VEINONT YAMEE NUCLEAR POWER STATION WNTH.Y STATISTICAL REPORT 86-07 l
FOR THE K) NTH OF Jll.Y,1986 VYDPF 0411 Original 03%hk 3UP6
[
,\\r s
w OPERATING 04TA REPORT DOCKET f0.
50-271 DATE 860810 COWLETED BY G.A. Wallin TELEPHOPE (802) 257-7711 a
OPERATING STATUS Notes:
1.
Unit Names Vermont Yankee 2.
Reporting Period:
July 3.
Licensed Thermal Power (MWt):
1593 4.
Nameplate Rating (Gross MWe):
540 5.
Design Electrical Rating (Net MWe):514(oc) 504(cc) 6.
Maximum Dependable Capacity (Gross MWe):
535 7.
Maximum Dependable Capacity (Net MWe):
504 _
8.
If changes occur in capacity ratings (Items Number 3 through 7) since last report, give reasons:
N/A 9.
Power level to which restricted, if any (Net MWe): N/A
- 10. Reasons for restrictions, if any:
N/A This month Yr-to-Date Cumulative
- 11. Hours in Reporting Period 744.00 5087.00
- 12. Number of Hours Reactor was Critical 714.13 714.55 93825.61
- 13. Reactor Reserve Shutdown Hours 0.00 0.00 0.00
- 14. Hours Generator On-Line 648.57 648.57 91366.92
- 15. Unit Reserve Shutdown Hours 0.00 0.00 0.00
- 16. Gross Thermal Energy Generated (MWH) 915088.50 915088.50 133024719.50
- 17. Gross Electrical Energy Generated (MWH)
_290965.00 290965.00 44246867.00
- 18. Net Electrical Energy Generated (MWH) 271725.00 271725.00 41971975.00
- 19. Unit Service Factor 87.17 12.75 75.21
- 20. Unit Availability Factor 87.17 12.75 75.21
- 21. Unit Capacity Factor (using MDC Net) 72.46 10.60 68.55
- 22. Unit Capacity Factor (using DER Net) 71.05 10.39 67.21
- 23. Unit Forced Outage Rate 0.00 0.00 6.88
- 24. Shutdowns scheduled over next 6 months (Type, Date and Duration of Each):
N/A
- 25. If shut down at end of report period, estimated date of startup:
N/A
- 26. Units in Test Status (prior to commercial operation): N/A Forecast Achieved INITIAL CRITICALITY VYDPF 0411.01 INITIAL ELECTRICITY Original COM4ERCIAL OPERATION f
l t
i
14 -
~
. AVERAGE'ORILY LMIT POWER LEVEL
. DOCKET 10. -
50-271 UNIT Vermont Yankee 04TE' 860710-COWLETED BY.
G.A. Wallin-TELEPHONE.
(802) 257-7711
>0 NTH' July DAY. ~ AVERAGE DAILY POWER LEVEL mY AVERAGE DRILY-POWER LEVEL (MWe-Net)-
-(MWe-Net).
1 0
17 483 2
0 18 479 3
12 19 478 4
0-~
20 462 5
61 21 483
'6 81 22 484 7
154 23 482'
-8 274 24 -
481 9
362' 25 481 10 392 26
-480 11 402 27 475-12 472 28 480 13 460 29 481 14 485 30 485 15 484 31 486
[
16 484 1-INSTRUCTIONS:
On this format, list the average daily unit pcwer level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
j VYDPF 0411.02 j
Original
DOCKET 70.
50-271 LNIT P4W4E Vermont Yankee UNIT SHUTDOWNS AND POWER PEu:TIONS
~
DRTE 860810-1 COWLETED BY G. A. Wallin REPORT E NTH July TELEPHOPE (802) 257-7711 1
2 3
4 5
No.
Date Type Duration Reason Method of License System Component Cause and Corrective Action to (hours)
Shutting Down Event Code-
. Code Prevent Recurrence Reactor Report #
85-14 860701 S
63.00 C
1 N/A NA NA 1985/1986 RefuelingA4aintenance/
(cont:
Recirc Pipe Replacement Outage.
86-01 860703 S
32.43 8
N/A N/A N/A NA.
Turbine Overspeed Testing 86-02 860710 S
0.00 8
4 N/A CB PLMPXX Power Reduction for Recirc Power Piping Stability Testing Reduction 86-03 860713 S
0.00 B
4 N/A CB Ptw XX Power Reduction for Recirc -
Power Piping Stability Testing Reduction 86-03 860713 S
-0.00 8
4 NA RB CONm0 Power Reduction for Turbine and (cont:
Power Control Rod Surveillance Reduction 1
2 3
4 F-Forced A-Equipment Failure (Explain)
Method:
Exhibit G'- Instructions S-Scheduled B-Maintenance or Test 1-Manual for Preparation of Data Entry C-Refueling 2-Manual Scram Sheets for Licensee Event D-Regulatory Restriction 3-Automatic Scram Report (LER) File (NUREG 0161)
E-Operator Training and License Examination 4-Other (Explain)
F-Administrative 5
VYDPF 0411.03 G-Operational Error (Explain)
Exhibit I - Same Source Original H-Other (Explain)
J e
e 1
e 1
k 7
N n
n 7 O
a i
I Y
l 7
T l
5 C
t a 2 A
1 n 0 W
7 o 1
)
E 2
m 8
. 2 V
- r 0 A. 0 I
0 J
6 8
T 5
V 8 G (
CE Y
R B
R O
D C
o EE t
TO T
E t E
LF KTEPE CITML ON4OE DUDCT TL lS E
NO I
T CNUFLRM E
SU AC EG E
A
\\
C T
N U
A OR T%
N E
E RB T
ON N
L
\\
I RN A
E M
L D
ET E
A FC L
ON E
A R
EN RE Y
UT T
TN E
MI F
P R A
M S
TNEM P
I 4
U 0
QE 1
1 e
4 l n
0 a o
n N
Fi P g Di Y r VO i
r-a DOCKET NO.
50-271 UNIT
,V:rmont Yankee O
- f:-
DATE 860810 COMPLETED BY G.A. Wallin TELEPK)tE (802) 257-7711 REPORT K) NTH July SLM4ARY OF OPERATING EXPERIENCES Highlights t
Vermont Yankee. operated at 77.2% of rated thermal power for the month.
Gross slactrical generation was 290,965 MWH or 72.4% of design e
electrical capacity.
Operatina Summary The following is a chronological description of plant operations including other pertinent items of interest for the month At the beginning of the reporting period the plant was operating at 0% of rated thermal power.
860702 At 0552 hours0.00639 days <br />0.153 hours <br />9.126984e-4 weeks <br />2.10036e-4 months <br />, the reactor was critical.
860703 At 1500 hours0.0174 days <br />0.417 hours <br />0.00248 weeks <br />5.7075e-4 months <br />, the turbine generator was phased to the grid.
860703 At 1945 hours0.0225 days <br />0.54 hours <br />0.00322 weeks <br />7.400725e-4 months <br />, the turbine generator was removed from the grid for overspeed-testing.
1860705 At 0411 hours0.00476 days <br />0.114 hours <br />6.795635e-4 weeks <br />1.563855e-4 months <br />, the turbine ganerator was phased to the grid.
- 860710 At 1644 hours0.019 days <br />0.457 hours <br />0.00272 weeks <br />6.25542e-4 months <br />, the "A" recirc pump was tripped for Stability Testing.
(See Unit Shutdowns And Power Reductions.)
860710 At 1847 hours0.0214 days <br />0.513 hours <br />0.00305 weeks <br />7.027835e-4 months <br />, the "A" recirc pump was started.
' 860713 At 1025 hours0.0119 days <br />0.285 hours <br />0.00169 weeks <br />3.900125e-4 months <br />, the "B" recirc pump was tripped for Stability Testing.
(See Unit Shutdowns and Power Reductions.)
860713 At 1122 hours0.013 days <br />0.312 hours <br />0.00186 weeks <br />4.26921e-4 months <br />, the "B" recirc pump was started.
860713 At 1200 hours0.0139 days <br />0.333 hours <br />0.00198 weeks <br />4.566e-4 months <br />, following final Stability Testing, Control Rod and Turbine surveillances were initiated.
860713 At 1300 hours0.015 days <br />0.361 hours <br />0.00215 weeks <br />4.9465e-4 months <br />, Control Rod and Turbine surveillances were completed and a return to full power was started.
At the end of the reporting period the plant was operating at 99.9% of rated thermal power.
VYDPF 0411.05 Original
VERMONT YANKEE NUCLEAR POWER CORPORATION P. O. BOX 157 GOVERNOR HUNT ROAD j
VERNON, VERMONT 05354 VYV 86-239 August 10,' 1986 U. S. Nuclear Regulatory Commission Director, Office of Management Information and Program Control Washington, D. C.
20555
Dear Sir:
Submitted herewith is the Monthly Statistical Report for the Vermont Yankee Nuclear Power Station for the month of July,1986.
Very truly yours, VERM)NT YAWEE NUCLEAR POWER CORP.
f@
Warren P MurpMy Vice Pre ident an Manager of Operations WPM / TAW /lat:MSRl.lA4SR VYDPF 0411