- ENS 48664 +
- ML18158A130 +
- NL-03-083, April 2003 Monthly Operating Report for Indian Point 3 +
- ML20128P359 +
- ML20199D031 +
- ML20211H412 +
- IR 05000327/1990034 +
- 05000414/LER-1987-002, :on 870128,reactor Trip Occurred Due to Accidental Shorting of Test Cable & Auxiliary Feedwater Start.Caused by Personnel Error.Control Room Personnel Stabilized Unit & Shorted Cable Removed +
- 05000220/LER-1986-035, :on 861210,secondary Containment Temporarily Breached When Security Guard Opened Air Lock Door.Caused by Personnel Error.Clarification of Rules for Responding to Alarms at Air Lock Doors Issued +
- 05000325/LER-1999-003-01, :on 970724,chlorinator Flange Leak Resulted in Cb Emergency Air Filtration Sys Actuation.Caused by Inadequately Manufactured Gas Inlet Line Spool Piece. Chlorinator Flange Inlet Line Spool Piece 2 Was Replaced +
- 05000293/LER-1988-024-01, :on 881017,Group 1 Isolation Signal Due to High Water Level in Reactor Vessel Occurred.Caused by Disassociation of Pin from Feedback Cam Linkage of Valve Positioner for Valve.Linkage Secured +
- 05000341/LER-1985-062, :on 850909,intermediate Range Monitor Channels B & D Inoperable Due to Weekly Channel Functional Test Not Completed on Time.Caused by Staff Not Being Aware of Surveillance Time Limit.Test Completed +
- 05000341/LER-1985-059, :on 850903,Group 1 Isolation Initiated High Pressure Trip.Caused by Exceeding Condenser High Pressure Setpoint During Sensing Line Refill.Condenser Pressure Instruments Recalib.Lines Will Be Monitored +
- 05000454/LER-1995-005, :on 951010,discovered Fire Protection Rept Discrepancies.Caused by Inadequate Evaluations During Preparation of Original Analysis.Established Hourly Fire Watches & Installed Darmatt KM1 Fire Barrier +
- 05000293/LER-1992-016, :on 921213,automatic Scram Resulting from Load Rejection Occurred While at 48 Percent Reactor Power.Caused by 345 Kv Switchyard Flashovers Due to Salt Deposited During Severe Coastal Storm +
- 05000265/LER-1995-005-09, :on 950825,Units Experienced Automatic Reactor Scram During EHC Pressure Regulator fail-over Test.Caused by Inadequate EHC Sys Pressure Regulator Setpoint Bias.Adjusted EHC Sys Pressure Setpoint Bias & Time Lag Constants +
- 05000397/LER-1984-084, :on 840812,notification Received Re Grass Fire Approaching Plant Boundaries.Cause Not Stated.Diesel Generators Brought on Line to Supply safety-related Electrical Loads.Fire Terminated +
- 05000454/LER-1995-005-10, :on 951010 & 13,identified Fire Protection Rept (FPR) Discrepancies Due to Inadequate Evaluations During Preparation of Original Safe Shutdown Analysis.Criteria for Reporting Deficiencies in FPR Established +
- 05000277/LER-1992-003-01, :on 920313,determined That RHR Pumps 2B & 2D Could Have Potentially Been Placed in Inoperable Condition Had Low Energy Pipe Failed in RHR Rooms.Cause Not Determined.Discharge Check Valves Installed +
- 05000498/LER-1991-017, :on 910526,control Room Ventilation Sys Actuated to Recirculation Mode as Result of Spurious Trip from Toxic Gas Analyzer.Possibly Caused by Poor Electrical Connection.Analyzer Reworked +
- ML20035E799 +
- ML20027A157 +
- ML20041B155 +
- 05000255/LER-1993-003, :on 930428,unusual Event Declared & Plant Shutdown Commenced Due to Primary Coolant Sys Unidentified Leakage in Excess of Ts.Leaking CRDM Mechanical Seal Packages Repaired +
- 05000293/LER-2013-001, Inadvertent Trip of Both Recirculation Pumps and Subsequent Manual Scram +
- 05000416/LER-2012-006, Regarding Special Nuclear Material Inventory Discrepancy +
- 05000251/LER-2006-001, Re Containment Purge Penetration Fails Leak Rate Test Due to Inadequate Preventive Maintenance on Isolation Valve +
- 05000341/LER-1989-019, :on 890819,pressure Control to HVAC Sys Lost, Resulting in Decrease in Control Room Air Pressure.Caused by Seized Bearings & Fan Not Rotating.Shaft & Bearings Replaced & Fan Placed Back in Svc +
- 05000271/LER-1988-012, :on 880928,2 Amp Fuse Blew in CP-30 Control Module Due to Overloaded Power Supply in Vital Fire Protection Control Panels.Caused by Personnel Error.Fire Protection Drawings Revised +
- 05000454/LER-1995-005-01, :on 951010,identified Fire Protection Discrepancies.Caused by Inadequate Evaluations During Preparation of Original Analysis.Continued Hourly Fire Watches & Installed Darmatt KM 1 Fire Barrier +
- 05000341/LER-1995-004, :on 950409,unexpected Reactor Water Level 2 & ESF Actuations Occurred After Planned Scram.Caused by Selection of Parameters Used in Post Scram FW Logic Mod Per Engineering Design Package 9207 Installed During RF04 +
- 05000499/LER-1994-007-02, :on 940625,main Transformer Lockout Relay Actuated.Caused by Failure of Capacitor within Pilot Wire Relay.Annunciator Response Procedures Have Been Revised & Faulty Pilot Wire Relay Was Replaced +