Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20148Q543 + (ML20148Q543)
- 05000302/LER-1996-001, :on 960110,personnel Error Results in Operation Outside 10CFR50,App R Design Basis.Brought Affected Circuits Back Into Compliance W/App R & Completed Field Validation of Selected App R Drawings + (ML20148Q547)
- ML20148Q562 + (ML20148Q562)
- ML20148Q564 + (ML20148Q564)
- ML20148Q575 + (ML20148Q575)
- ML20148Q578 + (ML20148Q578)
- ML20148Q584 + (ML20148Q584)
- IR 05000133/1987006 + (ML20148Q594)
- ML20148Q597 + (ML20148Q597)
- 05000219/LER-1996-011, :on 961026,discovered Primary Leak Rate Above TS Limit.Caused by Improper Valve Reassembly on V-26-5 During 16R Outage.Replaced Valve V-26-5 O Rings,Reassembled Subject Valve & Revised Procedures + (ML20148Q605)
- ML20148Q610 + (ML20148Q610)
- ML20148Q626 + (ML20148Q626)
- ML20148Q629 + (ML20148Q629)
- ML20148Q647 + (ML20148Q647)
- ML20148Q653 + (ML20148Q653)
- ML20148Q657 + (ML20148Q657)
- ML20148Q661 + (ML20148Q661)
- ML20148Q677 + (ML20148Q677)
- 05000267/LER-1987-031, :on 871225,hot Reheat Temp High Scram Occurred. Caused by Operator Inattention to Plant Conditions.Reactor Returned to Power on 871227 & Consequences of Inattention to Plant Parameters Reviewed W/Operator + (ML20148Q678)
- ML20148Q680 + (ML20148Q680)
- ML20148Q684 + (ML20148Q684)
- ST-HL-AE-2447, Submits Revised Response to NRC Question 241.05N Re Essential Cooling Pond (ECP) Seepage,Per 871112 Submittal & Subsequent Discussions.Water Balance Survey of ECP Will Be Performed at Frequency Not to Exceed Once Every 5 Yrs + (ML20148Q688)
- IR 05000336/1987031 + (ML20148Q689)
- ML20148Q690 + (ML20148Q690)
- ML20148Q693 + (ML20148Q693)
- ML20148Q695 + (ML20148Q695)
- ML20148Q705 + (ML20148Q705)
- ML20148Q710 + (ML20148Q710)
- ML20148Q713 + (ML20148Q713)
- ML20148Q714 + (ML20148Q714)
- ML20148Q721 + (ML20148Q721)
- ML20148Q722 + (ML20148Q722)
- ML20148Q724 + (ML20148Q724)
- TXX-8833, Responds to NRC Re Open Items Noted in Insp Repts 50-445/87-37 & 50-446/87-28.Results of Engineering Functional Evaluation of Items Identified in Ci Grimes 880208 & s Scheduled for Completion in May 1988 + (ML20148Q733)
- ML20148Q736 + (ML20148Q736)
- ML20148Q742 + (ML20148Q742)
- ML20148Q744 + (ML20148Q744)
- ML20148Q745 + (ML20148Q745)
- ML20148Q746 + (ML20148Q746)
- ML20148Q750 + (ML20148Q750)
- ML20148Q757 + (ML20148Q757)
- ML20148Q761 + (ML20148Q761)
- ML20148Q762 + (ML20148Q762)
- 05000324/LER-1988-006-02, :on 880308,control Rod 10-39 Unknowingly Withdrawn W/Reactor Protection Sys Shorting Links Installed. Caused by Personnel Error.Individuals Involved Counseled & Process of Software Mod to Be Reviewed + (ML20148Q766)
- ML20148Q767 + (ML20148Q767)
- ML20148Q771 + (ML20148Q771)
- W3P88-0967, Forwards Revised Attachments 2 & 3 to Updated QA Program Description,Fsar Chapter 17.2 to Aid in Review + (ML20148Q775)
- ML20148Q777 + (ML20148Q777)
- 05000482/LER-1987-058, :on 871223,violation of Facility Tech Specs Occurred & Detector Cables for Containment High Range Radiation Monitors Not Installed W/Equipment Qualification Requirements.Caused by Personnel Error + (ML20148Q779)
- ML20148Q782 + (ML20148Q782)
- BSEP-88-0394, Responds to Violations Noted in Insp Repts 50-324/88-06 & 50-325/88-06.Corrective Actions:Periodic Test Procedures Revised to Specify Method for Stroke Time Testing air-operated Valves + (ML20148Q797)