve MOV-1593.Loop Stop Valves Repacked & Diaphragm on Drain Header Isolation Valve Replaced +
- 05000397/LER-1993-007, :on 930210,low RPV Level Reactor Scram Initiated by RPS in Response to Actual Low Water Level Condition.Caused by Connector Pin Corrosion.Suppression Pool Level Lowered +
- 05000397/LER-1991-034, :on 911123,residual Heat Removal Sys Differential Pressure Indicating Switch Found Isolated.Cause Indeterminate.Surveillance completed.RHR-DPIS-12B Restored to Svc +
- 05000335/LER-2010-007, For St. Lucie, Unit 1, Regarding Latent Failure of Steam Driven AFW Pump Led to Operation Prohibited by TSs +
- ML20040H162 +
- ML20203D481 +
- 05000293/LER-1989-026, :on 890830,automatic Scram Signal & Reactor Scram Resulted in turbine-generator Trip & Opening of 345 Kv Switchyard Air Circuit Breakers.Caused by Automatic Turbine Runback.Wiring to Relays Reversed +