Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ENS 49306 +
- ML17263A699 +
- ML062850296 +
- ML20052G120 +
- ML20086G772 +
- ML20084H251 +
- ML20135G133 +
- ML20135F928 +
- ML20133G577 +
- ML20202H639 +
- ML20235J618 +
- ML20087D277 +
- 05000298/LER-2024-002, Technical Specifications Prohibited Condition for Inoperable Service Water Booster Pump +
- 05000336/LER-1986-020-01, :on 861129 & 1223,sensed Undervoltage Condition Caused Loss of 4,160-volt Power to Vital Bus 24C.Caused by Improperly Installed Bus Voltage Potential Sensing Drawer. Drawer & Cover Realigned +
- 05000412/LER-1996-008-01, :on 961203,manual Reactor Trip Initiated During Core Physics Testing.Manual Trip Was Initiated as Result of Conservative Management Decision to Place Plant in Safe, Shutdown Condition in Order to Perform Testing +
- 05000341/LER-1985-016, :on 850509,scram & Several Primary Containment Isolations Occurred.Caused by Improper Valving on Reactor Water Level Instrument.Personnel Counseled.Permanent Installation Planned +
- 05000261/LER-1983-027-01, /01T-0:on 831103,while in Hot Shutdown,Cooling Coil Leaks Discovered on Containment Fan Coolers HVH-1 & HVH-3.Cause Not Stated.Coolers Being Repaired W/Ceramic Sealant Matl +
- 05000317/LER-1989-020, :on 891113,determined That Some Solenoid Valves & Valve Power Supplies for Saltwater Sys May Not Be Able to Perform Design Function After Design Basis Seismic Event. Cause Undetermined.Power Supplies Upgraded +
- 05000334/LER-1978-043-01, /01T-0:on 780728,electrical Fault Caused Generator Trip & Loss of Power.Caused by Main Generator Field Flash Relay Out of Stop.Failure Could Not Be Duplicated.Generator Tested Satisfactory +
- 05000272/LER-1992-011, :on 920523 & 0627,ESF Signal Actuations for Control Room Ventilation Automatically Switched from Normal to Accident Mode of Operation.Caused by RMS Channel Spike. Detector Connector Grommet Replaced +
- 05000397/LER-1992-034, :on 920713,determined That Nonwater Tight Penetration Seals in ECCS Pump Rooms Could Result in Common Mode Failure from Flooding.Inadequate Penetration Seals in ECCS Pump Rooms Except for Door Seals Reworked +
- 05000259/LER-2009-006-01, 1 for Brown Ferry, Unit 1 Regarding Inoperable High Pressure Coolant Injection Pump Due to Emergency Core Cooling System Inverter Failure +
- 05000440/LER-2011-002, Regarding Condition Prohibited by Technical Specifications and Plant Shutdown Due to Unit 1 Startup Transformer Issues +
- 05000259/LER-2009-006, Regarding Inoperable High Pressure Coolant Injection Pump Due to Emergency Core Cooling System Inverter Failure +
- ML20212E744 +
- 05000352/LER-1997-012, :on 971120,unplanned Closure of Primary Containment Isolation Valve Occurred.Caused by an Inaccurate Drawing & an Inadequate Partial Surveillance Test. Engineering Change Request Was Initiated +