Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18057A270 +
- ML20029A136 +
- ML052270089 +
- ML20148J589 +
- ML20129G326 +
- ML20214F347 +
- NL-89-379, Monthly Operating Rept for Mar 1989 for Rancho Seco Nuclear Generating Station +
- 2CAN088807, Monthly Operating Rept for Jul 1988 for Arkansas Nuclear One Unit 3 +
- ML24302A210 +
- 05000341/LER-1985-048, :on 850724,reactor Bldg HVAC Failed to Start After Planned Trip.Hvac Exhaust Isolation Damper Reopened When Isolation Signal Reset Despite Exhaust Fan Trip. Response Procedure Revised +
- 05000254/LER-1985-013-03, :on 850329,Train B Standby Gas Treatment Sys Started W/O Apparent Start Signal.Reactor Bldg Ventilation & Control Room Ventilation Sys Tripped.Caused by Relay 2-1701-100B Coil Failure.Relay Replaced +
- 05000341/LER-1992-008, :on 920919,electrician Did Not Open Bus 65F Trip Cutoff Switch,Resulting in Deenergization of Bus.Caused by Personnel Error.Continuing Training for Operations & Electrical Maint Will Be Emphasized +
- 05000277/LER-1992-012-01, :on 920717,reactor Scram Occurred When Main Generator Output Breaker Tripped Open & Caused Main Generator Power Load Unbalance Trip Signal.Caused by Severe Thunderstorm.Scram & Isolations Reset +
- 05000341/LER-1994-005, :on 940826,power Was Interrupted to Portion of Supply Shutoff Sys Control Logic Causing Actuations of Engineered Safety Feature Sys.Caused by Procedural Weakness. Procedures Revised +
- 05000461/LER-1989-035, :on 891129,during Channel Functional Test of ECCS Drywell Pressure Channel,Operator Selected Wrong Channel for Testing,Causing Isolation of Instrument Air Sys. Caused by Personnel Error.Briefing Conducted +
- ML20034F518 +
- 05000255/LER-1991-009, :on 910519,qualified Core Exit Thermocouple Occurred & Unable to Be Repaired While Plant Is at Power. Caused by Failure of Instrument.Corrective Action Document Initiated to Document Event +
- 05000335/LER-1995-005, :on 950809,pressurizer PORV Inoperable Due to Personnel Error.Removed & Reassembled Pressurizer Porvs +
- 05000397/LER-1988-014, :on 880512,RWCU Sys Resin Tank Spill Occurred. Caused by Open RWCU Sample Line Isolation Valves RWCU-V-442 & 443.RWCU-V-442 & 443 Tagged Shut & de-energized & Radwaste Control Room Operator Involved Counseled +
- 05000346/LER-2010-002, Regarding Control Rod Drive Nozzle Primary Water Stress Corrosion Cracking and Pressure Boundary Leakage +
- 05000354/LER-2004-010, Manual Reactor Scram Due to Moisture Separator Dump Line Failure +
- 05000269/LER-2003-001, For Oconee Nuclear Station, Regarding Design Oversight Resulting in Appendix R Control Cable Separation Issue +
- 05000325/LER-1993-008, :on 930313,severe Winter Storm Resulted in Spurious ESF Actuations & Loss of Offsite Power.Failed Cellon-treated Douglas Fir Poles Compromising Structure 10 Replaced W/Steel Poles +