Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ENS 44109 +
- ML18095A242 +
- ML19256F333 +
- ML19296D145 +
- NL-02-144, October 2002 Monthly Operating Report for Indian Point Unit No.2 +
- ML20082H545 +
- ML20077Q127 +
- ML20077A010 +
- ML20100L797 +
- ML20065C584 +
- 1CAN078509, Monthly Operating Rept for June 1985 +
- 05000352/LER-1988-042, :on 881223,inoperability of Plant Sys Due to Unacceptable Physical Separation Between safety-related Cabling Determined.Caused by Personnel Error.Plant Procedure Will Incorporate Consolidated Open Items List.W/Undated Ltr +
- 05000346/LER-1988-029-01, :on 890118,reactor Trip from 100% Power Initiated by Spurious CRD Trip Confirm Signal,Causing Integrated Control Sys to Initiate Rapid Feedwater Reduction.Caused by Narrowing Signal +
- ML20217A478 +
- 05000281/LER-1986-010-02, :on 860711,pump B Discharge Pressure Dropped to Zero,Causing Inoperability of Both Charging Pumps a & B. Caused by Air Introduced in Sys During Maint on Pump A.Pump Vented.Both Pumps Returned to Svc +
- 05000373/LER-1986-021, :on 860608,ESF Damper Actuated.Caused by Spurious Trip on High Radiation Monitor/Detector 2D18-K751D Due to Apparent Bad Connector from Indicator Relay.Detector Observed.No Further Problems Noted +
- 05000373/LER-1987-009-01, :on 870217,while Removing Jumpers Installed Per LIS-VR-03,Group IV Isolation Occurred.Caused by Instrument Maint Procedure Inadequacy.Procedure Being Deleted & Replacement Surveillance Being Generated +
- 05000373/LER-1986-021-02, :on 860608,ESF Actuation of HVAC Emergency make-up Train B Occurred Due to Spurious Radiation Monitor Trip.Cause Attributed to Electronics Problem W/Radiation Detector 2D18-K751D.Detector Replaced +
- 05000338/LER-1988-018, :on 880405,channel Check Surveillance for Containment post-accident Pressure Instruments Missed. Caused by Failure to Recognize That Tech Spec 3.3.3.6 Requirements Met.Tech Spec 3.3.3.6 Entered +
- 05000413/LER-1987-047, :on 871221,reactor Trip Signal Occurred Due to Steam Generator lo-lo Level.Cause Unknown.Operator Update Issued to Assure All Licensed Operators Aware of Procedure for Equalizing Pressure Across MSIVs +
- 05000336/LER-1994-001-02, :on 940118,auxiliary Feed Regulating Valves to Meet Inservice Test Stroke Time,Failed.Caused by Presence of Hydraulic Forces Across Valve Plug.Ist Acceptance Criteria Was Revised +
- 05000325/LER-1991-028, :on 911105,primary Containment Isolation Sys Received Spurious Valve Group 3 Isolation Signal,Resulting in Automatic Closure of RWCU Inlet Inboard Isolation Valve. Caused by Relay Failure.Coil Replaced +
- 05000346/LER-1993-007, :on 931020,after Preventive Maint,Determined Train of AFW & Motor Driven Feedwater Pump Incapable of Feeding SG 1 Should SG 2 Fail.Caused by Misunderstanding of AFW Sys.C/A:Review Chapter 15 of USAR +
- 05000293/LER-1993-018, :on 930721,planned Shutdown Initiated Due to Unidentified Leakage of 3 Gpm.On 930722,planned Shutdown Became TS Required Shutdown When Insp Revealed Leakage to Be Rc Pressure Boundary Leakage.Leakage Repaired +
- 05000311/LER-1982-016, Forwards LER 82-016/03L-0.Detailed Event Rept Encl +
- BECO-LTR-93-098, Monthly Operating Rept for Jul 1993 for Pilgrim Nuclear Power Station +
- 05000285/LER-1990-006, :on 900226,unplanned Actuation Occurred in Backup Trip Circuit for 345 Kv Breaker 3451-5.Probably Caused by Physical Disturbance & Resultant Actuation of Relay.Evaluation Will Be Performed +
- 05000029/LER-1983-015-03, /03L-0:on 830506,during Mode 1 operation,Y177,115- Kv Line Opened for Routine Maint,Contrary to Tech Specs 3.8.1.1.a.Caused by Scheduled Maint Insp of 115-kV Transformers.No Corrective Action Necessary +
- 05000285/LER-1989-019, :on 890924,indication of High Temp for Reactor Coolant Pump RC-3A Upper Motor Thrust Bearing Received in Control Room.Caused by Damaged Cable for Bearing Resistive Temp Device.Damaged Cable Replaced +
- ML24358A157 +
- 05000311/LER-1993-002-01, :on 930128,pumps Tripped on Low Suction Pressure.Caused by Equipment Failure.Loose SGFP Master Controller Test Jack Repaired & Other Jacks in SGFP Speed Control Loop Inspected & Repaired as Required +
- IR 05000255/1980013 +
- 05000400/LER-1989-001, :on 890116,w/plant in Mode 1,reduction of Turbine Load Ensued & Turbine Trip Occurred Due to Low Condenser Vacuum Resulting in Automatic Reactor Trip.Caused by Personnel Error.Personnel Counselled +
- 05000400/LER-1989-001-02, :on 890116,while Restoring Direct Vent Path to Atmosphere,Turbine Load & Turbine Trip Occurred Due to Low Condenser Vacuum.Caused by Lack of Shift Foreman Clearance on Manual Valve.Personnel Counseled +
- 05000446/LER-2006-003, Regarding Reactor Trip Due to Feedwater Regulating Valve Malfunction +
- 05000247/LER-2002-006, Two of Three Emergency Diesel Generators Inoperable Due to Component Failure; a Condition Prohibited by Tech Specs +
- 05000346/LER-1989-003, On 890118,reactor Trip from 100% Power Occurred Due to Spurious CRD Trip Confirm Signal.Cause of Signal Narrowed to at Least One of Three Logic Boards in CRD Sys Logic Cabinet 1.Boards to Be Returned +