Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20205B027 + (ML20205B027)
- ML20205B029 + (ML20205B029)
- PNO-I-86-061, on 860806,equipment Qualification Discrepancy Identified W/Field Wiring within Limitorque Valve Operators in Containments.Both Units Shut Down to Replace Questionable Wires W/Qualified Wires + (ML20205B030)
- ML20205B032 + (ML20205B032)
- ML20205B033 + (ML20205B033)
- IR 05000373/1986030 + (ML20205B034)
- ML20205B035 + (ML20205B035)
- ML20205B036 + (ML20205B036)
- ML20205B037 + (ML20205B037)
- ML20205B040 + (ML20205B040)
- ML20205B041 + (ML20205B041)
- ML20205B046 + (ML20205B046)
- ML20205B047 + (ML20205B047)
- IR 05000412/1986018 + (ML20205B048)
- ML20205B050 + (ML20205B050)
- ML20205B051 + (ML20205B051)
- ML20205B052 + (ML20205B052)
- ML20205B056 + (ML20205B056)
- ML20205B057 + (ML20205B057)
- IR 05000438/1986004 + (ML20205B062)
- ML20205B063 + (ML20205B063)
- IR 05000280/1986011 + (ML20205B065)
- ML20205B066 + (ML20205B066)
- ML20205B067 + (ML20205B067)
- ML20205B068 + (ML20205B068)
- ML20205B071 + (ML20205B071)
- ML20205B072 + (ML20205B072)
- ML20205B076 + (ML20205B076)
- PY-CEI-NRR-0504, Forwards Description of Emergency Procedures Developed for Hydrogen Igniter Sys,Per Paragraph 2.C.10(b) of License NPF-45.Specific Instruction Under Review & Will Be Approved Upon Receipt of Sser 10 + (ML20205B078)
- ML20205B079 + (ML20205B079)
- ML20205B084 + (ML20205B084)
- ML20205B087 + (ML20205B087)
- ML20205B090 + (ML20205B090)
- ML20205B092 + (ML20205B092)
- ML20205B093 + (ML20205B093)
- ML20205B098 + (ML20205B098)
- IR 05000261/1986007 + (ML20205B099)
- ML20205B100 + (ML20205B100)
- ML20205B101 + (ML20205B101)
- PNO-I-86-062, on 860807,plant Shut Down Due to Packing Leak on RCIC Testable Check Valve AO-22.Caused by Manual Scram. Licensee Will Repair & Test Valve When Cold Shutdown Reached + (ML20205B102)
- 05000440/LER-1987-011, :on 870227,during Audit,Discovered That on 861021,independent Verification of Discharge Path Valve Line Not Performed Prior to Commencing Liquid Radwaste Discharge Release.Caused by Failure to Follow Procedure + (ML20205B104)
- ML20205B107 + (ML20205B107)
- ML20205B109 + (ML20205B109)
- ML20205B110 + (ML20205B110)
- ML20205B112 + (ML20205B112)
- ML20205B116 + (ML20205B116)
- ML20205B119 + (ML20205B119)
- ML20205B121 + (ML20205B121)
- ML20205B122 + (ML20205B122)
- JPN-88-055, Responds to NRC Bulletin 88-008, Thermal Stresses in Piping Connected to Rcs. Encl Provides Description of Review That Concluded That Condition in Bulletin Highly Unlikely to Occur at Facility + (ML20205B124)
- ML20205B126 + (ML20205B126)