Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ENS 49167 +
- L-2008-260, Environmental Protection Plans, Unusual or Important Environmental Event - Manatee +
- ML20041F540 +
- ML042600282 +
- ML023010176 +
- ML20082E284 +
- ML20071F982 +
- ML20202H639 +
- IR 05000254/1986015 +
- ML20245J906 +
- ML032380134 +
- BECO-LTR-96-097, Monthly Operating Rept for Oct 1996 for Pilgrim Nuclear Power Station +
- 05000414/LER-1987-021-01, :on 870727,condensate Transient Occurred Resulting in Reactor Trip.Cause of Event Unknown.Control Room Personnel Stabilized Unit in Mode 3,hot Standby & Condensate Flow Reestablished Manually +
- 05000265/LER-1986-012-08, :on 861006,during Full Power Instrument Maint, Reactor Water Level Transient Resulted in Reactor Scram. Caused by Personnel Error.Event Will Be Discussed W/Maint Dept Personnel +
- 05000352/LER-1986-046-01, :on 860923 & 26,main Control Room Ventilation Sys Isolated Due to High Chlorine Concentration Indications. Probably Caused by Rainwater Depositing on Chlorine Analyzer Probes.Related Correspondence +
- 05000382/LER-1987-003, :on 870122,radiation Monitor Alarmed Due to Contaminated Instrument & Controls (I&C) Technician.Caused by Health Physics Technician Improperly Downgrading Work Permit Requirements.I&C Technician Retrained +
- 05000352/LER-1986-046, :Between 860923-26,main Control Room Ventilation Sys Isolated Three Times.Caused by False High Chlorine Indications Due to Rainwater on Chlorine Analyzer Probes.Probe Relocation Being Evaluated +
- 05000334/LER-1987-019-01, :on 871209,radiation Monitor Failed Causing Main Filter Bank Ventilation Alignment.Caused by Failed Components & Wiring Problem in Radiation Monitor.Components Replaced & Wiring Corrected +
- 05000293/LER-1994-007, :on 941228,primary Containment Pressure Boundary Degraded Due to Uninstalled Instrument Plug.Caused by Personnel Error.Isolation Valves Will Be Installed on Selected Instruments +
- 05000334/LER-1994-005-01, :on 940601,transformer Fault Initiated Voltage Disturbance on Electrical Grid Which Caused Relay Actuation Due to single-phase Insulating Bushing Failure.Completed Outage Repairs & Testing Activities +
- 05000416/LER-1982-008-99, /99X-1:on 820626,during Testing of Carbon Dioxide (CO2) Fire Protection Sys,Ventilation Dampers for Div 1 & 2 Switchgear Rooms Failed to Close Upon CO2 Actuation Signal. Caused by Insufficient Power Supply to Melt Thermal Li +
- 05000346/LER-1993-006, :on 931015,containment Air Cooler Svc Water Valves Missed Surveillance Due to Procedural Inadequacy. Entered Containment & Verified That CAC SW Inlet Valves Were in Correct Position +
- 05000335/LER-1987-017-02, :on 871221,reactor Tripped Due to Protective Sys Hi Startup Rate B Channel in Trip & Loss of 1MD 120-volt Ac Instrument Bus.Caused by Personnel Error.Personnel Counseled on Following Procedures +
- 05000499/LER-2015-001, Regarding Technical Specification Action Statement Time Exceeded Due to Turbine-Driven Auxiliary Feedwater Pump Test Failure Not Recognized +
- 05000285/LER-1989-016, :on 890616,evaluation of Test Results Revealed That for Unknown Period Prior to 890614,auxiliary Feedwater Pump FW-10 Operability Was Outside Design Basis.Cause Unknown +
- ML20216F068 +
- ML20212E744 +
- 05000266/LER-1998-007, :on 980123,determined That Relay Installed in 1P-29 turbine-driven Auxiliary Fdw Pump Low Suction Pressure Trip Circuitry Possessed Incomplete Solder Connection.Caused by Incomplete Solder Connection.Circuitry Replaced +
- ML20197G657 +
- 05000414/LER-1987-021, :on 870727,condensate Transient Occurred Resulting in Reactor Trip.Cause Unknown.Work Request Originated to Identify Possible Equipment Malfunction Which Could Have Caused Reactor Trip +