Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000395/2012005 +
- 05000395/FIN-2012005-04 +
- ML17334B365 +
- ML17328A890 +
- ML20050B403 +
- ML20042A379 +
- ML042600282 +
- ML20080G313 +
- ML20117G082 +
- ML20112C953 +
- ML20214K399 +
- ML20215B097 +
- 05000339/LER-1987-014-02, :on 871022,accumulator Tank Inadvertently Injected Borated Water Into Rcs.Caused by Personnel Error. Administrative Procedure 5.8 Will Be Revised & Event Will Be Reviewed W/Operations Personnel +
- 05000341/LER-1986-046, :on 861219,determined That Differential Temp Trip Sys Inoperable.Caused by Personnel Error Resulting in Thermocouple Leads Being Mislanded.Leads Properly Installed & Personnel Disciplined +
- 05000374/LER-1985-046-02, :on 851007,w/HPCS Inoperable,Lpci Sys a Declared Inoperable.Caused by Misinterpretation of Definition of Operability.Criteria Will Be Developed Re Impact of out-of-svc Components on Operability +
- 05000499/LER-1991-010-01, :on 911224,pressurizer Spray Valve PCV-655C Failed Open,Resulting in Automatic Reactor Trip & SI Actuation on Low Pressure.Caused by Disengagement of Feedback Arm Linkage.Locking Nuts Added +
- 05000397/LER-1985-016, :on 850213,reactor Scrammed & HPCS Sys Automatically Initiated.Caused by Incorrect Differential Pressure Instrument Being Valved Into Svc.Instruments Verified for Proper Calibr +
- 05000281/LER-1984-014-01, :on 840821,while Replacing Relay PRB-XB, Auxiliary Feed Pump 2-FW-P-3B Started Upexpectedly.Caused by Incorrectly Positioned Jumper Installed to Prevent Unnecessary Relay Actuation.Jumper Reinstalled +
- 05000267/LER-1983-049-03, /03L-0:on 831110,reactor Operated at Power W/ Average Core Outlet Temp Greater than 1,200 F & Total Primary Coolant Oxidants Greater than 10 Ppm.Caused by Moisture Ingress & Use of Helium Purification Sys +
- 05000266/LER-1995-003-01, :on 950325,inadvertent EDG Start.Caused by Error Made by Test Engineer.Edg Was Shutdown & Restored to Normal stand-by Mode +
- 05000461/LER-1995-005, :on 950515,RRPs Tripped from Fast to Slow Speed Due to Fault in Reactor Recirculation Control Panel +/- 15 Volt Dc Field Bus Bars.Nest Assembly Which Contained Faulty Field Bus Bars Replaced W/Spare Nest Assembly +
- 05000498/LER-1990-019, :on 900708,discovered That Daily 24-h Power Range Nuclear Instrumentation Channel Calibr Surveillance Not Performed.Caused by Inadequate Mgt Controls.Control Room Logs Revised +
- ML20034A929 +
- 05000293/LER-2016-004, Regarding Salt Service Water Pump B Past Operability - Operation or Condition Prohibited by Technical Specifications +
- 05000423/LER-1991-014, :on 910609,reactor & Subsequent Turbine Trip Occurred.Caused by phase-to-ground Fault on 345 Kv Sys Transmission Line & Loose Restraint Tap of Relay.Tap Screw & Wiring Repaired & Relay Returned to Svc +